Skip to content
Sign in

Post

Copper Fox Metals Inc.

You’re reading firestarter’s reply in this thread.Jump to it

Prez3.3 rating from 97 members6.3K ptsRate

Both Sides of the Picture

This board is an excellent resource for learning more about the positives of Copper Fox. It is a great place to discuss why Copper Fox is unique and how upcoming catalysts will further prove that. However, I think this board has become too one sided and I wanted to share some negatives as well. I know I'm putting a target on my head, but I think it is helpful to discuss both sides of the story. I'm not here to start any fights, I'm just looking to create some intelligent discussion. The positives are discussed quite often, so I will briefly summarize them first.

POSITIVES

1. We have a huge world class resource - 1 billion tonnes of mineralized rock is a rare find these days

2. We have excellent economics due to favorable starter pits and an ideal workspace layout

3. We can produce a clean, high quality concentrate

4. We can produce four different metals, allowing us to be hedged against metal price fluctuations

5. We have no major environmental concerns - low PAG rock and not near fish bearing streams

6. We have a solid management team

7. We have an excellent partner (Teck)

8. We have full confidence from insiders

9. Our upgraded Resource Estimate will show a huge jump in resources

Negatives

1. Hole 419 was not a new find. The drill hole location map makes it appear that we found mineralization well south of the resource block model. The map is misleading because the block model is shown for an elevation of 600m, well below the surface. Our actual resource block model goes almost all the way to 6359000 near the surface. The location of Hole 419 was already contained in our Resource Estimate (but likely at lower grades).

2. There seems to be poor information flow to us regarding delays. I understand there will be delays when working on something as large as this Feasibility. That is acceptable. But why wait so long to tell us? We found out Dec 14 that the feasibility would be delayed. At that point, there was only 1 working week left in the year. Did they not know sooner about the delay? Other companies are able to predict feasibility dates months in advance.

3. Our drill results are painfully slow. There are likely valid explanations for this. However, I'm concerned that Copper Fox is either selecting poor contractors for this job or they have weak control over the contractors.

4. Our budgeting abilities seem to be weak. Why so many financings? Why did we not just plan a large financing last spring and get it over with all at once?

5. This is not "cheap". This is a $525M dollar company with a likely 25% stake in a mine years away from construction. There are very few other companies in that situation with a market cap as high as us. So why am I here? Because I expect Copper Fox to be a very expensive buyout.

6. Our 2011 drilling program was not very aggressive. Instead of reading about all the potential, I would prefer if we proved it. Look at Lumina Copper. They are a company smaller than us and they pulled off a 99,500m drilling program in 2011. Ours was 10,000m. If we have a drill program this year, I hope to see it start with a bang.

7. Our Resource Estimate last year was very disappointing. The share price suffered because of it. It was not the shorts, or the frisbee shares, or the big banks. It was our own bad news that caused the drop. It's not the job of a resource estimate to remove rock that is uneconomical. That is the job of PFS/BFS. Our resource should not have gone down.

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. First, I would like to commend you for initiating this discussion.

    Based on some of the nonsense that we have seen here recently, it takes grit to even consider suggesting in writing that anything could possibly not be perfect at Copper Fox

    That is not healthy, and this has developed into an excelent exchange of views

    That being said, Id like to take a crack at this assertion of yours:

    "This is a $525M dollar company with a likely 25% stake in a mine years away from construction."

    The contradictions to this are built in.

    If we have a 25% stake, that means that Teck has exercised, and by contract, they must build out the mine in under 3 years. Not sure what you meant by "years away", but if they opt to let the 25% stake stand, ie not buy us out, the construction will have start immediately.

    1. "This is a $525M dollar company with a likely 25% stake in a mine years away from construction." The contradictions to this are built in.

      Good point..since when do we have a 25% stake lol...

      ''Copper Fox's main asset is 100% working interest of Schaft Creek, one of the largest undeveloped copper-molybdenum-gold-silver porphyry deposits in Canada located in northwest British Columbia. ''

      We took care of that in 2010 !

      http://www.copperfoxmetals.com/s/NewsReleases.asp?ReportID=383330&_Type=News-Releases&_Title=Copper-Fox-Acquires-100-Interest-in-Schaft-Creek-Project

      February 02, 2010
      Copper Fox Acquires 100% Interest in Schaft Creek Project

      1. "This is a $525M dollar company with a likely 25% stake in a mine years away from construction." The contradictions to this are built in.

        Good point..since when do we have a 25% stake lol...

        ''Copper Fox's main asset is 100% working interest of Schaft Creek, one of the largest undeveloped copper-molybdenum-gold-silver porphyry deposits in Canada located in northwest British Columbia. ''

        We took care of that in 2010 !

        Okay yes this is true.....we own 100% of Schaft Creek. For now.

        I honestly cant see Teck passing this up. 75% for about $260M? Thats a hell of a deal. Its like you giving your friend a buck and he gives you back 5....I think its pretty safe to value ourselves around this 25% mark, even better if Teck backs in for less or not at all. I just cant see Teck not taking 75% at a ridiculously low price. Based on the NPV of $2.7B we get $675M for each 25% interest. Based on this number ($2.7B), Teck essentialy buys $2.025B for the price of $260M. Ergo theyre making about 8 times their money just signing on the dotted line.

        If I was a Teck shareholder and they passed this up Id crucify them. Im sure Don Lindsay is savvy enough to see this bargain basement price.

        Rogue,

        1. Okay yes this is true.....we own 100% of Schaft Creek. For now.I honestly cant see Teck passing this up. 75% for about $260M? Thats a hell of a deal.

          Good, so now that we got that cleared up. Let's give ourselves some SP credit for:

          * The actual Teck back in news and the exposure it will bring

          * The 4x expenditures (yes 75% of that goes to Teck, but I'll remind you all that each $ Teck is forced to spend to earn in, unlocks more value, therfore continuessly bringing the value of our 25% up.)

          * The Teck upfront financing

          * The extra land and potential we have shown (remember Andean 3.6 Billion deal...all based on potential)

          * The Liard shares we own

          * The NSR we would own

          * The value of the fulluy financed 25% over 100 years if we decided to keep it.

          * The control we have over the contract and decisions as operator until Teck earns at least 40%. CUU could sell this agreement to a Teck competitor...I don't think that's something Teck would be happy with....

          Once feasibility hits the table..we are 100% in control...not 25%.

          1. Okay yes this is true.....we own 100% of Schaft Creek. For now.I honestly cant see Teck passing this up. 75% for about $260M? Thats a hell of a deal.

            Good, so now that we got that cleared up. Let's give ourselves some SP credit for:

            Working Interest:

            It is defined as an interest in a mineral property that entitles the owner of that interest to all of share of the mineral production from the property, usually subject to a royalty. A working interest permits the owner to explore, develop, and operate the property. The working-interest owner bears the costs of exploration, development, and operation of the property and, in return, is entitled to a share of the mineral production from the property or to a share of the proceeds there from. It may be assigned to another party in whole or in part, or it may be divided into other special property interests.

            Working Interest and ownership are two completely different things.

            Teck has first right of refusal here, they elect what to buy regardless of what we have to say, or can do about it.....and I suspect they will take 75% of our working interest for the bargain price of $260ish million dollars. We can not stop the the back in if they choose to to take the 75%, and it will leave us with 25%. Unless Teck chooses to back in for less, or even better not at all, as far as I am concerned we can split $260ish million dollars up as dividend and wait for the buyout.

