I'll have to sort these and distill it down. That's a lot of questions but it will be worth the time.

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. Webgogs.....if you can ask him what happened to the BFS?

    Months ago I had stated on this board that we needed to get the 2011 drill results into the BFS with the silver value, That way we could see the true value of what we have here....was told that I was clogging up the board. Then I proceded to write a E-mail to Elmer and he responded saying that it would take too much money and time, That they found it best just to get it out and start the Teck clock !!

    Now I find it ironic that the BFS is delayed???? Ask him whats up with that?

    All I seen that happened was all negative to CUU share holders and the NR disrupted this board.I have lots faith in Elmer....I really need to know what happened?

    I can`t understand or except the fact that it was a man shortage......something else is in play. I think they have been in talks with a price for a buyout , and it wasnt big enough number for Elmer so...we put 2011 drills in the BFS.

    Anyways something seems odd about it...managment lied to me, I`ve still got the e-mail.

    Anyways.....I doubt you`ll get the truth, but you will get the body language out of it. If you like you can private message me with the results if ya ask. Thanks Webgogs

    1. Hi Dodger -

      I felt the same way and said so. I thought I would respond to you since my response also offers a bit of an apology to management as well.

      I had a very good talk with Mike this week. From his tone and what he said, I do believe now that CUU was blindsided by Tetra Teck. I still maintain we should have known of Tetra's shortcomings earlier, but it appears that when the Mine Plan detail was revealed, it came up way short of what CUU was expecting, based on the parameters we set out at the end of last year. My impression is it appears that it was more like a Mine Plan 101 report, which anyone with some knowledge and a computer program could do. CUU was very disappointed with the content and asked for a re-do because of the size and intricacies of our project. Of course the rest of the BFS depends on this critical component of the over-all report. My impression is that Tetra Teck realized they had not delivered what was required, and and apparently even approved of the press release pointing the finger at their shortcomings. This does not make them look good to the industry, and they accepted that. I feel much better about the circumstances now and apologize to management for jumping the "blame" gun without talking to them first. And by the way, if you read/scan the Feb. 7,2011 Environmental Assessment Application requirements posted by Webgogs yesterday (it's only 145 pages), you get a feel for how involved and immense the project is and why it takes so long to put everything together.

      To answer another question, Mike and most of the principal CUU management (Shane, CFO) plus the legal counsel Board member are blacked out, their options are on hold, and as far as I can determine, will stay that way until the BFS release or "something else". There is too much knowledge of the BFS content and whatever else is going on. No clue given as to what that is.

      I find it interesting that there has been no call for the annual meeting, which was on May 17 last year. Legally, 55 days minimum are needed between shareholder notification and the meeting date, so we are looking at June at least. Could it be there may be something else we will be asked to vote on (my wild speculation only!!)?

      And finally, for what it is worth, between the Elmer/Laird appointment, the Jim Gray appointment, the hurried Teckland land claims (before our REE - done by a Teck recommended company) gobbling up from Galore to CUU, the Chinese/Tahitian meetings and of course the Leafs out of the cup again this year, everything points to a Teck controlled District with a strong Chinese partner in my opinion. I'd still like to see a Big Guy bid for CUU tho just for fun and profit.

      1. Generaledger - your explanation of the events of our disappointing new release re BFS delay makes me feel a whole lot better.

        The explanation given to you, and passed on to us, is plausible in its entirety.

        Thank you for sharing.

        Skyaki

      2. Great post, generaledger. The only thing I'm left wondering about is Mike's tone during your conversation.

        Did he sound worn out and beaten down or did you get the impression that he remains positive and upbeat despite the unexpected hurdles?

        1. I know you've talked with Mike, and he is always up-beat. I think he is very positive about the direction we are heading. We talked about a few things which will remain off this board to respect his candidness but I am still of the opinion that I couldn't put my money anywhere else and feel as secure as I do with this stock. Very, very few juniors ever get to the BFS stage let alone have an experienced potential partner/owner (with Big Money Friends) working with them who seem to like the surrounding geology so much they hurriedly buy up claims before our Revised RE comes out. Oh - did I mention we have the world's most sought after basket of goodies -copper, gold, moly and silver with a probable negative copper production cost? Sorry Nadir this rant is not meant for you but some of the mindless posters who won't even read this far to know I'm dissing them. They can look for all the negatives they want, but when I look at the big picture and after all the DD I have done, I choose to follow the money and smell the roses.

