I am in the commercial real estate industry where we too use the discount cash flow model (DCF) to determine value/cost. In most cases, this analysis is justified based on the time value of money where you discount future cash flows of a fixed investment to provide current value. However, this model assumes that money will make money over time. Often this discount model uses a range of discount rates, in our case with CUU, 5% & 8%. In this economy, an 8% rate is imo highly unreasonable, particularly given the stance taken by the FED yesterday in keeping rates at extremely low levels through 2015. A 30 year US treasury bond yields below 3%, and this rate should relect more of the time value of money in a discounted cash flow analysis. (I know, don't get me going on the Fed here)

In the mining industry, the dicotomy here is the fact that our minerals in the ground are inherently tied to inflation and the time value of money. The fact that a fixed/ave. price for our minerals is used in this analysis (correct me if I'm wrong here), then discounted to determine net present value, makes no sense from a financial perspective. If the rate of price appreciation of these minerals over the past 30 years is then incorporated into the analysis, along with cost expectations using the same trending analysis, then our NPV discounted at 3%-5% would be more logical. Certainly if inflation took hold and we averaged say 10% over the next 30 years, the value of the minerals in the ground would also increase based on this trend change, which would self correct any inaccuracy in the NPV model.

I understand the mining industry is looking at different valuation models and Elmer did mention this as I recall. The link below from Ernst & Young provides examples of optional models that mining companies are looking at to better evaluate deposits and mitigate risk. In our case it would be reward. I would be interested in hearing from those on the board who have an accounting/finance background who may be able to support or refute what I believe to be a fundamental inconsistency in valuing deposits like Schaft Creek.

http://www.ey.com/CA/en/Newsroom/PR-activities/Articles/2010-CMJ-Mining-Valuation

DC14

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. I was under the impression that showing there was potential to expand was an important component of the Schaft Creek project. So it's not so much proving the value of the minerals in the unexplored lands, but allowing that there might be further mineralization so that the project as a whole potentially has life beyond the Schaft Creek mine life. The expansion possibility is important for the initial funding.

    They have stated this quite a few times in their MD&A: "the value of a mineral project has two components, the Net Present Value of a mineral deposit based on a feasibility study and the value related to the potential of finding additional mineralization. The second component of the “value chain” is the potential of the unexplored land within the project."

    I'm not sure why they didn't complete a good drilling program this year, but they explained why they did the aerial survey: "To identify/add value over and above that established by the feasibility study, Copper Fox is considering the merits of completing a high sensitivity airborne geophysical survey over the entire Schaft Creek property to identify other potential areas of porphyry style mineralization."

    They seem to be wanting to point to the potential so that the deal is perceived as being open-ended rather than completely defined. If this is necessary then drilling might not have added sufficient value over and above the aerials.

  2. It's my understanding that the discount rate is not simply related to the interest rates, but also related to the risks in the project. I've seen higher discount rates used when projects are deemed to have a higher risk of not going to construction.

    1. Risk is absolutely a factor with discount rate...same with P/E ratios. But that is up to the purchaser to determine not Tech Tetra. It makes me wonder who comes up with 5% or 8%....?

      1. oh yeah..I sold the Harley so had to change my picture....couldnt use a vette since it was in use and the GMC Terrain is not sexy lol

        1. One more question, Accountant, that mountain in the new picture of yours, does it have seams of copper running through it?

          ;)

          1. nope, that's blackcomb/whistler last year..no copper

            ....per Ernst & Young

            "DCF NAV calculations have many uses in the mining industry, including justifying project design choices or investment decisions, supporting NI43-101 resource declarations and providing value measurements for accounting tests. While the DCF method is widely accepted, it is subject to limitations and is at times unreliable. A gold sector example is the calculation of a gold project’s NAV by valuators or analysts who then multiply the result by a factor of (say) 1.8 in order to reconcile the DCF NAV with market valuations. This discrepancy is usually attributed to the DCF method not recognizing optionality or exploration potential of the project."

            maybe we take the NPV at 5% and then multiply it by 1.8....

            so let's say NPV is $5 billion X 1.8=$ 9 billion

            $9 billion X 24% /420,000,000 shares = $5.14

            so $3 is safe and $5 is maximum

      2. Accountant

        Agreed. I see industry leaders using 5% much more of late, especially in Canada. In his commentary from the Denver Gold Forum (posted yesterday), Pierre Lassonde often refers to the 5% NPV.

        p.s. love the new pic...a beer and a mountain....cheers to Schaft Creek!

