Skip to content
Sign in

Post

Copper Fox Metals Inc.

You’re reading Metacomet’s reply in this thread.Jump to it

Treasurer3.1 rating from 49 members708 ptsRate

Calendar - sept 21

Tomorrow's deadline of "end of summer" expires well....tomorrow after the bell closes. Or have we given an extension of September? Correct me if I'm wrong. Web and Vette so quiet......is unsettling. Yes I am in this till the end. Just sweating it out. GLTA UET

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. If it doesn't come out tomorrow that will make TT a BFL company and the biggest shites in the industry. If this is the bench mark for the industry it's time to pack it in and avoid the Jr market completely. The last epic failure did send a message to the entire market that these companies can't be trusted to produce a report on time nor accurately. BGM ditto. Given the millions companies spend it's a shocking failure and extremely damaging to the fragile risk industry. CUU and now BGM have made their rounds in the investment culture and I know this first hand. I'm not just refering to the people here. I think it's critical to the entire industry that this report comes out on time and flawless.

    We hired a babysitter to hold their hand. Our guy probably has to sing them lullaby's at night so they go to sleep. What an embarrassment. Thier CEO should be sacked along with a dirth of incompetent managers. Whack'em all as O'leary says. If a company that contracted me had to send another general contractor to supervise me... I'd quit and sell my tools.

    I would only accept Elmer Nr'ing us to say he sent it back to make an improvement. But, there's no new data that would cause this. Our guy is on this all day long so if they know it will not be out tomorrow they should have advised the market asap. No blurring of the dates. Oh... end of Sept. Oh... next quarter. Oh...

    I don't accept that. I know full well what the complexity issues are. I also know that we added a good measure of extra time to produce the best BFS we can and we threw extra manpower at it. If all of these fail the market will crush the sp and it will not recover. When they finally do release the BFS it will be treated with the same glasses as BGM. In fact, we will probably rank lower than BGM just because of the capex. The first failure totally tarnished the stock and the management's reputation. Since then they have recovered 1.5 points. While the deposit is top notch the management is not considered "up to the task" despite what we know about them. The general market does not probe that deep. They like sound bites. So if they miss this one then Arizona will be a bust. We will have no choice but to hope EE continues to fund the company. At that point they might as well go private.

    CUU. DO NOT FAIL US.

    1. "I think it's critical to the entire industry that this report comes out on time and flawless."

      WG - the time frame is "fuzzy" at best so I don't fret about that, but I am very confident that the BFS will be solid and that's all it matters. To be honest, I care little what the retail investors do, and if they want to sell after the 21st it's their loss.

      1. I would like to see some of the tarnish come off Canadian Jr stock. Failures like this make us look very very bad. Take the guy from BGM for example. Is this really how you go about attracting investor dollars? I want cuu to have a future.

        1. Good enough reason to not be consistent with NRs. I guess it's better to screw up on this than on the final product. We will quickly forget this whole drama if the doc is top notch. ES will then suddenly be perceived as THE guy to hire for a job well done. His rep is on the line like no one elses. If he still wants a job as the Bid Cheese in the future. The news will be good, now we just need to wait and see HOW good.

          1. Well I don’t think CUU cares about when this report comes out. They are not concerned with anyone in retail one iota.

            It will be out when it’s ready. The unfortunate thing is the share price will pay the price when its late.

            1. Replying to @Todor777

              IMO you are partly right: It will be out when ready.

              I actually think instead of saying "they are not concerned with anyone in retail one iota", it would be more accurate to say "They realize there are many in retail who still dont grasp the magnitude of this project, and have not recognized that it is in that retail investor's best interest to have management do this up right"

              I am quite happy with management and feel 100% confident that the time and money they are spending on this is actually indicative of their concern for me in the retail.

