We are begining to exceed Galore without the giant capex and other logistical problems. We have sufficient grades to go mining for Silver so I expect this will be included in the reRE. I expect we may want to redo the bfs because the grades in the North will continue to produce thick bands of silver and I expect our gold to go up.

Because these are spread out a bit in the brechia systems we are using wieghted averages that appear to be lower in value. The reality is the opposite. 1600 grams followed by 200 grams. If we just went in there for the best of the grades we could have a 10 year life of high value. Given the mineral mix it's hgard to ignore the copper and moly! So are we a precious metals operation or a large scale open pit? If we keep hitting swarms our thinking might change. Sure, well still go large scale but the concentrates will be viewed differently.

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. I had a quick flip back to the July 2011 RE NR and noticed this line about 2011 drilling, Paramount and a new RE:

    Top of page 2: http://sedar.com/GetFile.do?lang=EN&docClass=8&issuerNo=00020511&fileName=/csfsprod/data120/filings/01771892/00000001/k%3A%5Cfilings%5CBranded%5C2011%5C0711%5Ccopperfox%5Ccopperfox0711.pdf

    "....The 2011 drilling program is focusing on the higher-grade mineralization intersected in the Paramount zone in 2010 with the objective of defining a higher-grade “starter pit” and increasing the tonnage and average grade of the metals in this zone. Copper Fox expects to complete a resource estimate update for this zone after completion of the 2011 drilling program”.

    The actual RE report ( ) offers this description of Paramount:

    Top of page 1-7 http://sedar.com/GetFile.do?lang=EN&docClass=24&issuerNo=00020511&fileName=/csfsprod/data122/filings/01798879/00000001/k%3A%5Cfilings%5Clivework%5Cwkout%5C32680%5CTechRpt.pdf

    "...The second-largest zone is the Paramount zone, situated north of the Main zone, which is characterized by primary sulphide mineralization associated with an intrusive breccia phase, containing chalcopyrite, bornite, and molybdenite; quartz–carbonate stockworks; and late fracture molybdenite mineralization. This zone represents a deeper cupola environment. Veining in the Paramount zone exhibits a spatial preference with granodiorite and is commonly associated with quartz flooding. Sulphide mineralized stockworks are rare.

    The Paramount zone was previously defined with dimensions of 700 [long] x 200 [wide] x 500 m depth..." [700m x 200m x 500m = 70,000,000 cubic metres ~ @2.690 Tonnes/m3 => ~ 188.3M Tonnes]

    Today's NR states:

    "The assay results received from the 2011 drilling program have extended in three directions the limits of the mineralization in the Paramount zone. In addition, assay results for five additional drill holes completed in the Paramount zone are yet to be received.

    a) DDH CF415-2011 has extended the mineralization in the Paramount zone an additional 250m to the north; the mineralized zone remains open to the north;

    b) DDH CF413-2011 and DDH CF408-2011 have extended the mineralization to the west an additional distance that ranges from 55m to 110 m. The western extent of the mineralization has been established;

    c) DDH CF410B-2011 has extended the mineralization in the Paramount zone approximately 140m to the east, the mineralized zone remains open to the east under Mount LaCasse; and

    d) the grade of the 2011 diamond drill results received to date from the Paramount zone is 0.34% copper, 0.22 g/t gold, 0.034% molybdenum and 1.99 g/t silver which exceeds the average grade of the metals as set out in the current indicated mineral resource estimate (0.27% copper, 0.18g/t gold and 0.017% molybdenum) completed by AMEC Americas Limited."

    --------------

    So... our Paramount is now 700M long PLUS 250m, 200m wide PLUS 75m west, Plus 140m E (and still open to the east). Paramount is now 950m Long X 415m wide, and about 500m deep.

    950m long x 415m wide x 500m deep = 197,125,000 cubic metres ~ @2.690 Tonnes/m3 => ~ 530.27M Tonnes

    New Paramount / Old Paramount = (~ 530.27M Tonnes/ ~ 188.3M Tonnes)= 2.8x's. In other words... Paramount is indicated (very roughly) to be almost 3 times bigger than the July RE! And the grades are getting better.

    GLTA


    1. I smoothed it for 300Mt. But yes, you are correct. Factor in the grade 0.34 and wow. Give us 4 holes next year and it becomes reserves.

    2. It is nice to see you getting excited once again, chappy....

      I think when investors really digest what this means for their CUU holdings in the end game, they will quickly get over their initial disappointment today.

      I also had a chuckle when I read snake's posts here this morning attacking vette on missed deadlines......as if vette has any say on these matters, they were just his best guestimate based on him trying to connect the dots as we all do......oh did i say snake?? I meant to say Dr. Pepper from SH - welcome!! One and the same.....can somebody please write this guy a new script??

      foxy

    3. Chappy, did your calculations include this part?

      DDH CF415-2011: This hole was drilled to the west and undercut several shallow (100m deep) pre 2005 drill holes that intersected weak copper mineralization. The mineralization commenced at a core length of 13.0m and continues to the bottom of the hole at 626.0m. Chalcopyrite, bornite and molybdenite occur as disseminations and as fracture/veinlet filling in potassic, phyllic and biotite altered brecciated granodiorite and andesite. This hole has extended the mineralization an additional 284m along strike and 340m below the floor of the proposed open pit designed in 2008 to a vertical depth of 470m below surface.

