I've seen a few people say that the "BFS is not complete. It is. It's been complete since September, as per the news release (September 25th):

The optimized plan will be used to complete the economic analyses and project sensitivity. All other aspects of the Feasibility Study are complete. Merit Consultants International Inc. of Vancouver, British Columbia has been contracted by Copper Fox to perform a peer review of the Feasibility Study.

It's done, and has been for a while or they have blatantly lied in an official news report to the public, not just some phonecall. There's clear documentation with little, if any room for interpretation. In fact the optimized mine plan was completed even before then and they were supposed to have completed the economic sensitivty in early September. Most people here have stated themselves that this section of the BFS (economic sensitivity) can be completed in one day and by a junior mining engineer. Do you really think they took 3 weeks and still didn't finish it - when they projected it to be done much sooner? As per news release (September 4th):

The optimized mine plan has been completed. Sensitivity studies related to capital recovery versus daily mill throughput are being completed to select the optimal start-up scenario for the Schaft Creek project. The final phase of the feasibility study, the economic analysis, is expected to be completed in early September.

I don't think so. We're not dealing with management that's Bush league. Elmer has not just worked on 5 mines, but was a part of putting them into production. You don't have that much experience and make those kinds of mistakes, and if they do you certainly don't wait to the last minute to let people know. There are things going on behind the scenes.

"But we could be doing reviews". I think this position is naive. We're not even on the client list for Merit or part of the Project Portfolio on Merit's website. Even outside of that, asking someone within the industry how long it takes even though you may get varying answers - you're not going to get an answer over a month. It's been 2. From anecdotal evidence we've heard "Merit completed their review in a week" or calls from Merit indicating "It can take from a week to a month". Call Merit yourself and ask how long one takes. Look at the last PP, we didn't use all the money; if we were still working on the BFS we'd need to be paying for it. Doesn't look that way.

So what does that mean? They can't be working on the actual BFS. Them doing reviews seems absurd. Don't forget, in addition to being a year late, we had someone reviewing the process as it went along (Jim Gray) so the chance of an issue with TT trying not to hurt their reputation further, and while having a babysitter are slim. The amount of time to do a review is far too long considering the process in any scenario, let alone one where we took steps to have supervision the entire way through.

Something else is being done. They are not working on the BFS. It's up to you to decide what that is, as anything else is speculative. The above are facts.

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. They can't be working on the actual BFS. Them doing reviews seems absurd.

    I agree that we're not reviewing the BFS, as in still working on writing it, but I think we're going over (reviewing) the final version right now ... I don't think we're reviewing with Moose Mountain, Merit, Tetra Tech, or Matt Bender anymore ... we're at the review/discussion stage with Teck and probably have been for a month or so now. Quite possible we're in the thick of negotiations too. I'm sure the mine plan and feasibility has been geared to Teck's preferences in terms of technology and operations. However, they may have had further questions about the mine plane, our environmental plan, metallurgical testing and how the ore characteristics will affect production, whatever ... the NTL is the last of our worries as that is well on its way, and will get done.

    We're still largely in the dark, but everything is pointing towards negotiations/discussions with Teck. If I were Elmer, I'd be happy to take 4-8 weeks to answer all Teck's questions methodically, if they have questions, and get the best value here. I don't think Teck taking numbers of months to review the pre-BFS and then a few weeks or month to view the final product is too long. Just don't know where we are at in that process. Still hoping for Xmas ...

    1. I think you are probably right on, in all points

      My question would be, why then is the BFS being held from public disclosure?

      I continue to maintain that the release of the BFS is a seperate activity from the Teck discussions

      Teck would be free to ask whatever they want, and maintain all of their rights even after the BFS was released

      It doesn't make sense to me why there would be fear of a market reaction to the data

      If the numbers are so good that we get a frenzy, explain the downside to me

      Are we really worried that the market will place a value on the shares that Teck is uncomfortable with?

      I thought that was the desired result

      ...and no I don't accept that the we should be blacked out for own good

      That is nonsense

      1. ...which leads to my earlier contention that Teck cannot and will not accept the terms in the original agreement

        They will not accept forming a JV to develop a mine that they must fund with CUU, or its assigns, as the controlling partner

        ..nor will they accept the possibility of their Liard shares becoming part of a free trading entity upon release of the BFS

        ..nor will they accept the requirement to complete a mine in 4 years, subject to the management of the JV above

        For these reasons, the only question for Teck is do they want the mine, and what are they willing to pay for CUU

        ...we are owed the BFS in any case

        1. I'm not sure what you're insinuating? They just won't do what they'd be legally obligated to do? They can't just "not accept" things they've already said they have in writing...via legal documents.