        DC14

      3. Good point Accountant. Regarding the 5 and 8 percent discount rate, I think those are used because of the inflation that has hit the mining sector. The mining sector has seen cost inflation much higher than the general consumer.

    2. That's my understanding of the role of the %age in NPV calculations. A lot of projects (e.g. South American) with geopolitical risk use a discount factor as high as 15%.

      I dont' think of the %age as being only set to capture inflation but also the risk of the project being successful due to political meddling, engineering and market uncertainties and the fear of the unknown.

      Tck chose the 8% that we must use in our BFS. They could have chosen 5% which would have been fair but the extra 3% allows buffer room for extra, unforseen risk.

      It is interesting that CUU brought up the notion of using another accounting/valuation method (July 2011) a while ago but that notion seems to have dropped off the page.

      July 2011 MD&A (pg4):

      "Porphyry deposits of the scale to be mined over a number of decades are difficult to value due to the inherent uncertainties in estimating long term costs and metal prices.

      Recognizing this reality, Copper Fox’s strategy is to reduce the payback period for recovery of the initial capital expenditures and then concentrate on maximizing the cash flow over the life of the proposed mine.

      The most common valuation method used to determine the value of a mining project is the discounted cash flow method (“DCF”). Using this method, a long mine life results in a longer discount period thus lowering the estimated NPV.

      It is essential that the initial capital costs are recovered as soon as possible. After recovery of the initial capital costs, the annual cash flow is the primary metric used to value the project. The longer the mine life, the more value is added, hence the need to move Inferred resources into the Indicated and Measures categories to extend the mine life.

      An alternate method that is now being used to value long term mining assets is referred to as Real Option valuation. This method uses the same input parameters as the DCF method but treats future pricing of metal prices differently due to changes in metal pricing cycles."

      1. An alternate method that is now being used to value long term mining assets is referred to as Real Option valuation. This method uses the same input parameters as the DCF method but treats future pricing of metal prices differently due to changes in metal pricing cycles."

        As I recall, there will be more than 1 NPV valuation option provided, as with PFS.

        If in fact Teck was behind the 8% NPV, we don't have to accept this as true value. The difference of 3% will be several billion. Perhaps this is where the sides differ. This will be a negotiation and Ernesto is no dummy.

        DC14

        1. I agree DC14. The 8% 'chosen by TCK' is the value that is stated in the Teck Agreement to test the BFS economics. At this discount, the project need only return one single $1 to be 'positive'. TCK may well have another discount %age that it uses privately for these types of projects.

          Indeed the difference of between 5% and 8% is huge. By my numbers and current 3 yr metal prices the NPV at 8% would be about $10.45B. At 5%, the NPV becomes $14.183B. A difference of $3.733B!!! That is quite a bit of wiggle room for those with the sharper pencils.

  3. Elmer has repeatedly said that mineralization can't be confirmed without drilling. He did also comment that they have 1-to-1 correlation between the Titan model and drilling on the Paramount/Main systems. Discovery zone is apparently a different system or mineralization event so things may not correlate so nicely as in our heavily undestood Paramount/Main zones.

    I would think that we would need to take the Mira product and insert a few key drills into each zone we can reach this year and demonstrate mineralization and some relationship to the Mira. I dont' see that happening with this year's bizarre (my opinion) drilling season.

    The lack of drilling this year was telling me that a deal was pretty much done. Hints of restarting the drills is throwing that idea out.

    TCK staked its 80k hectares for something like $150k - peanuts. I see it as more as cheap insurance against loosing control of this area of the district and as something that will add value to either Galore or Galore and Schaft (given an CUU buyout).

    I don't have a running tally for how much CUU spent on its claims expansions since spring 2011 but I'd guess it is well under $1M.

    So... I think we will get a bit more than 'squat' for our undrilled zones and district but I don't think it will add more than a few dimes (10cents X 406M shares = $40.6M) to a buyout price unless a really compelling case can be made with the Mira product covering the undrilled zones and the drills to date or, better yet, demonsrating the SC Mineralized Trend all the way north to where it meets up with Edziza Prov. Park.

  4. If $3 is for 50% of NPV

    Then $4.02 is for 2/3 of NPV

    $3-$5 is the range plus we have the AZ real estate to play with

    District concept should put us in higher part of range

  5. You got me double taking my figures Dsikorsk. They are BIG numbers.

    The steady rise in the 3 yr average metal prices are being very kind to my spreadsheet. I simply updated the spreadsheet with the 3yr price as of today. I veiw these numbers as the best case scenario. I also think the project could sell for about 1/2 the NPV so the buyer has upside/motivation for its investment.