        2. "The only thing I'm left wondering about is Mike's tone during your conversation."

          We should be careful how we interpret "tones" of conversations. I spoke with management on a number of occasions and to be honest I could give you a spectrum of tones from one conversation. These guys are very good at waht they do, so trying to pull out hidden meanings (that's basically what it means) is not useful; unless you are Dr. Phil (but I heard he is really not a real DR either; hmm).

      3. Outstanding post, GL. This is the kind of post and information we have all come to expect from the true CUU longs. Hopefully this helps turn the page and people can begin to focus again on what truly matters - realizing a nice return on our respective investments. I am sure your apology to management was well received and I hope others will reassess their initial reaction to the March 19th NR and consider same. As stated here many times, management has never misled or lied to shareholders. Never. Can they or will they discuss everything going on behind the scenes? No. They will only state what they know to be material and/or what they know to be factual at the time i.e. expected or requested timeline for completion of the FS from the contractor - Tetra Tech - in this case. They were blindsided. It will never happen again and Jim Gray is imbedded within TT to make certain of it.
      4. Thanks for the fedback GL

        I am curious about our options in light of the black out

        Obviously Ernesto is frozen so what is the plan to fund the 2012 drill program, assuming there is one

        And I think unless there are some very serious talks ongoing here with Teck, it would be foolhardy of us not to plan one

        1. Metacomet - I'm not sure if David and Ernesto are blacked out. I didn't ask and should have. Definitely anyone with direct knowledge is, but Elmer and the Board may have chosen not to know (with the exception of legal counsel) to keep their choices open. It could be David's Burgeonvest would want a crack at any PP as well as Senor E. Just my speculation. Good question for Webgogs.

      5. At the last check in the Enviro was well advanced and just 4 components were holding it up. Since the mine plan came up sooo short that would have led to problems with the enviro not passing muster.

        Looking at the requirements, 3 years to build! Is this realistic? I read a long time ago that it was 4 years. I have not been able to find that document again but I'm sure it was on an American site. Vette said that was the contractual time but I'm thinking it was a preliminary report. So I want to know about such things. What's really in the contract for timelines.

        I also want to know details about the enviro and some of the questions address that. 3 containment walls... several holding sites... etc. Our new land does tie into this. To me it looks like a revamp was required because the size of the project doubled. Mark my words, we will see this happen. If you thought this was a big project it's about to get tar sands big. There may be more to the rumor about a green smelter than meets the eye. Political rumblings suggest this to be so. There are a great number of concerns for that one but I think they can do it within 5 years.

        I did discuss the new time line to production. Obviously the supply chain to Teck was impacted. I don't think they can shore up the hole so something has to be accelerated. Teck may have to take out a deposit or two near an existing facility. Obviously, Teck should still go after Iron too. If the bank account is open this will not impact us at all. Stay tuned for that one.

        Off the topic, I have not been able to find out what the troop of fully bushed Alcan trucks full of fuel cans were doing in Quesnel/Prince George. I can't see what they would be doing in this area. (Another major hydro project) Earth works are being done as a company is hiring for the measurement team. Something really big is going on and we can't find out a darned thing. Arrhhg.

        Back to the enviro. The above ties in with the ambitions of the politicos to get things going as fast as humanly possible. This means they will try to clear the way for any super project that they can. There has never been a better time to get SC going. The delay was horrible but does have a silver lining. Issues like the bridge crossings can take 2 years to settle. I kid you knot (as in tied in a knot). A long while back a report was tabled showing that the pine beatle and warming was going to cause the river volumes to jump by 400% during melting time. 1 enviro group stopped the whole province's efforts to deal with it by widening bridges spans. Obviously there was dirty play involved. The next year we had towns cut off due to flooding. The report was hidden from the public. Normally, it would take quite an outcry to stop such a thing. In this case it was used as an excuse.

