Skip to content
Sign in

Post

Copper Fox Metals Inc.

You’re reading Prospekt’s reply in this thread.Jump to it

Prez3.4 rating from 209 members16.2K ptsRate

Assays

Per Nov 15th NR, holes 416, 417, 418, 419, 421, 422, 423, 424 have all been completed minimum 2.5 months ago.....

2011CF416
6361436
379885
1341
331.3
47
-60°
Geotechnical/Exploration
2011CF417
6361273
379775
1198
700.0
65
-70°
Geotechnical/Exploration
2011CF418
6360510
379705
963
69.2
270
-60°
Delineation Drilling/Geotechnical
2011CF418B
6360513
379703
963
693.1
270
-60°
Delineation Drilling/Geotechnical
2011CF419
6359456
380302
1037
398.7
205
-64°
Delineation Drilling/Geotechnical
2011CF420
6360350
379949
1025
in progress
270
-55°
Delineation Drilling/Geotechnical
2011CF421
6358853
380066
966
327.0
90
-60°
Geotechnical/Exploration
2011CF422
6362562
377977
863
318.0
90
-50°
Geotechnical/Exploration
2011CF423
6359498
379185
874
253.3
272
-55°
Delineation Drilling/Geotechnical
2011CF424
6359383
379169
881
154.2
270
-55°
Delineation Drilling/Geotechnical
2011CF425
6360258
379760
943
in progress
260
-60°
Delineation Drilling/Geotechnical

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. If the holes were drilled for geotechnical reasons would they report all findings or just something unexpected and interesting?

    1. Remember this document from early December...http://sedar.com/CheckCode.do;jsessionid=0000cDt88q8LUACqe2JJ3SigZkP:-1

      It hinted that there was a dud drill or so... page 26 & 27

      The 2011 diamond drilling program concentrated primarily in the Paramount zone. Twenty two holes totalling 9,649.3 m were drilled and all but seven were in the Paramount zone. A list to the 2011 drill holes completed and the purpose of each hole is set out in the table below [table not copied see NR*]. Three holes drilled into the Paramount zone failed to reach their target depths due to challenging ground conditions and had to be abandoned and re-started in the same location. [I think we know about these 410A...]

      One hole was drilled beyond the south end of the deposit but failed to provide adequate geological support to explain the target chargeability anomaly. One hole was drilled to the west of the Liard deposit to test a previouslyreported mineralized interval and a coincident chargeability anomaly identified by the Titan-24 survey completed in2011. One hole was drilled approximately 1.5 kms north of the Paramount zone.

      The analytical results for drill holes CF407-2011 to CF412B-2011 have been reported. Analytical results for the balance of the holes completed at Schaft Creek in 2011 will be reported on receipt thereof.

      *DH NR: http://www.copperfoxmetals.com/s/NewsReleases.asp?ReportID=490697&_Type=News-Releases&_Title=Drilling-Intersects-0.91-Copper-Equivalent-over-387M-at-Schaft-Creek

      1. So it is possible that we won't get results for all of the holes? The delay could be that we haven't received results for holes that go beyond geotechnical drilling.

        It's interesting from your quote, Chappy, that he says "One hole was drilled beyond the south end of the deposit but failed to provide adequate geological support to explain the target chargeability anomaly." That would seem to belie the 1:1 results to Titan results.

        I'm just so focused on the Feasibility being released and hoping that Europe doesn't do something more dreadful to spoil our joy.

        Here's my favourite European quote of the day: "Luxembourg Prime Minister Jean-Claude Juncker, Europe’s longest-serving leader and the head of the panel of euro finance ministers, summed up two years of crisis-fighting: “If I wasn’t optimistic you could have reported about my suicide months ago.”--Bloomberg BusinessWeek