              :)

              Fire

              1. Replying to @firestarter

                I agree

                I think the truth of the matter is that CUU is a very junior client to Tetra and they, like most consultants in whatever field, treat us as such

                I have no doubt that Rio Tinto or Teck for that matter would have their deadlines treated with a lot more respect

                1. Replying to @Metacomet

                  Um, ah, you might be surprised about that. TT is barely holding it together. We hired a babysitter for them because they can't be trusted to get the job done period. If we don't trust them who does? I see bankruptcy coming. I bet this isn't going to be their only epic failure on the list of clients. There's a number of people who now think we will see the BFS near the end of Oct. They are citing other companies who are being impacted be the poor management decisions by TT. TT was supposed to be in expansion mode and fine tuning acquisitions. It sure doesn't look that way from the perspective of our babysitter. Expansion has failed miserably. Do some research on the Chilean office. Just a mere 60 employees and they can't manage that.

                  "Cons – Tetra Tech is a big company comprised of many acquisitions and each company operates separately. Incredibly frustrating to be chasing same clients within the same geographic area and management has absolutely zero interest in changing this culture. For over 10 years the company has does absolutely nothing to better integrate all the individual companies. When visiting an office in a new location you are treated like a visitor from a competitor and not at all part of the same company. Transferring to a different office is like applying for a new job. All the various P&L centers hoard work and will use your qualifications to win work that they have no intention of sharing with you. Salaries at Tetra Tech are definitely on the lower side in the industry and time office allowance is ridiculously limited."

                  "Cons – Management looks the other way when the client or subcontractor bullies employees. Complaints are rarely reviewed and action doesn't really get taken. The client has full control over all direction, resources, processes, and participants. Developers work on multiple projects but rarely together. Communication is poor. Very little time is spent developing applications. Most time is spent towards participating in meetings, sometimes about other meetings. People are put into positions they are not qualified for. There is favoritism with specific employees. There are multiple unreasonable constraints on development, such as performing development against databases that are behind numerous firewalls, causing development to take at least 10 times the norm. The tools are poor. Technology is about 5 years behind the curve."

                  1. Replying to @webgogs

                    you are implying that they are professionally incompetent which is ridicilous and uncalled for specially now at this critical period WHEN copper fox is in the process of releasing their BFS

                  2. Replying to @webgogs

                    If TT is viewed this bad. Will their reports be trusted? I think we will see another delay personally. Just basing this on their track record. It will be unfortunate how the SP will be pounded. I am still hoping for the best
                    1. Replying to @Todor777

                      lol tetra tech is a massive company and far from crooks and far from bad workmanship. If you having trust issues don't forget that Jim Gray has been on them since right after the march delay. The BFS will be rock solid.

                      1. Replying to @deeppocket83

                        Unfortunately, Jim will share the brush if this is 1 second late. His reputation is on the line along with everyone else. I really can't see him farting around.

                    1. Replying to @contrarian2

                      Yes, I can say that indeed. Can you say copy paste? Those are employee comments.

                      It seems there's a lot of you who thout TT was this wonderfull saviour company. Ahem people Wrong. When you peek under the carpets you will find public ratings of them that are not so flattering. Just because I didn't give the Pro side doesn't make those comments unfair in any way at all.

                  3. Replying to @webgogs

                    You know this doesn't pass the "smell test" !!!!!! How could you possibly know all the info you just spewed? JUST ASKIN.........?..
                    1. Replying to @kodi1234

                      Research. Didn't anyone look into TT? I told you back then that TT was at Tech's behest. If it's not in Elmers hands tomorrow don't be surprised if they blow through the deadline and this wraps up in the Spring of 2013 like I suggested it may. I've had all the assurances I guy could get but seeing is believing. Tomorrow I want to see.

                      1. Replying to @webgogs

                        "Research. Didn't anyone look into TT?"

                        Yes sir I did, and here are my findings about a very special high intensity training program offered to all TT emplyees.

                        In order to assure the highest levels of quality work and productivity from employees, it TT's policy to keep all employees well trained, through our program of Special High Intensity Training (S.H.I.T.).

                        If you feel that you are not given enough S.H.I.T. on the job, please see your manager. You will be immediately placed at the top of the S.H.I.T. list.

                        Employees who are unable to handle S.H.I.T. will be placed in Departmental Employee Evaluation Program (D.E.E.P. S.H.I.T.).

                        Those who fail to take D.E.E.P. S.H.I.T. seriously will have to go to Employee Attitude Training (E.A.T. S.H.I.T.).

