My post got dwarfed by the NR about the holes, so I'm going to repost my question to the board.

My rationale is geared towards CUU, buyout timing as well as for future investments from CUU profits. Looking at the big picture, and integrating it with its relation to CUU.

With the Xtrata/Glencore merger, is it possible that (short term) commodities market would go down (assuming the merger goes through) since presumably Glencore would want to give shares at a time their prices was highest (and if that's the case, they'd expect their own share prices to go downwards short term). This happened with the IPO, and it did mark the "top" for commodities in the short term then.

If that's the case, how do you think that effects a buyout from any other major? Or, why wouldn't Glencore want to do a merger where they give their stocks at that they think the top is.

If it's TECK and their shares start to drop short term, does this benefit us or hinder us (assuming it's them that buys us out) - though, it's possible someone else ends up buying our position if they try to take on more iron.

I guess a lot has to do with timing of both deals, but generally.

Thoughts and opinions board?

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. These big decisions are based on long term perspective (10-15 years from today).

    Listen to Don at the 2011 PDAC:

    http://watch.bnn.ca/commodities/march-2010/commodities-march-9-2010/#clip429558

    Don Lindsay looks at the copper supply and grades over the last 10 years....

    Then he looks at the copper demand trend.....

    Then he looks at the futur demand....2020.....

    Then he looks at futur 120 TPD projects coming on line...

    Schaft Creek is in his backyard and has 4 metals....they can get 75% of it for under 300 million..They will secure it or someone else will.

    They can make the offer they want...but our insiders own 64%...

    The info below is from the Teck copper presentations:

    COPPER

    * The cost of mining copper is on the rise, up 232% since 2000, with the rise of the byproduct credits (gold, silver, moly) cost of mining is up 130% since 2000.

    * 90th percentile cost estimate for 2011 is at $1.90 a pound....up from $0.65 a pound in 2000

    * Average C1 cash cost of production is $1.14 / lb , up from $0.49 / lb in 2000 (Remember CUU 2008 cost is NEGATIVE 32 cents / lb)

    * Capex per tonne is increasing.....yet CUU is saynig it will go down or stay the same as in 2008.

    * Copper grades are falling strong each year since 1980 and are projected to continue to fall : target="_blank">http://agmetalminer.com/wp-content/uploads/2010/09/copper-grade.jpg

    * Since 2003 Prodction projections decreasing and disruptions are continuing ...6-8% a year of loss. They are lossing 1 million tonnes a year of copper.

    * Chinese copper Imports are trending up since 2004, up from 200 thousand tonnes to 600 thousand tonnes

    DEMAND

    * Keep in mind that Copper wire rod production makes up 55% of the global demand.

    * Chinese wire rod production will grow an average 8% to 2016 based just only currently planned wire production plans.

    * 4 new wire rod mills are planned to come on stream next year in China adding 1.1 Million tonnes copper capacity

    TECK expectation:

    - Decline in America

    - No growth in Europe

    - Strong Growth in the Middle East and Africa

    - Strong growth in India, Thailand and othe parts of developing Asia

    CHINESE CLEAN COPPER DEMAND (5 year plan)
    * Chinese to invest 11.1 Trillion in the power industry in the next 10 years

    - 5.3 Trillion 2011-2015

    - 2.75 Trillion in new power plants

    - 2.55 Trillion in new power grid construction

    * China wants to link all cities over 500,000 population , by increasing high speed rail by 45 000 km

    * China to invest 95 BILLION by 2020 in electric car infrastructure

    - Plans to sell 1 million EVs by 2020 and have 40 million new nergy vehicules on teh road by 2030

    New markets require new projects...and the mine supply is not keeping up with the metal demand.

    MAJOR NEW PRODUCTION REQUIRED BY 2020

    ...45 new projects are required at 150 Ktpa....only 30 exist today.

    1. "Capex per tonne is increasing.....yet CUU is saynig it will go down or stay the same as in 2008."

      My undersatnding from CUU management (based on my discussion with them in Vancouver) is that the Capex will be higher than the 2008 estimate, mainly due to cost of steel.