          As for not seeing the BFS immediately, the BFS in and of it self isn't important. Hold on. Let me explain. What is important is a buyout. An exit strategy. Unlocking the value of our current shares. The BFS, in and of it self is not these things, it is a tool towards these things - and an estimate of how much for these things.

          If by not releasing the BFS immediately, we get what we're actually after in an easier, and acceptable buyout in terms of price, so be it.

          At the end of the day, none of us REALLY care about the BFS per se, but a liquidity event. The BFS is just how much we should get for our liquidity event, and the tool to obtaining it.

          1. Insinuating?

            Hell, I can't say it any clearer

            The BFS has not been released because Teck is trying to figure out what they want to do

            They do not want to sign over the Liard interest, which they have to do upon release of a qualifying BFS

            ..that would raise the risk of Elmer, selling CUU's interest, maybe to someone in Matt Benders Rolodex, for more than Teck is willing to offer

            That entity would assume the controlling position in the mandated JV to build the mine...Teck could not accept that situation

          2. "At the end of the day, none of us REALLY care about the BFS per se, but a liquidity event"

            Don't be silly

            That is only one outcome

            I would be just as happy, maybe more so, depending on the Teck offer, if the BFS resulted in a market increase, which I have every reason to believe will occur, could result in an ultimate valuation superior to what Teck wants to pay

            ...and that occur much sooner than a buyout, like overnight

            1. Replying to @Metacomet

              I would be just as happy, maybe more so, depending on the Teck offer, if the BFS resulted in a market increase, which I have every reason to believe will occur, could result in an ultimate valuation superior to what Teck wants to pay

              I think that the BFS will result in an increase, but not one that would go over what Teck may offer. There's still the risk involved in how much we actually own of SC until Teck backs in. And even then, that's still a form of a liquidity event - you just want to sell closer to fair value. Regardless, I think the markets appetite for risk and juniors especially isn't high enough to send it over fair value. We've actually held up decently compared to most juiors (though not great for those who have had major catalysts... which we're still waiting on).

              1. Replying to @JayJ

                "I think that the BFS will result in an increase, but not one that would go over what Teck may offer."

                Yes

                But unless the BFS is released, that is something we will never know

                Why, IMO, it is vital that the BFS see's daylight

                Otherwise, Teck totally calls the shots

                Unless we see more than $3.50 from Teck, without the BFS, I for one will be considring what my recourse is

                1. Replying to @Metacomet

                  I think it must be released. Legally speaking. How can anyone vote on a price without the BFS. I know the vote is all EE but doesn't he need to see the document?
                  1. Replying to @ToddJ777

                    I'm sure that the BFS can remain hidden for a high enough price. This "high enough price" would be under a lot of scrutiny so Copper Fox management would consult with the experts before making any decisions.

                    Here's a couple examples showing how the experts get involved:

                    Abacus Appoints Stifel Nicolaus Canada as Financial Advisor

                    "The proposed sale of Galore Creek, which we hope to conclude within 2012, is being managed by RBC Capital Markets and J.P. Morgan Securities LLC as financial advisors."

                    1. Replying to @RabidTiger

                      Good find RT

                      Sure hope that this isn't another step that our deal must go thru...

                      "As part of the strategic review, Stifel will undertake an independent evaluation of the Ajax project and the value attributable to Abacus. "

                    2. Replying to @RabidTiger

                      If this is what is going on with CUU, you'd think they could make such a statement

                      "The Company does not intend to disclose developments with respect to the progress of its strategic alternatives review process until such time as the Board of Directors approves or completes a transaction or otherwise determines that further disclosure is appropriate or required."

                      1. Replying to @Metacomet

                        Could be wrong...but the terms strategic & review usually imply a financially tough situation to be solved. Ours is a much better "problem" i.e how much will they have to pay - not how much can we salvage.

                        sb

                        1. Replying to @sydneyb

                          Not exactly the same process, but if whatever is currently underway is a process that would need to be considered by the BOD, and if the intention is to impose an information blackout during the process, I think such a notice would be the professional approach

                          We have not been advised of the staus of the BFS, whether Teck has it, whether we are in talks with Teck, whether it has been completed, nothing..

                          Why should we have to guess what is happening?

                          1. Replying to @Metacomet

                            On the same page as u Metacomet....

                            One & only one valid/ legal reason for keeping us in the dark is for greater sh reward or benefit. Here's to a speedy & lucrative liquidity event.

                            sb

                          2. Replying to @Metacomet

                            Why should we have to guess what is happening?