      1. Riskkee.... Yes, I did include 'that part'. I used 500m average depth but it looks like it is 30 m less (470m) at DH 415. The depth will vary much more than 30 m along the Paramount zone - almost a km long now. The calc was a rough napkin excercise. We don't have enough info on the Paramount and the new drilling to get that specific.

        Working 470m back into my calculations to be more conservative along the entire length...

        So... our Paramount is now 700M long PLUS 250m, 200m wide PLUS 75m west, Plus 140m E (and still open to the east). Paramount is now 950m Long X 415m wide, and about 470m deep.

        950m long x 415m wide x 470m deep = 185,297,500 cubic metres (vrs 197,125,000 185 cubic metres from 500m depth) ~ @2.690 Tonnes/m3 => ~ 498.5M Tonnes ( vrs 530.27M Tonnes @ 500m depth)

        470m depth vrs 500m => 498.5M T/ 530.27M T => about 6% less with 30m depth taken out.

        1. Mr. Stewart, President of Copper Fox stated, "DDH CF415 was drilled at the north end of the proposed open pit for essentially condemnation purposes. The results for this hole are a significant development in understanding the potential and size of the Paramount zone. The thickness of the mineralization and assays from this hole demonstrate that mineralization could extend a considerable distance to the north past this hole location. Most importantly, the results of DDH CF415 and DDH CF413 have extended the mineralization a considerable distance beyond that outlined in the current resource estimate which is being used to design the proposed open pit mine plan contemplated in the feasibility study. The Company has commissioned Tetra Tech WEI Inc. (formerly Wardrop) to prepare an updated resource estimate incorporating the significant new data provided by the results of the 2011 drilling campaign which extended the zones of mineralization and reported higher average grades than those currently reported for the Paramount Zone."

          The assay results received from the 2011 drilling program have extended in three directions the limits of the mineralization in the Paramount zone. In addition, assay results for five additional drill holes completed in the Paramount zone are yet to be received.

          The remaining five drill holes for the Paramount zone are DDH 416 - 417 - 418B - 420 - 425

          1. Mr. Stewart, President of Copper Fox stated, "DDH CF415 was drilled at the north end of the proposed open pit for essentially condemnation purposes. The results for this hole are a significant development in understanding the potential and size of the Paramount zone. The thickness of the mineralization and assays from this hole demonstrate that mineralization could extend a considerable distance to the north past this hole location.

            Yes Riskee it's all about the North....No wonder they bought the extra land

            http://www.copperfoxmetals.com/s/Image.asp?i=maps/new-mineral-claims-acquisition.gif&id=485605

            http://www.copperfoxmetals.com/s/Image.asp?i=maps/North-Schaft-project-map.jpg&id=448864

            1 Giant system.

            The remaining five drill holes for the Paramount zone are 416 - 417 - 418B - 420 - 425

            Yep 5 holes and they can start the new Resource Estimae, that shouldn't take long since the block model is already complete. Almost plug and play.

            The Feasibility will come before but the new RE will come shortky after, while the 120 days are passing by 1 by 1......

          2. Now 71 million

            Copper Fox holds title and a 100% working interest in a contiguous 21,024.96 hectare (51,954 acre) property which includes the Schaft Creek deposit subject to a 3.5% Net Profits Interest held by Royal Gold, Inc., a 30% carried interest held by Liard and an earn back option held by Teck Resources Limited ("Teck"). Copper Fox is currently earning a 78% interest in Liard from Teck. Teck's earn back option to acquire 20%, 40% or 75% of the Copper Fox interest in the Schaft Creek project is triggered upon completion of a positive feasibility study. Should Teck elect to exercise its option for 75% they are required to fund subsequent property expenditures up to a total of 400% of those incurred by Copper Fox ($70.8 million as of October 31, 2011) and arrange for project financing, including the Copper Fox portion. For full details of the option please refer to the Company's website www.copperfoxmetals.com.


  2. It seems to me that this is excellent news today -really a delay only means more money. Every time we turn around we get drills with more minerals - keep drilling -keep adding.

    The SP is dissappointing, but if you dont sell you dont lose. Soon it will catch up to real value.

    The shorts seem to be dissappearing as well.

    1. If they decided to redo the BFS are we not looking at another 6-9 months from now for this to happen?

      If they did the RE before teh Feasibility, yes it woulkd take 6 months.

      But that's not the case, nice try.

      The Feasibility will be out end Jan-Feb.

      Teck back in will be advised at any time after the Feasibility

      The Updated resource process will start once the 5 remaining Paramout assays come in.

      We are looking at a Triple whammy from here to May. + the Buyout !

  3. Not owned by TECK, they aquired Wardrop a couple of years ago. Trade on the Nasdaq

    Tetra Tech, Inc. was founded in 1966 to provide engineering services related to waterways, harbors and coastal areas. Over the past 40 years, the Company has substantially increased the size and scope of its business and expanded its service offerings through a series of strategic acquisitions and internal growth.


    Tetra Tech now provides environmental services, water/wastewater management, infrastructure services, security design, and outsourced technical services.


    From the beginning, Tetra Tech has attracted the best and brightest minds in science and engineering, and has always focused on bringing innovative solutions to our clients’ most complex needs.


    Today, Tetra Tech has approximately 13,000 employees located in more than 330 offices worldwide.


    Tetra Tech is based in Pasadena, California.