                        Since your managers took S.H.I.T. before they were promoted, they do not have to do S.H.I.T. as they are already full of S.H.I.T.

                        If you are full of S.H.I.T., and qualified you may be interested in a job, training others. We can add your name to our Basic Understanding Lecture List (B.U.L.L. S.H.I.T.).

                        Those who are proficient in B.U.L.L. S.H.I.T. can apply for promotion to the Director of Intensity Programming (D.I.P. S.H.I.T.).

                        If you have any questions, please direct them to our Head Of Training Special High Intensity Training (H.O.T. S.H.I.T.).

                        1. Replying to @orcinus

                          Orcinus - heard that one before many times but I still get a good laugh from reading it, everytime. Great.

                          And then there was the Blues Brothers wHoley S.h.i.t. whats up with the trading :) But we've got Elmer & EE thank God, and anything else relevant, for that matter.

                          I know I'm backing the right S.H.I.T. H.O.U.R.S.E company its a winner (Stock HereIts TightHoldOn UR Shares Elmer’s company is a winner)

                          Cheers Topaz.

                        1. Replying to @contrarian2

                          Lol, why? Dig much deeper than that if you want a true understanding of the pressure TT is under. If they are the best that there is then we are in trouble industry wise.

                      1. Replying to @bablitz

                        Webgogs, with all due respect you're characterization of TT as a engineering firm that is "barely holding it together" is terribly biased and unfairly based on the opinions of very few employees. Did you bother to read the other reviews of employees that were happy to work there and were satisfied with the working environment?

                        Every major company has their problems and quirks. As a retired engineer I haved worked for several large Engineering companies (one even considered a top notched firm by their peers ) and they all have similar problems that large corporations deal with. If you look hard enough you can always, always find several disgruntled employees that wil bad mouth everything about the firm. Does it make the work they do unprofessional - No. Does it make their work shoddy - No. If the right people are working on the project and if the managers involved are professional, the work will be done professionally.

                        And speaking about project deadlines. Yes, sometimes deadlines aren't meant. The biggest reason that they are missed is because of client changes and inputs received along the way. If a client is not happy with something they can request changes. Changes, depending on what they are could delay a project from a few days to weeks. It is not the firms fault when these things happen and believe me they happen quite frequently. So if TT does miss their stated deadline by a few days or weeks it is imho, not a reflection of unprofessionalism. It may be due to a client request of a change or rework of something. Elmer is taking the time to produce an airtight BFS so I am not surprised if there may have been several changes or reworks done along the way. You cannot have a precise timeline when doing work like this. It is that simple.

                        Having said all that I believe the BFS will be done on time in Sept. The major components of the study have already been done so there will likely be very few changes if any before we get the final report.

                        1. Replying to @cbew

                          It's nice that you've worked for large companies. But my perspective is not from the bottom looking up. It's the other way around. So I know about the body corporate. Those were just a couple of the comments. Like I said, dig deeper. That's just the tip. Research the customers they serve. Look at the timelines. Get more facts. Then judge me. Does it not strike you that employees say the company allows customers to bully them? Why do you suppose a customer would do that?

      2. If you look at the calendar it makes sense to release the Feasibility next week, Tuesday for example. Then the Toronto conference is on Thursday. I would be worried about releasing it tomorrow and having the momentum stopped by the weekend.

        Perhaps tomorrow we'll get the mine plan and the MIRA as a teaser.

        If this Feasibility is going to show an improved Capex, and I have to think it will because Elmer surely wouldn't keep saying so at this point, then this could be received with some enthusiasm.

    2. Great post Web. I feel the same way.

      However, BGM released a resource estimate, CUU a bankable feasibility study so I don't feel they can be compared (i.e. when you say that "we will probably rank lower than BGM just because of the capex")

      1. I would add that BGM trading was halted because its RE (not done by TT) raised red flags wrt the 43-101 requirements. Still halted.

        Have a look at BGM's latest RE and CUU's. Quite obvious differences with BGM's looking rather shabby imo.

        I don't see any similarity between the two companies, documents or near future.

        1. There is no comprison whatsoever between BGM and CUU

          Can't blame the engineers for management gaming the findings and failing to adhere to applicable law in their releases, which was what BGM did