            Teck also will not pay a full premium on anything that has not been proven, it doesnt work like that. Would you pay for a car that may or may not have an engine? Our drill intercepts are excellent and my gut reaction is that we have increased our tonnes significantly and will probably also succeed in bringing up our grade....but again...until we have a resource estimate ensconcing all our minerals increasing our M+I categories, we will only recieve full price for the proven reserves.

            What did we pay for our extra properties? Until we have drills in them proving up mineralized intercepts and possibly an RE, they might be worth a premium, but it could more likely than not be measured in the millions. NSR, Liard shares....all will add to the buyout but the most valuable part of our company, the 75% stake in Schaft Creek, is gone.

            I am sorry, but please remember too that Teck farmed this property out to us, and have been working hand in hand with our management as well. Ernesto has the ability to wheel and deal with Teck, but at the same time I dont believe CUU has the power to push Teck around. We can haggle over a price at the table for sure, but theres also a painfully little talked about scenario as well.

            What if Teck backs in for 75% and then elects to shelve this project for a couple years? What happens with our share price then? Its not impossible another producer would still pay for our chunk of this property and be glad they have a 25% interest when it goes into production, but they might also turn their attention elsewhere looking for acquisitions that can be in production by 2017.

            If Teck shelves this project and no one decided they want our chunk......well....Im afraid to say we're going to be waiting a long time, and we'll probably see the share price plummet as everyones selling off trying to get their money out at a profit, and Big E might suddenly think that $2.50 a share is looking a lot better than having his money tied up for what could be years. This is the one plausible scenario I can think of that could affect CUU, short of the government nationalizing our resource etc. but those scenarios are too far out of left field to even be considered.

            Do I think CUU is a hell of a property? Yes

            Do I think CUU is a hell of a story? Yes

            Do I think we're going to be rewarded for our patience? Yes

            Do I think CUU can tell Teck whats up? No

            Not trying to be negative about things fellas, but we are not a flawless, infalliable company. CUU has massive dilution as well, and dont forget that Schaft Creek also lies on the Tahltan Nations lands. This could cause massive governmental problems for us if they suddenly had a problem with our operation. CUU also does have some weak points. There is no such thing as a perfect, risk free stock.

            Im still well over 99% in my thinking that we're going to get a very decent buyout price, but Im not 100%. I always entertain plausible scenarios, and I never let my guard down against risk, indeed I actively search for it so I know what my exposure truly is. CUU doesnt have much, but it still has some.

            Regardless of all that, this is one hell of a stock, just wish we did own 100% so we wouldnt have Teck able to scoop up huge chunks of this deposit for a dime on the dollar.

            Rogue,

            1. Replying to @RogueWolf

              I 100% agree with you Rogue, But I do think that if Teck does decide to say we`ll just keep our portion...... and the land that you bought, well you can just keep it.

              If Teck did say this, we COULD punk 1 drill sample in each one....( Im sure that Elmer knows where to place the holes in each parcel)

              Then ship the core samples off to a different company of Elmers choosing.

              Their are company`s right now that have drilled in the later half of 2011 and 2012 allready and got their results back. I think the constant delay`s weighing on us all.

              1. Replying to @Dogger 12

                Hmm....you just brought up another hidden gem my friend.

                I hadnt thought about this but I like it a lot. I dont think this a very plausible scenario but then again, it does still hold some plausibility. My figure for a ballpark CUU buyout was for everything, the whole company. We arent going to be able to sell off everything we own with a CUU label on it like its a franchise, Teck will take us out completely. Im virtually certain of it, however....if we did retain the proerties in some way or form;

                I wonder which company it would go to?

                It would have tax implications but its been done before. Candente/Cobriza anyone?

                BXX looking that much sweeter?

                Rogue,

            2. Replying to @RogueWolf

              What if Teck backs in for 75% and then elects to shelve this project for a couple years? What happens with our share price then? Its not impossible another producer would still pay for our chunk of this property and be glad they have a 25% interest when it goes into production, but they might also turn their attention elsewhere looking for acquisitions that can be in production by 2017

              If teck backs in for 75% as you say...they can't shelve the project, it must be in production under 4 years... I've asked about this and the answer I received was that Teck must start building the mine the day they back in in order to spend the expenditures in time to not lose their 75%.

              With The Feasibility out this month, Schaft Creek will be a producing mine by 2016...(even better for your producers looking for 2017 lol) Unless Teck takes us out. Then they can take all the time they want.

              And if you doubt this 4 year clause call management, many here already have received confirmation.

              1. Replying to @cuuvette350

                Yes Vette you are correct about that 4 year thing. I had asked this same question. When we were picking it apart, Mike told me that they had to be in PRODUCTION in 4 years....give or take.

                I had asked him....hmmm, what do you mean give or take....He told me, due to weather conditions etc..we can extend that time frame. I had asked him how far would that time line be extended? He had told me that they would review that time needed to finish and take it from their.

                Bottom line I had asked him, so If CUU felt that Teck was just buying time and doing any funny business,,,,,,,Mike said then the time line would end.

                1. Replying to @Dogger 12

                  See but 4 years into production, and a buyout are two different things as well.....

                  Im not holding this stock waiting for it to go into production, like everyone here Im waiting for a buyout. Getting into production is Tecks problem and I fail to see how the 4 years to production affects any factor of a buyout. Once we've been paid for our shares....to be blunt; who cares about production.

                  If Teck backs in for 75% and no other producer is looking to acquire us....I bet Ernesto would look at taking less money for us. Ernesto didnt buy CUU to have a chunk of a producing mine, he bought it for a buyout.

                  The same reason I think he might also insist on ensuring the RE contains all the new drill holes and the whole resource. He wants to see money, not ownership in a business.

                  I do believe in this stock, and I do believe its the safest junior Ive ever seen, but NO ONE has a crystal ball either.

                  Rogue,

                  1. Replying to @RogueWolf

                    See but 4 years into production, and a buyout are two different things as well.....Im not holding this stock waiting for it to go into production, like everyone here Im waiting for a buyout. to be blunt; who cares about production.

                    Who cares about the production of Schaft Creek ?? LOL

                    Maybe you don't , but I'm sure the Koreans, Indians, Chinese do. (you know...all the interested forces that have been calling Elmer)

                    They are all waiting to see what Teck will take and then will act. 1st come 1st and they won't wait for each other. (competition to grab it first)

                    * Huge mine life and resource

                    * Canada

                    * Fully financed by Teck

                    Oh and like I said earlier the agreement CUU has control over can be sold to these guys...

                    (The control we have over the contract and decisions as operator until Teck earns at least 40%. CUU could sell this agreement to a Teck competitor...I don't think that's something Teck would be happy with....)

                    1. Replying to @cuuvette350

                      (The control we have over the contract and decisions as operator until Teck earns at least 40%. CUU could sell this agreement to a Teck competitor...I don't think that's something Teck would be happy with....)

                      I don't think this is entirely accurate. I think if they declare their intention to earn-back 75% then they have to spend 4X earnings before they earn the 75% and only then do they enter a JV. At that point they have to maintain at least a 40% ownership in order to be in control. Up until the point that they earn-back their chosen amount, the terms of the contract reverse from what they are currently and Teck reports to CUU in the same way that CUU currently reports to Teck. So Teck would have to get CUU to sign off on their selection of contractor, etc.

                      1. Replying to @Prospekt

                        You are correct Prospekt.....when the BFS is delivered Teck tells us what they want, they have first right of refusal and us proving this property up for them was their game plan since 2002. If they dont want us.....well....I think we'll all be having a drink and kind of start struck by the ramifications.