        The flooding issue has not gone away. It is getting worse. With this gov't it may be possible to put in big bridges and dredge the channels so the bridges don't wash away. You can look up the history of the report so that we don't get into a political discussion. What counts is that an entire district doesn't grind to a halt because a bridge floats away. We have a few streams to cross. That means special permissions etc. Remember when the NTL wanted to put toilets on the edge of a stream instead of 150 feet back? We can't have that kind of stupidity. And no, you can't just drive a cat across a stream with out anti spill equipment on the ready. Making a real bridge requires a lot of paper work. Let's hope it's allready in the pipe line and gets expedited. Then we can have a full road this year or next.

        There's probably too much for me to discuss in one sitting. If I can't get every question addressed directly I'll still try to get it in as part of another answer. Anything that must be reworded for compliance or struck entirely will have to be accepted at face value. If time permits. I will drill down where I can.

        1. >Off the topic, I have not been able to find out what the troop of fully bushed Alcan trucks full of fuel cans were doing in Quesnel/Prince George. I can't see what they would be doing in this area. (Another major hydro project) Earth works are being done as a company is hiring for the measurement team. Something really big is going on and we can't find out a darned thing. Arrhhg<

          The snow melt this year for the Nechako resevoir is 160%. The spillway is open quite wide and I think they may want to open it more. Perhaps the Alcan trucks are to figure out what the results of that would be.

          Long term...it may have something to do with them increasing the flow to the generators at Kemano. or perhaps they plan a "run of the rivers" project. Just guessing.

          That is of course you mean Rio Tinto Alcan.

          If the rest of you may be wondering wtf this has to do with CUU, well not much but the extra high spring melt may delay any drilling and road building plans.

          bostrin

        2. What is the first big project likely to come online in the NTL. Is Schaft before KSM and Snowfileds? Thanks in advance
          1. The first projects will be Forrest Kerr (IPP) and Red Chris (mine). FK will produce up to 200MW in summer but only about 20-40 MW in winter. RC will use about 50MW. Both will start construction this summer.

            Of the others you mention, Copper Fox is the most advanced, and has a major behind it. Seabridge KSM needs a major - Seabridge is not big enough to go it alone.

        3. Webgogs....this may be a stupid question, but why would we be worried about the brigdes? Would it be for drill?

          I mean if its for getting the mill up and running so heavy equipment can get to it`s location......that should be Tecks problem NO???

          Im sure our responsability should be just proving up the resource, once that is done, Teck desides what they want to do. Buy a % of us or the whole thing....but still the ownus would fall on Teck to build the infrastructer....at least thats how I would take it.

            1. Replying to @webgogs

              "Have a look at how long it takes to get a permit to build a bridge."

              WG - lets not forget that the Feds have just gutted their EA process to get all resource development projects through a much quicker approval process, and the BC Lib/Cons coalition and the NDPers will go along with that, it's a done deal. Just like we said it was a done deal on the NTL and a lot of the bashers were laughing at us; nuff said.

              One other important part of the equation that folks do not take into consideration in the approval process is that the FNs are fully on board, at least that's what the NRs clearly indicate. So, unless I hear something very different I'll be sleeping like a baby; if I can get bloody surf noise under control - maybe better quality malt will do the trick.

        4. I believe the federal EA and related regulatory issues are a critical piece of the hold-up and a key determinant for Teck. Economic feasibility is only one consideration. A multi-billion dollar deposit primed for extraction is essentially worthless if permission to remove the minerals is ultimately denied.

          Enviro approval may seem in the bag (and I hope it is), but these things can change with the wind as new developments are encountered.

          Teck will want to be absolutely sure there are no future impediments or surprises.

          A question on my mind is what the obstacles and timeline for regulatory approval are and if we are comfortable that approval is forthcoming.

          1. I too am concerned with the timeline Gov,t of Canada website for tracking EA approval MPMO tracker does not even list our project yet. Yet Ajax, Yellowhead and others that are perhaps further from production or go ahead are listed as having submitted EA items 18 to 24 months ago. Perhaps webgogs you can shed light on this Skibum2
          1. Enviromentalits are pressing for a green smelter at Kitimat. This would process all the copper from the district in a far greener way ensuring China pollutes less. A new high tech facility like this run on water hydro further reduces pollution. It would also run a lot cheaper making it competative with China and Japan.

    2. sometimes management has to lie in order to not reveal insider information, if a portion of management is in blackout and teck is staking the land between Galore and CUU things could start to get real interesting soon.