Teck Hunts...
We seem to be appearing in more Teck articles as of late?
Join the conversation about Copper Fox Metals Inc.
ReplyYou’re reading RabidTiger’s reply in this thread.Jump to it
We seem to be appearing in more Teck articles as of late?
Join the conversation about Copper Fox Metals Inc.
ReplyYou're right, we're being brought to the attention of investors that are interested in Teck. it was bothering me because they kept using 2008 prefeasability numbers when we have an updated RE. showing a much better measured and indicated resource.. then the light bulb went on. they're introducing us with the low numbers and when the FS comes out the "new" much higher resource figures can be used to justify whatever they are going to pay for us.
That's my story and I'm sticking to it.
The foregoing is a product of my imagination, there were no back alley meetings and it did not come from a friend who has a friend that has a job somewhere...trust me
On another note...Art, Mavis had better be the name of your dog or Maude may whack you with her cane.....chunky
let them use the PFS numbers because once the BFS comes out they will see all that extra work by Elmer wasn't for nothing which than ='s to bigger buyout price and shock factor for all those investment firms that only concentrated on the PFS numbers....
Our updated Resource Estimate is actually less than we had in 2008. I expect we will have more reserve now though. The feasibility will tell us.
Hey RabidTiger,
I reviewed the PFS, it looks like the new resource estimate is greater than the 2008 numbers, unless I am mistaken.
from what I saw:
1.4 billion tonnes in 2008
1.8 billion tonnes (included inferred resources) in 2012
Yes, you are correct if you include Inferred. I ignored Inferred since none of that will be used for the feasibility study. For anyone looking to compare, the news releases are from May 31 2012 and July 3 2007.
RabidTiger, I just went into the CUU website and they have the MAY 23,2012 RE listed as
7,106,224,600..CU..M&I 7,368,000..AU..M&I The figures Teck is using are
4.76 billion lbs CU 4.5 million oz AU
These figures are what I based my previous post on when I said Teck may be lowballing the numbers now so they can use the higher numbers to justify our buyout.
It was just an idea and may have zero merit......chunky
Replying to @chunkytoast
That's why it's important to distinguish between Resource and Reserves. Resource is what's found in the ground through drilling. It's measured in Measured, Indicated, and Inferred, based on the level of confidence in the data. Reserve is what can be economically taken out of the ground. It's measured in Proven and Probable.
So back in 2008, we had 7.7 billion pounds of Measured and Indicated copper Resource. However, the Preliminary Feasibility Study tells us that only 4.76 billion pounds could be removed economically (Reserve). So Teck is not necessarily lowballing the numbers. They are just using the most recent economic numbers (PFS). Our new Feasibility Study will give us updated Reserve number
Replying to @RabidTiger
Thanks RabidTiger you perfectly answered my questions/confusions about the 4.76 billion pounds vs the 7.7 billion pounds