                        Rogue,

                            1. Replying to @RogueWolf

                              "Thats the only image Ive ever had since I joined Agoracom and Stockhouse."

                              Yup that is correct and here is RogueWolf's first post on SH from 3/24/2011 that proves it:

                              "Just wanted to say,

                              Vette is bang on with his predictions here......the mineralization in Schaft creek deposit is immense.....even the outlying areas around the deposit are likely to be economically viable for production.

                              If nothing else theres now less for Teck to buy, and we aquire more resources that are purely for CUU stockholders. Look at this however you want but I think its more than worth the delay in the RE. Also who wants to have RE that lacks silver? Overall theres more than a billion dollars of silver in the ground there and with our new 30% stake thats 300 million CUU shareholders would be exempted from.

                              As for another Schaft Creek.....well one is enough.....Id take another half of one on top and consider myself lucky.....however again Vette is right about the hydrothermal alteration beneath Mount Lacasse......personally I think we might see this deposit double and then we can laugh all the way to the bank.

                              Id take a 10-12$ per share buyout from Teck. Great job to the management team on this one, youve significantly increased our value, Im more than willing to wait a little longer for a better return.

                              Regards,"

                    2. Replying to @cuuvette350

                      Great discussion guys, I really am having a good time with this,

                      My point Vette....is that I see no reason Teck will not take 75%, they're a multi-billion dollar company many times over, for them to earn back the 75% is chump change.

                      This is just how I see it, I wont lie and I call a spade a spade.

                      That being said yes we have control over the contract and decisions as operator, but if Teck acquires 75%....we've lost that. Tecks not stupid man, this contract was designed for them to get in cheap....what company would farm out working interest to another company that could leave that company potentially in control?

                      The Koreans, the Chinese, Freeport, BHP......if Teck buys 75% of us for the bargain basement price their getting, then yes this could pose interesting for us in the form of a bidding war.....however Teck can buy this whole deposit for probably 30% of its value.....Im certain they're going to take us out in our entirety. The competing entities will cause Teck to offer a premium, and indeed I do believe Schaft creek will sell for a HELL of a premium, but these companies have worked very hand in hand for a long time now, I bet even Ernesto knows he's going to sell it to Teck.

                      My point is we can go over the contract ad nauseum, the simple reality lies in the fact that Teck can earn 75% of the value of this project for a fraction of its true value. I just dont see production as a factor in my investment decision, I bought and held for a buyout, not for ownership in a producing company.

                      Rogue,

                      1. Replying to @RogueWolf

                        That being said yes we have control over the contract and decisions as operator, but if Teck acquires 75%....we've lost that.

                        I also think they will back in 75%. But once they elect to back in they must then earn it, just as we have earmed 100% of Schaft Creek.

                        Unitil they earn it, even if they elected to back in, they don't have control and we haven't lost anything. CUU has already stated their intentions...they want to sell.

                        http://www.bus-ex.com/article/copper-fox-metals

                        Stewart should know. He’s been in the mining business for 30 years, holding the position of QP (qualified person) and in this time has helped bring on stream five different gold mining operations. “Even assuming that we could raise that much money alone,” he says, “it would leave the company highly exposed in the event of a market downturn. I already have the board’s agreement that selling our interests is the best course of action.”

                        ''In the meantime, Copper Fox is preparing the necessary licenses and permits for whoever it may be who takes the ball and runs. But whatever the future brings, the geologist in Stewart is sure that Schaft Creek will have a long and productive future.''

                        The copper supply is going down...the sovereign funds, the Koreans, the Indians , the Chinese..are all looking at 10-15 years down the road. Schaft Creek is a Canadian gem a porphry District, no envrionmental problems, huge mine life, very profitable etc..

                        They will all fight for it. They will gladly secure that 25% if Teck does not.

              2. Replying to @cuuvette350

                Getting into production is Tecks problem and I fail to see how the 4 years to production affects any factor of a buyout. Once we've been paid for our shares....to be blunt; who cares about production.

                Apparently you care about production:

                What if Teck backs in for 75% and then elects to shelve this project for a couple years? What happens with our share price then?


            3. Replying to @RogueWolf

              Make up your mind Rogue...first you come out and say that a producer would be looking for something in poroduction

              ''What if Teck backs in for 75% and then elects to shelve this project for a couple years? What happens with our share price then? Its not impossible another producer would still pay for our chunk of this property and be glad they have a 25% interest when it goes into production, but they might also turn their attention elsewhere looking for acquisitions that can be in production by 2017.''

              And when I destroy your argument with the 4 year clause you say who cares about production???

              '' to be blunt; who cares about production.''

              You're starting to sound desperate....

            4. Replying to @RogueWolf

              Teck has first right of refusal here, they elect what to buy regardless of what we have to say, or can do about it.....and I suspect they will take 75% of our working interest for the bargain price of $260ish million dollars. We can not stop the the back in if they choose to to take the 75%, and it will leave us with 25%. Unless Teck chooses to back in for less, or even better not at all, as far as I am concerned we can split $260ish million dollars up as dividend and wait for the buyout.

              Spin the number 6 around from $260ish million, and you get $290ish million

              Copper Fox holds title and a 100% working interest in a contiguous 21,024.96 hectare (51,954 acre) property which includes the Schaft Creek deposit subject to a 3.5% Net Profits Interest held by Royal Gold, Inc., a 30% Net Proceeds Interest held by Liard Copper and an earn back option held by Teck Resources Limited ("Teck"). Copper Fox is currently earning a 78% interest in Liard from Teck. Teck's earn back option to acquire 20%, 40% or 75% of the Copper Fox interest in the Schaft Creek project is triggered upon completion of a positive feasibility study. Should Teck elect to exercise its option for 75% they are required to fund subsequent property expenditures up to a total of 400% of those incurred by Copper Fox ($72.9 million as of November 30, 2011) and arrange for project financing, including the Copper Fox portion. For full details of the option please refer to the Company's website www.copperfoxmetals.com.

            5. Replying to @RogueWolf

              "Teck also will not pay a full premium on anything that has not been proven, it doesnt work like that. "

              I don't buy that. If TECK sees CUU as a startegic asset for the long term they may very well follow the Goldcorp's example (Andean Resources buyout) and buyout CUU for full premuium to ensure they have the resource in the pipeline. Lets not forget, Shaft Creek will eventually be a low-cost production mine with the NTL in place. All the current work that has been done on Shaft Creek suggests, at least to me, that there is a very high probability for significant coninue expansion of the resources (copper, gold, silver, moly) - they are talking about a district - right? Based on the Titan etc (OK I get lost in these tech stuff) it seems to me that there is strong potential for exapnding the existing estimates and more to the point, the potential for discovery of new zones; or am I off the rocker here?

              What I am trying to suggests is that a major will pay for a future potential if there is strong case for it. Andean Resources proved that a major will buy potential. Why would Goldcorp have payed $3.6 billion for 2.1 million oz of gold and some $20 million oz of silver IF there was no further potential for expansion?

              "Not trying to be negative about things fellas, but we are not a flawless, infalliable company."

              Does anyone on this BB thinks otherwise? So what's your point?

              "CUU has massive dilution as well, and dont forget that Schaft Creek also lies on the Tahltan Nations lands".

              With such a huge insider control the dillution seems a moot point, at least to me. Ah, now we hear about the FNs. CUU has one of the best FN programs of any junior mining company in BC. However, this is a non issue since CUU will not be the miner.


              1. Replying to @orcinus

                "CUU has massive dilution as well, and dont forget that Schaft Creek also lies on the Tahltan Nations lands".