    I'm still in the ~$3 buyout (SC project and Sched A lands).

    Here is my figures from March this year: http://96.126.111.98/ir/CopperFoxMetals/forums/discussion/topics/522412-from-pdac/?message_id=1655574#message_1655574

    My figures try to account for higher grade starter pits for the first decade then runs the average RE grade for the remaining mine life. In reality, after the starter pits are finished the average grade will be much less due to the amount of ore near the 15% Cu eq.

    I haven't factered in that 'fall down' though. I reason that while the starter pits have finished, they finish in higher grade material at depth along with the 'shell' of lower/average grade to be consumed as the pits expand outwards. What will be the blended grade then? Also, by that time, the Capex is theorectically paid off plus, the discounting effect on production from 10 to 40 years in the future really chops down the income. The bulk of the NPV is within those precious first years.

    jmho, dyodd.

  6. Not exactly so Dsikorsk.

    Example- Andean Resources, See below. Only 2.5 million oz reserve estimate. 3.6 Billion offer from Goldcorp !

    The point here is in proving the potential (ie. District). you see where I am going with this. Correlation, geology, etc etc. There is the potential for great value in our adjacent properties without 10 years of drilling if you can prove that the correlation is there. This I believe is one of the purposes of the MIRA. Cheers

    Ldubs

    CERRO NEGRO

    Goldcorp said Andean's principal asset is its 100 percent owned Cerro Negro Gold project in the southern province of Santa Cruz in Argentina, which would add to its gold production pipeline.

    With an estimated reserve of 2.54 million ounces, Cerro Negro's owner are getting top dollar for the operation.

    "With this project you can add ounces year after year after year, and therefore, add value for your shareholders," said Goldcorp Chief Executive Chuck Jeannes in an interview.

    He said new drilling at Cerro Negro had indicated significant additional resources.

    "Goldcorp has been built on such tip-of-the-iceberg acquisitions," Jeannes said. "We wouldn't be surprised to see the indicated resource double in fairly short order."

    CERRO NEGRO

    Goldcorp said Andean's principal asset is its 100 percent owned Cerro Negro Gold project in the southern province of Santa Cruz in Argentina, which would add to its gold production pipeline.

    With an estimated reserve of 2.54 million ounces, Cerro Negro's owner are getting top dollar for the operation.

    "With this project you can add ounces year after year after year, and therefore, add value for your shareholders," said Goldcorp Chief Executive Chuck Jeannes in an interview.

    He said new drilling at Cerro Negro had indicated significant additional resources.

    "Goldcorp has been built on such tip-of-the-iceberg acquisitions," Jeannes said. "We wouldn't be surprised to see the indicated resource double in fairly short order."

    1. I would definitely consider us a high potential candidate to be considered a "tip-of-the-iceberg acquisition" by a major.

  7. I'm glad that managment doesn't share your evaluation of our other lands dsikorsk otherwise they just wasted millions doing titans, aerial surveys, mira etc. just to prove squat! ES is one dumb idiot for wasting the companies money (not).

  8. I have to agree that the extra lands aren't worth that much without drilling. Been chatting with some mining engineers in Vancouver recently who are very familiar with the golden triangle - they confirmed to me that drilling needs to happen to prove up the value, as nice as the aerials and magnetics are (and RE's for the drillings needs to happen too, although an RE is a relatively cheap item compared to the drilling).

    We're undervalued pretty far I believe based on the RE 2012 properties alone. Really not sure what Elmer's plan is for getting the value out of the other properties which constitute the bulk of the deposit. Maybe Teck "taking" the whole district leaves us exploring still with some type of agreement (that could include paying expenses and ongoing NSR for the future). I guess we'll see shortly here :)

  9. Hey DC14

    You make alot of sense. Guess you have to look at true rate of return, not inflation. Frank Guistra is betting on inflation and one way to win is to have lots of assets that go up with inflation and lots of low interest debt that you repay with lower purchasing power cash. I agree we should be using 3% discount rate since inflation will take care of rest of the return.

  10. Teck acquired the land around Copper Fox on April 2 2012, Teck pulled out of QB2 on July 9 2012 and Teck announced raising 6 billion on July 4 2012