                Insiders own 64% and the number os shares are deluted in the massive value.

                As for the Tahltan...

                http://www.copperfoxmetals.com/s/SchaftCreek.asp?ReportID=209028

                Tahltan Nation community relations engagement and consultation

                Copper Fox is working with the Tahltan Central Council and the Tahltan people to ensure, honest and transparent communication. Over the past three years, Copper Fox has met with the Tahltan Central Council and conducted several community meetings to discuss the progress on the project and receive feedback from the political leadership and Tahltan community members.

                Copper Fox has entered into several agreements with the Tahltan Central Council and the Tahltan Nation Development Corporation including:

                1. A memorandum of Understanding with the Tahltan Nation Development Corporation

                  Copper Fox has signed Memorandum of Understanding with the Tahltan Nation Development Corporation which defines the scope of work, program commitments, cooperation, and communication that Copper Fox will follow at Schaft Creek and recognizes TNDC will be a "preferred contractor". This agreement includes commitments regarding contracting and sub contracting opportunities for Tahltan businesses and employment and training opportunities for all members of the Tahltan Nation. The Tahltan Nation Development Corporation (TNDC) is the economic arm of the Tahltan Nation and generates wealth, economic, employment and training opportunities for all members of the Tahltan Nation
                2. Communication Agreement with the Tahltan Central Council

                  Copper Fox has signed a Communications Agreement with the Tahltan Central Council (TCC) with the objective of ensure strong communications between the company and TCC. The agreement outlines financial support the company will provide to the TCC to ensure adequate financial resources are available for funding communications between the TCC and the company.
                3. Heritage Agreement (formerly known as the Traditional Knowledge Agreement)

                  Copper Fox has signed a Heritage Agreement with the Tahltan Central Council (TCC) with the objective of confirming how traditional knowledge will be collected and protected, as well as how the process will be funded. Copper Fox will fund any collection of traditional knowledge and be responsible for ensuring it keeps confidential such information. In addition, the information is always owned by the Tahltan Nation and all information is to be returned to the Nation following the environmental assessment.
                4. Tahltan Heritage Resources Environmental Assessment Team (THREAT) funding Agreement

                  Copper Fox has signed a THREAT Agreement with the TCC. This agreement outlines how Copper Fox and THREAT will work through the environmental assessment process. In addition, the agreement also outlines how work will be funded. Copper Fox and the THREAT team have met several times during this pre-applications phase. There are two purposes of the meetings. The first is for Copper Fox and their consultants to provide project updates, engineering and technical reports and assessments of different project design components to THREAT. The second, is for THREAT to provide the company with provide feedback and ensure Tahltan views are incorporated early on into the project.

                Other community relations activities include sponsorship of an annual $15,000 Scholarship

                Copper Fox Metals and the Tahltan Central Council, on behalf of the Tahltan Nation including the Tahltan Band and the Iskut First Nation are offering a merit-based scholarship to a Tahltan First Nation student planning to attend the University of Alberta to study in one of following programs: Education, Nursing, Medicine, Physiotherapy, Nutrition, Law, Engineering, Geology, Agriculture, Social Work or Native Studies.

                The Copper Fox Scholarship is a new undergraduate program for students attending the University of Alberta. The scholarship will be provided over five years max ($15,000 per year). The Copper Fox Scholarship covers tuition, regular student fees and books for students studying at the University of Alberta for up to five years. Continued support under this program depends upon maintenance of satisfactory academic standing and enrollment in a full time program that will lead to an undergraduate degree.

                Copper Fox Metals is the sole contributor to the fund. Award winners are selected on the basis of academic performance, career goals, brief biography, role model qualities, and volunteer and leadership contributions to their community. Academic performance, residency and career interest are considered in the selection process. Applicants who wish to pursue a career in the mining industry and traditional studies are favoured.

            6. Replying to @RogueWolf

              Teck also will not pay a full premium on anything that has not been proven, it doesnt work like that. Would you pay for a car that may or may not have an engine? Our drill intercepts are excellent and my gut reaction is that we have increased our tonnes significantly and will probably also succeed in bringing up our grade....but again...until we have a resource estimate ensconcing all our minerals increasing our M+I categories, we will only recieve full price for the proven reserves

              I would beg to differ with your assessment. As was mentioned here many major companies like Goldcorp have paid substantial premiums in the past to acquire properties they felt would have substantial untested potential. I believe CUU is in this position. So far the drill holes are proving Elmer's geological interpretation of a massive resource. If Teck's expert geologists also feel the same they may advise management to go all out to acquire this property. True Teck is not going to pay full value for what is completely unknown ( as it would take decades to drill this out fully) but what if there are good indications ( from Titan, aerials, geophysics etc.) that another SC type deposit was there at higher grades? Would you completely dismiss another potential 100B in value? I don't think Teck would offer zilch for it if their geos felt the strong possibility that it is indeed there. It would be a calculated gamble on Tecks part but such is the nature of these kind of acquisitions. Teck and other Majors did not get to be where they are today by not taking some calculated risks. Eg Fording Coal was a huge risks many analysts thought would sink Teck but it has proven quite the opposite hasn't it?

              1. Replying to @cbew

                Another good discussion. Thanks for starting it Rogue.

                I think you and cbew may be on the same page here but perhaps semantics have got in the way. You say

                'Teck also will not pay a full premium on anything that has not been proven..'

                cbew says'I would beg to differ with your assessment.' but then says

                'As was mentioned here many major companies like Goldcorp have paid substantial premiums'

                There is a difference between full and substantial and I think cbew even acknowledges that

                ' True Teck is not going to pay full value for what is completely unknown ( as it would take decades to drill this out fully) but what if there are good indications ( from Titan, aerials, geophysics etc.) that another SC type deposit was there at higher grades?

                So good points from both, I think.

                On the production points, Rogue, I think you have to take future production costs and timelines into consideration as these have a bearing on current buyout costs. Teck has to consider the cost of organising finance for production while Copper Fox looks on counting the profits. So this is a factor in deciding to buyout CUU from the start. This gets rid of the timelines and reduces overall costs.

                GLTA bbay

                1. Replying to @bbay

                  "Teck also will not pay a full premium on anything that has not been proven, it doesnt work like that. ''

                  Oh Really ?

                  Goldcorp trumps Eldorado's bid for Andean recources

                  Sept. 3 (Bloomberg) -- Goldcorp Inc., the second-biggest Canadian gold producer by market value, agreed to buy Andean Resources Ltd. for about C$3.6 billion ($3.4 billion) in cash and stock, trumping an all-share bid from Eldorado Gold Corp.

                  Cerro Negro has reported indicated resources of 2.54 million ounces of gold and 23.56 million ounces of silver, according to Goldcorp. This indicates Goldcorp is paying $1,339 an ounce for the asset, higher than the $1,250.95 price that gold closed at yesterday.

                  “Goldcorp is betting on the exploration potential of Cerro Negro,” said UBS AG analyst Jo Battershill. “I believe there are 10 million ounces there.”

                  “It goes to show that good deposits are hard to find and there’s a premium to be paid,” David Baker, managing partner at Sydney-based Baker Steel Capital Managers with $1.2 billion in funds, said by phone. “There’s more consolidation to come.”

                  1. Replying to @cuuvette350

                    Hi Vette

                    I don't think anyone is arguing that there will not be a premium. I think the size of the premium is what is being discussed. So more proving equals a bigger premium.

                    Good post on the First Nations, by the way

                    good luck

                    bbay

                  2. Replying to @cuuvette350

                    I had to add this:

                    Mr. Jeannes said Cerro Negro not only offers shallow depth, robust production at low cost and short construction time, but also the opportunity for significant continued growth through expansion of existing deposits and new, connected discoveries.
        2. Why would Teck pass up a 75% back in deal for 260M?

          There are several reasons as mentioned here on these boards previously. The number one reason I can see is that they will NOT be the operator until they earn the back in by spending the money and carrying CUU interests to production! Read that again if you don't understand. They do not get the full 75% until they spend the money! That means CUU will be calling the shots. CUU could sell their interest to another party that may not be to Teck's liking. They will also be obligated under a very short time frame to get it going asap ( under 4 years ).

          For these reasons and others, I and many others believe Teck will not elect to back in for the full 75%. IMHO, their best option is to completely buy us out at a premium above our minimum possible interests of 25% of the EV of the project. Someone here also mentioned that in talking with Micheal Smith that this scenario is what many of his finance people also think will happen. A complete buyout will give Teck breathing room to develope and explore this property even more to get a better plan for future developement. This also allows them time to shop around for the best partner to sell/JV this massive project with. And above all this will leave them with 100% control from day 1. My 2 cents.

          1. See it this way..

            TECK: 75% of the mine and 0% of the control

            CUU: 25% of the mine and 100% of the control

            And as Teck spends money to earn minimum 40% and thus control, each dollar they spend keeps bringing unlocks value and in effect the value of our 25% up. (Not in Tecks interest)

            They will just take us out.

          2. Great discussion here folks.

            I want to add a quick comment/question... The 75% earn-in scenario is good for teck until you look at how it needs to carry CUU's share to production and on an 'artificial' time line (4yrs). TCK could buy CUU outright - very plausible - and free itself from the entire agreement. But could TCK also re-negotiate the earn-in agreement to do away with this timeline and, say, replace it with a NSR to CUU or something?

            With our new understanding of the geology and the identification of new undrilled targets at shallow depths, it doesn't make sense to simply charge ahead with a mine plan on the Main Zone when the economic picture could be significantly improved with a better mining scenario. The entire 20 km length of Mt La Casse may need to be drilled to get a full picture of how to extract ore and waste rock efficiently and store tailings. We also have anomallies to the west near the Sept 2011 claims. That is me thinking like TCK with a 5 to 20 yr outlook.

            In short, better, shallower grades may be found that revolutionize current (actually 10+ yr old) thinking about how to mine this district. This line of strategy would require a single, strong owner with a long term strategic outlook.

            1. Replying to @chappy726

              But could TCK also re-negotiate the earn-in agreement to do away with this timeline and, say, replace it with a NSR to CUU or something?

              Question should, would CUU want to re-negotiate the earn back agreement. Based on the advantage they hav ehere I would think not. They would want to exlude land from the back in etc..

              Remember the top 10 questions from Web and the reply from management:

              8. Can the project be sold in zones?

              A.It could by mutual agreement but CUU does not want to tinker with the contract and sees no value in that. Given that, everyone has their price. We are content to plug along developing share holder value.

              1. Replying to @cuuvette350

                excellent discussion. For what it is worth, my thought on 2011 drilling program being only 10,000 m. We are working along side with Teck on the BFS and with Teck having to pay 4x expenditures they would not appreciate having to pay extra for indiscriminate drilling. We (and teck) know more or less what is needed for BFS so why waste time and money.
                1. Replying to @JohnnyAugust

                  I am no geologist, but one thing to remember when comparing our drilling record and reporting the results with other companies that seemed to have well outdrilled and outreported us is the geology of the deposit and the depth to which the drills were taken. And lets not forget the back in agreement with TECK, that in itself is a key driver the controls the direction of what CUU management does and does not do. The exit strategy is a buyout, always was and always will be, and no other junior (to be honest to consider CUU as a junior exploration comapny at this stage of the game seems a bit silly to me) to my knowledge is in the same boat as CUU.

            2. Replying to @chappy726

              Awesome Discussions going on This Is what it's all about.

              I agree with Chappy with lets say 5% drilled another 2-3 shaft creek potential, Tck will probably want more Info to decide the best possible starting pit or pits to maximize returns, also agree with vette the longer they hold out in purchasing cuu for the reason mentioned the more they will unlock greater value for us.

              This has been the best day for discussions in a long long time

              Brad

    2. Thanks, I've been very happy with the replies so far.

      My mistake, I meant to say "years away from production". Yes I am assuming Teck will back in for 75%. I am skeptical that Teck will be able to build this project in 3 years though. Most large projects in this area take 5 years of construction (2008 PFS = 5 years, KSM = 5 years, Galore Creek = 5 years). Assuming things go well for us, I could see us being 4 years away from construction at best (although I doubt we will still be around). This was the logic behind me saying "years away from production".

  2. 2. There seems to be poor information flow to us regarding delays. I understand there will be delays when working on something as large as this Feasibility. That is acceptable. But why wait so long to tell us? We found out Dec 14 that the feasibility would be delayed. At that point, there was only 1 working week left in the year. Did they not know sooner about the delay? Other companies are able to predict feasibility dates months in advance.

    3. Our drill results are painfully slow. There are likely valid explanations for this. However, I'm concerned that Copper Fox is either selecting poor contractors for this job or they have weak control over the contractors.

    4. Our budgeting abilities seem to be weak. Why so many financings? Why did we not just plan a large financing last spring and get it over with all at once?

    Elmer is constrained by the money people. He saved the co from bankruptcy yet they still drag their feet on spending money. This is not his fault.

    5. This is not "cheap". This is a $525M dollar company with a likely 25% stake in a mine years away from construction. There are very few other companies in that situation with a market cap as high as us. So why am I here? Because I expect Copper Fox to be a very expensive buyout.

    We have 25% of 130 billion dollars in the ground. We are cheap. We have a good IRR in the safest jurisdiction on the planet. That fetches a premium. Watch Harper in China for a clue.

    6. Our 2011 drilling program was not very aggressive. Instead of reading about all the potential, I would prefer if we proved it. Look at Lumina Copper. They are a company smaller than us and they pulled off a 99,500m drilling program in 2011. Ours was 10,000m. If we have a drill program this year, I hope to see it start with a bang.

    The drill program was constrained by the money men. "Spend only what you absolutely have to." and "If you increase resource over inferred you get more money" and "It will take too long to convert the potential into measured and this does not fit in our timeframe"

    7. Our Resource Estimate last year was very disappointing. The share price suffered because of it. It was not the shorts, or the frisbee shares, or the big banks. It was our own bad news that caused the drop. It's not the job of a resource estimate to remove rock that is uneconomical. That is the job of PFS/BFS. Our resource should not have gone down.

    We got improved economics. The pounds didn't vanish. How can this be bad?

    1. Excellent replies Webgogs. I've added a few more comments below:

      4. Elmer is constrained by the money people. He saved the co from bankruptcy yet they still drag their feet on spending money. This is not his fault.

      Okay that makes sense. However, I hope we don't see the trend of monthly financings continue. If we need $10M, I would like to see them try to raise it all at once.

      5. We have 25% of 130 billion dollars in the ground. We are cheap. We have a good IRR in the safest jurisdiction on the planet. That fetches a premium. Watch Harper in China for a clue.

      I should clarify. We are not cheap for a junior explorer. We are not cheap based on dollars in the ground. What makes us cheap is our excellent economics and potential.

      7. We got improved economics. The pounds didn't vanish. How can this be bad?

      Typically the Resource Estimate is not supposed to determine what is economical. That is left to the PFS/BFS. However, I think I found the answer on their website. One of their goals is to provide "a realistic resource estimate geared toward maximizing the economic return/benefits of the Schaft Creek deposit over the life of mine." I can live with a one time haircut to the Resource Estimate. However, I can't see any reason for them to further reduce our Resource Estimate. Drilling is supposed to increase the Resource Estimate, not decrease it.

      1. Just going to add a bit more input on some of these points.

        Okay that makes sense. However, I hope we don't see the trend of monthly financings continue. If we need $10M, I would like to see them try to raise it all at once

        The fact that the private placements have been pretty consistent tells me management knows endgame is at hand, and will only finance when they need more money for operations and day to day costs of business. Theres no sense diluting to the tune of $10M if they think theyll only need $2M until Teck acts. This is a safer strategy issuing multiple placements to keep dilution to a minimum. On the other hand if we see a large placement it might be an indicator that were going to see another delay in the BFS.

        5. We have 25% of 130 billion dollars in the ground. We are cheap. We have a good IRR in the safest jurisdiction on the planet. That fetches a premium. Watch Harper in China for a clue.

        In situ Value wont matter when it comes to the buyout, it will come down to the EV in the ground. We have 25% of this figure as Teck will not be paying full value for everything we have in the ground. They need to build a mine, pay costs and make a profit themselves. Our NPV was $2.7 billion last I checked and we would have 25% of that ($675M....not even $2/share). These new mineralized intercepts and soaring commodity prices are our best friend for seeing a high buyout. That being said value isnt always a dollar sign and I think we can get a premium for our shares. Ive said before and Ill say it again...there are not many deposits of this size in the world which can hit production about the same time as peak copper. That alone is going to be worth money to an acquiring company.

        I should clarify. We are not cheap for a junior explorer. We are not cheap based on dollars in the ground. What makes us cheap is our excellent economics and potential.

        No I cant recall last time I saw a junior hit a 1 billion dollar market cap ($2.70), we definately are not cheap.

        7. We got improved economics. The pounds didn't vanish. How can this be bad?

        Typically the Resource Estimate is not supposed to determine what is economical. That is left to the PFS/BFS. However, I think I found the answer on their website. One of their goals is to provide "a realistic resource estimate geared toward maximizing the economic return/benefits of the Schaft Creek deposit over the life of mine." I can live with a one time haircut to the Resource Estimate. However, I can't see any reason for them to further reduce our Resource Estimate. Drilling is supposed to increase the Resource Estimate, not decrease it.

        No whether we use a lower tonnage with a higher grade, or a higher tonnage with a lower grade....the rock is the rock is the rock. Ore wont just vanish because they play with numbers on paper. Its no secret the strategy of management is to sell Schaft Creek....all these numbers do is make it look a lot sweeter to an acquiring company by lowering their CapEx.

        Now this is a discussion,

        Rogue,

        1. Great discussion. I've got a couple more things to add about the private placements.

          The fact that the private placements have been pretty consistent tells me management knows endgame is at hand, and will only finance when they need more money for operations and day to day costs of business. Theres no sense diluting to the tune of $10M if they think theyll only need $2M until Teck acts. This is a safer strategy issuing multiple placements to keep dilution to a minimum. On the other hand if we see a large placement it might be an indicator that were going to see another delay in the BFS.

          Great points. At this point I agree that private placements are the way to go. However, in hindsight it would have been nice for them to have raised enough money for all of 2011 in one or two large offerings. Every time we announce a new private placement, there is a target on our heads until that private placement is closed. We come under attack because shorts and MM try to lower the PP price or have it cancelled entirely. Let's hope the end game is close enough that we don't see too many more PPs.

          1. Every time we announce a new private placement, there is a target on our heads until that private placement is closed. We come under attack because shorts and MM try to lower the PP price or have it cancelled entirely.

            Not always the case......

            January 18, 2012
            Copper Fox Announces a $2,200,000 Private Placement Unit Offering Insider Commits to 100% Participation

            The Offering will consist of 3,000,000 flow-through units at a price of $1.25

            03/01/2011 1.840 1.850 1.720 1.750 1,857,867 0.000 0.00%
            02/28/2011 1.750 1.850 1.700 1.750 4,479,902 0.050 2.94%
            02/25/2011 1.440 1.700 1.420 1.700 5,034,935 0.280 19.72%
            02/24/2011 1.410 1.450 1.370 1.420 1,812,613 -0.040 -2.74%
            02/23/2011 1.310 1.490 1.270 1.460 3,540,247 0.250 20.66%
            02/22/2011 1.340 1.360 1.200 1.210 1,891,379 -0.130 -9.70%
            02/18/2011 1.340 1.420 1.280 1.340 3,642,649 0.040 3.08%
            02/17/2011 1.050 1.320 1.040 1.300 4,235,942 0.260 25.00%
            02/16/2011 1.030 1.050 1.020 1.040 482,975 0.020 1.96%

            Then they closed it March 16th

            March 16, 2011
            Copper Fox Announces the Closing of a $3,750,000 Non Brokered Private Placement Flow-Through Offering

            03/24/2011 2.040 2.040 1.810 1.890 3,486,793 -0.150 -7.35%
            03/23/2011 1.950 2.060 1.920 2.040 1,652,091 0.130 6.81%
            03/22/2011 1.990 1.990 1.870 1.910 994,168 -0.070 -3.54%
            03/21/2011 1.900 2.000 1.890 1.980 1,870,206 0.150 8.20%
            03/18/2011 1.800 1.870 1.780 1.830 1,765,445 0.100 5.78%
            03/17/2011 1.620 1.830 1.550 1.730 1,691,252 0.260 17.69%
            03/16/2011 1.400 1.520 1.400 1.470 1,708,675 0.110 8.09%
          2. I dunno...

            If you know that you have access to all the funding you need, whenever you need it, without the usual costs of a PP, maybe it just makes sense to draw it down as you need it.

            1. Replying to @Metacomet

              "If you know that you have access to all the funding you need, whenever you need it, without the usual costs of a PP, maybe it just makes sense to draw it down as you need it."

              There are many advantages to using private placements with EE. We don't pay commission to anyone, we get the funds right away, and we take only what we need.

              However, there are also advantages to public offerings. Take a look at what the Feb 17 offering last year did for our share price. Up 25% in one day. Strong demand in a public offering can result in it being priced above market price. It also allows people to purchase a large stake without moving the share price. It also can result in analyst following.

              That being said, management knows a lot more than I do about financing and I'm confident that they are choosing what is best for the company.

              1. Replying to @RabidTiger

                "However, there are also advantages to public offerings. Take a look at what the Feb 17 offering last year did for our share price. Up 25% in one day. "

                However, here you are making an assumption that CUU management would care about the daily, or weekly, or even monthly, fluctuations in SP. From my personal interaction with CUU management I am very confident that they have their eyes set on the BIG prize, and are not really concerned that much what Mr. Market does or thinks. IF CUU management were really interested in prepping up the SP and managing the process to the buyout with the psychological well being of the retail investor at heart, we would see a very different PR to what we now have. My interpretation of the current (and past) PR efforts is that they see the light at the end of the tunnel, and that to worry about the SP and retail investor expectations would just be a distraction. I think they have the big prize firmly in their cross hairs.

                1. Replying to @orcinus

                  I'm glad to hear that the company is so focussed on the big picture. However, I think they should also focus a little more on supporting the share price. Let's face it, no one is happy to see the price go down. Things like analyst coverage, moving to the TSX, dual listing in the US, using halts, etc will create more awareness of Copper Fox and help our share price.

                  Either way, I'm in until the end.

                  1. Replying to @RabidTiger

                    Why would they want to support the share price?

                    "No one is happy to see the share price go down"

                    Not true at all. Ernesto probably is happier he gets more shares per financing when he does PP's. Me, and anyone else still accumulating prefers to buy low, knowing that they will sell (Read: Be forced to sell on buyout) high. Seeing the SP go high is bad for anyone who still wants more shares. It does suck for those under water, trading etc. However, for anyone just waiting - it only sucks on a psychological level. But it's something that's better because they're not wasting money on PR, Dual listings, etc. Raising awareness doesn't help them, it hinders them.

                    1. Replying to @JayJ

                      Plus......Anal ysts want major Payback, IMO

                      There is not enough of CUU Free Trading to let this happen (in a big enough way to suit them or Institutions)

                      1. Replying to @sydneyb

                        Great discussions today.

                        I`ve also thought that Teck would purchase their part and not offer a price on the seprate lands. Unless we can prove them up?

                        This may take many years to do this as well.

                        If im not mistaken, Teck was the one who told CUU where to take the core samples and what cut off grade to use?

                        I might be mistaken but Im sure Teck told CUU to use the company that is testing our drill results. IF that is true, then I can see why they are dragging their feet on getting our core samples back. If Teck had anything to do with it.

                  2. Replying to @RabidTiger

                    Great discussion here today . Kudos to RabidTiger for initiating it.

                    I was trying to find a discussion we had here before concerning the PPs but I can't find it. My understanding is that the amount of them doesn't matter. If the funds raised are used in qualifying expenditure then they are worth 4 times depending on the back in option from Teck. This means that although the dilution in shares is face value, the value to shareholders could be up to 4 times face value. So assuming the funds are used correctly, these PPs are adding value to the company and therefore our shares. Did I explain that correctly? or even coherently..???

                    I guess it doesn't even matter if the market reacts differently anyway

                    Hmmm....I think I just gave myself a headache...

                    Anyway, great discussion

                    GLTA

                    bbay

                  3. Replying to @RabidTiger

                    Don't think give a rats ass about market perception at this point.

                    70% of the shares are held by the few folks who have actually paid attention to what they are doing.

                    If the market is this blind to what is going on with the information that is available, why worry about the folks chasing the dirt scratch du jour....

          3. It seems to me that one of the key factors driving the use of smaller $ value PPs and restricting them to one major insider was capital preservation. The PPs to EE did not cost CUU as much as they would have had CUU went public.

              1. Replying to @sydneyb

                The "Funds" also went directly into CUU Coffers where it would be available to further the ultimate cause.

                Yes..and if CUU needs more money all Ernesto has to do is purchase the warrants that have been attached to all the latest PP's and bingo.

            1. Replying to @orcinus

              Someone mentioned Teck having lots of lawyers looking and re-looking at things. They have to be careful, because its a catch 22. If they tick CUU off with legal wrangling, they run risk of losing it all.

              They will play nice. Its a big sandbox, and I've heard mgmt say repeatedly that their relationship is amicable. Every effort will be made to keep it that way.

              On another note someone else mentioned recently that CUU has not had discussions with mgmt. Clarification is that they had not at that time had discussion with certain mgmt that would be around purchasing the company. Certainly technical managament (up to the VP Engineering level) has been in discussions.

              Fire

      2. The trickle effect was to make noise. Each time you PP it attracts attention. There's no issue raising 1 large pp. This was done for tactical reasons. I gave them my vote of confidence for using that tactic.

        When Elmer determines what we need to do for this year we will see more of this. However, the only pp'ing required right now is to buy land and pay for permits, studies and legal. They have not finalized the years plans and I think this is because things are fluid right now. I do believe they want to be able to help Teck should a hostile offer for Teck occur. I've been tracking this issue for a long time. Last year they felt safe. This year, not so safe. I think Teck has other deals in the works too and could bloat up to nearly double if they felt the need.

        They did want to haircut the lower portions off the resource but the primary focus was to get the matbe stuff converted to yup it's there. They did a good job. All of the Confirmation drilling was at Teck's request. I asked if the other holes we drilled were enough for Teck's calculations. Elmer said yes.

        1. When Elmer determines what we need to do for this year we will see more of this. However, the only pp'ing required right now is to buy land and pay for permits, studies and legal. They have not finalized the years plans and I think this is because things are fluid right now. I do believe they want to be able to help Teck should a hostile offer for Teck occur. I've been tracking this issue for a long time. Last year they felt safe. This year, not so safe. I think Teck has other deals in the works too and could bloat up to nearly double if they felt the need.

          Webgogs, do you still expect another PP for $4 million?

          webgogs

          Reply in Copper Fox Metals Inc.

          When I spoke to Elmer he said the operations burn rate was minimal and they had enough more for that. The BFS was a prepaid expense. That leaves us with land buy and or NSRs. The other possibility is to put a rush on items. News should come tomorrow with Friday being a good da...

  3. What an excellent post....I love the fact that youve brought negatives up here.

    Amazing how people disregard what a negative is to a stock. I work it in such a manner that when a have a bunch of negatives are applied to the dynamic, and a positive still remains when done; well hell...this stock deserves a bit of money at least. Its stupid to be completely optimistic about anything let alone a stock.....its equally as stupid to be pessimistic. The truth lies somewhere in between and will always contain pessimism. See it for what it is...pessimism happens to all great stocks.

    Ive applied a lot of negative to this stock....and short of extistentialism....I have a hard time coming with scenarios that are both negative and plausible for us.

    I love a good argument.

    That being said I must digress on some of your points, however I shall list why.

    1. We have a huge world class resource - 1 billion tonnes of mineralized rock is a rare find these days

    I would think more like 2.5-3 billion.....maybe more....lets see what turns up here, but I can assure you we were at 1.3 billion in 2007.

    4. We can produce four different metals, allowing us to be hedged against metal price fluctuations

    Copper, Gold, Silver, Molybdenum and high concentrations of Rhenium actually give us 5 metals.

    Negatives

    1. Hole 419 was not a new find. The drill hole location map makes it appear that we found mineralization well south of the resource block model. The map is misleading because the block model is shown for an elevation of 600m, well below the surface. Our actual resource block model goes almost all the way to 6359000 near the surface. The location of Hole 419 was already contained in our Resource Estimate (but likely at lower grades).

    This is an excellent point of conjecture..to be honest I cant refute this point...might I ask where your info is coming from?

    3. Our drill results are painfully slow. There are likely valid explanations for this. However, I'm concerned that Copper Fox is either selecting poor contractors for this job or they have weak control over the contractors.

    Drills move about 40m per day depending on the rock. Then theres moving time for the drills into new locations. However this is a pretty stock rate.

    4. Our budgeting abilities seem to be weak. Why so many financings? Why did we not just plan a large financing last spring and get it over with all at once?

    Ernesto will dilute on a need only basis, look how much he owns.

    5. This is not "cheap". This is a $525M dollar company with a likely 25% stake in a mine years away from construction. There are very few other companies in that situation with a market cap as high as us. So why am I here? Because I expect Copper Fox to be a very expensive buyout.

    Not sure what your figure is but its up for debate for sure. Honestly I love everything about this stock...but if we rush the BFS we're leaving potentially a billion tonnes on the table. Anyones guess at this point but I dont think Teck will pay full price for anything that isnt proven. Fact.

    7. Our Resource Estimate last year was very disappointing. The share price suffered because of it. It was not the shorts, or the frisbee shares, or the big banks. It was our own bad news that caused the drop. It's not the job of a resource estimate to remove rock that is uneconomical. That is the job of PFS/BFS. Our resource should not have gone down

    A billion tonnes at that grade isnt disappointing. Equivalency works like a sliding scale my man. Our RE seemed to coincide with a major drop in global indices overall. For the TA guys our Beta at the time was also rather high. Our drills just offset our grade at that level anyways..moreover the grades are proving up.

    It never hurts to add a bit of negative.....it only reinforces your positives.

    Rogue,

    1. Rogue, also agree with your thoughts and Rabid, great synopsis. It makes me wonder sometimes if the Tech gurus read this board. They are either in awe of the purported knowledge of the contributors or are giggling that we aren't even getting warm. I would think the former.

    2. 1. "Hole 419 was not a new find". This is an excellent point of conjecture..to be honest I cant refute this point...might I ask where your info is coming from?

      I will try explain myself a bit better here. From the Nov 15 news release, we know that hole 419 was started at an elevation of 1037m above sea level. From the Feb 3 news release, we know the hole was mineralized to 257.7m along the drill hole. Since this hole was not drilled vertical, some math will show that it was mineralized to 232m below the surface. Therefore, this info tells us that hole 419 is mineralized from roughly 805m to 1037m above sea level. If you look back to the "2010-2011 Drill Hole Location Map" you will see that the block model is shown for an elevation of 600m ASL. So our results are "above" the model shown. The July "Current Block Model" shows things a little more clearly, but we are still "above" this block model too. The best source of info is the "Main Zone Ellipses Section 6359500" from July. If you find the drill collar around 1037m, you can see that the current block model shows mineralization down to about 800m above sea level. Therefore, the location of hole 419 was already included in the current resource estimate. We likely found grades higher than our resource estimate had, but this was not a new find of mineralization.

      3. Drills move about 40m per day depending on the rock. Then theres moving time for the drills into new locations. However this is a pretty stock rate.

      I was referring to the time it takes to get our assays back. I don't know many other companies that are still waiting for 2011 results so we must have chosen a very slow lab.

      1. "DDH CF419-2011: was completed for geotechnical purposes at the south end of the proposed Liard zone starter pit and intersected continuous mineralization starting at a core length of 10.2m to a depth of 257.7m where the mineralization is cut off by a flat lying mylonitic fault zone. "


        So the mineralization occured after the shearing event. Does this suggest 419 marks the edges of the main system going south east?

        Elmer - My interpretation is that the shearing occurred after the mineralization. This is supported by the Titan-24 data as well. DDH419 is in the starter pit of the Liard zone. The mineralization continues to the south for a considerable distance.

        Not new just an increase and a confirmation of the slope. You are making a technical drilling into a negative! They wanted to confirm the increased grades and the extra distance while getting slope data.

        1. "You are making a technical drilling into a negative!"

          Sorry, I was not trying to be negative about this hole. These results are excellent and I am very happy with them. I was simply trying to squish the rumour that we found new mineralization outside of our resource estimate.

  4. Ok. I get a crack at some of the points. BTW almost all of the things you brought up have been brought up over the past months. I know its hard to remember them all.

    2. There seems to be poor information flow to us regarding delays. I understand there will be delays when working on something as large as this Feasibility. That is acceptable. But why wait so long to tell us? We found out Dec 14 that the feasibility would be delayed. At that point, there was only 1 working week left in the year. Did they not know sooner about the delay? Other companies are able to predict feasibility dates months in advance.

    We have a shareholder group that is voracious for news, and many were asking about the delivery of the BFS, and of course management was optimistic given what they were being told. Now my guess is sometime in November they had the inkling that the contractor's pieces woud not all come in on time, but the contractors like any contractor I've ever worked with keep you optimisitic with their answers. Of course no contractor wants to state "I'm actually working slower than I should be, and probably wont meet my own targets I've committed to", so they play the game. " We're working hard to get it done, etc". Management did what they had to do.

    3. Our drill results are painfully slow. There are likely valid explanations for this. However, I'm concerned that Copper Fox is either selecting poor contractors for this job or they have weak control over the contractors.

    I wondered about this at one point, and called around. Even talked to the folks that prepared our 2D. I learned also that Mgmt is NOT about promotion, and pumping out news releases on every tiny tidbit of info that comes into their hands. Elmer had a methodology of sending the cores in, and waiting till the complete results were in his hands and then announce with one announcement. Others I've experience with indeed throw out flurrys of news releases but you dont get the complete picture and have to piece it together yourself. oh, well.

    4. Our budgeting abilities seem to be weak. Why so many financings? Why did we not just plan a large financing last spring and get it over with all at once?

    What makes you so certain that the financings were NOT all previously discussed and agreed to? It does the intelligence of Mike & Mr.E and Others a disservice to think otherwise. I for certain feel that an amount of borrowing was discussed early on and Mr. E, said something along the lines of "Sure, I agree, however I will loan in stages" This would show good fiscal judgement as he could manage his own cashflow, take advantage of share fluctuations, and ensure the company was doing with his money what they said, in the time frame they said it.

    Just this,

    Fire.


    1. Yes, many of the points have been discussed here before. I suppose I mostly posted to share my frustrations.

      2. We have a shareholder group that is voracious for news, and many were asking about the delivery of the BFS, and of course management was optimistic given what they were being told. Now my guess is sometime in November they had the inkling that the contractor's pieces woud not all come in on time, but the contractors like any contractor I've ever worked with keep you optimisitic with their answers. Of course no contractor wants to state "I'm actually working slower than I should be, and probably wont meet my own targets I've committed to", so they play the game. " We're working hard to get it done, etc". Management did what they had to do.

      Yes, our group here is very demanding with respect to news releases. However, Copper Fox could make things much easier for everyone if they could pinpoint dates. Knowing what quarter the Feasibility will be done is good. Knowing what month, week, or even day would be much better. Being able to manage schedules is an important part of their job.

      3. I wondered about this at one point, and called around. Even talked to the folks that prepared our 2D. I learned also that Mgmt is NOT about promotion, and pumping out news releases on every tiny tidbit of info that comes into their hands. Elmer had a methodology of sending the cores in, and waiting till the complete results were in his hands and then announce with one announcement. Others I've experience with indeed throw out flurrys of news releases but you dont get the complete picture and have to piece it together yourself. oh, well.

      Okay, I can agree with their approach.

      4. What makes you so certain that the financings were NOT all previously discussed and agreed to? It does the intelligence of Mike & Mr.E and Others a disservice to think otherwise. I for certain feel that an amount of borrowing was discussed early on and Mr. E, said something along the lines of "Sure, I agree, however I will loan in stages" This would show good fiscal judgement as he could manage his own cashflow, take advantage of share fluctuations, and ensure the company was doing with his money what they said, in the time frame they said it.

      I am definitely not an expert on financing but I think that if they knew they needed this much money they would have gone to the general public. By only allowing EE to participate in the financings they are locking out many other potential buyers. I personally would have loved to get a piece of that last offering. A strong offering drives the share price higher.

  5. What negatives? In both of your sections, there was nothing new presented other than a summary of topics that have been presented, discussed, debated, deliberated many many times - both here and previously, in some cases, on SH. both your resolve, as well as as your frustration, as a CUU investor are evident and that is perfectly understandable. We feel your pain with not knowing the answers to everything as well as your enthusiasm for a great outcome to this story and a rewarding return on your investment. Patience is truly a virtue but why does it have to be so trying at times? glta, foxy