                            Because this is a smallcap stock that does not have all information available at all times, and releases information based on legality opposed to trying to get the market to notice since it does not need to get funding from the market and instead can get it internally (EE) - one of the risks associated with small caps in general, and this stock in particular for the second one.

                            The signing of an NDA which has been discussed - which may possibly be limited to 60 or 90 days (relatively standard), in which case we should hear something very soon or at the least at the very start of next year if they just couldn't speak right now (assuming end of Summer/September it was signed).

                            I've heard (unverified) that Elmer plans on going on Vacation after the 26th? If that's the case, then we should IMO, hear something sooner rather than later especially if he won't be around to field calls while on vacation later on.

                            1. Replying to @JayJ

                              News that Elmer is going out on vacation is the surest sign yet that the buyout is approaching;afterall it costs a pretty penny these days to go on vacations.

                              Lol ha.....ha....ha.....ha

                                1. Replying to @cranecrane

                                  "Can you elaborate? Where did you hear Elmer is going on vacation?"

                                  JJ said he heard he is PLANNING to go on vacation on the 26th; I presume it's Dec 26, 2012. So he is still around. Many people will be taking a week or two off during X'mas and New Year anyway, so it's nothing unusual. Most of us have been waiting and waiting and hoping that the liquidity event would happen before then anyway.

                                  It has been more than two months after the end of summer, the long expected BFS release date. If they still need weeks to do whatever they have to do before they wrap up the deal, a NR should be made to inform the shareholders of what is going on (of course, in a way not to jeopardise any deal they are negotiating, if that is the case)! That is something I believe a responsible management should do! JMO

        2. So following my suppositions, a logical conclusion is that the BFS is being held, at Teck's behest because they do not want to sign over the Liard shares

          Those percentage calculations of what those shares represent was never obvious to me

          Chappy or Prospekt, anyone actually, do you have an understanding of exactly what part of the Schaft Creek project, subject to the Salazar Agreement is represented by the total Liard interest?

          That may be why the BFS is being held back

          But it is still a favor to Teck that is not in our interest at this point

          The shares are trading near a buck, and I resent being in the red to this extent so Teck can squirm over what they want to do

          1. Here's the quote from Mike Smith about the shares after feasibility:

            "Upon completion of the feasibility Study Copper Fox will have a 100% working interest in Schaft Creek and an overall 93.4 interest. The remaining 6.6% interest is held as a Net Profits Interest by Liard Copper Mines Ltd. We calculate this NPI does not participate in the project revenue until years 10/11 after production. Thus, should Teck elect for a 75% earn back, then for the first 10 years revenue is split 75%/25% between Teck and Copper Fox and subsequently 70.5 Teck and 23.35% Copper Fox."

            I don't think that Teck is concerned at alll with transferring the Liard shares in particular. I don't follow that logic at all, the shares can just as easily be transferred back.

            They have a much bigger problem staring them in the face after feasibilty: they have to arrange the project financing if they opt for 75%. To do so they need a rock-solid feasibility. Even if they buy us out completely they still need that financing and would use the feasibility we produce.

            In a sense they are buying the feasibility. The minerals in the ground are worthless (or very little speculative money) without that feasibility proving they can be mined profitably. The feasibility proves to their investors and their financiers that there is a mineable project.

            Given that, it makes sense that they perform a rigorous due diligence before they buy it. The upside to us is that once they approve it, everything else falls into place because we have our saleable project. Then Teck has their once-only decision to make, and it is beginning to look like they might be contemplating making an offer for the whole BC claims. The more stringent review of the feasibility, the more interest they must have in the project.

              1. Replying to @skyaki

                Prospekt - A great explanation of the Liard shares. Clear and concise. Thank you

                You're welcome, but they were Mike Smith's words not mine.

                What I should add is that we own 1.5% of Liard shares on our own independent of the Teck Agreement shares that are up for grabs. If Teck were to buy us out they would have to buy that portion for whatever market value of 1.5% of the indirect interest interest in Schaft Creek would amount to. Probably that would be quite a lot of money over the years.

                1. Replying to @Prospekt

                  . The Liard shares are more Valuable than many imagine,I wonder how It all came about in the inital deal? Maybe we will get a cash out plus a royalty for 20+ years

            1. Replying to @Prospekt

              "Upon completion of the feasibility Study Copper Fox will have a 100% working interest in Schaft Creek and an overall 93.4% interest. The remaining 6.6% interest is held as a Net Profits Interest by Liard Copper Mines Ltd. We calculate this NPI does not participate in the project revenue until years 10/11 after production. Thus, should Teck elect for a 75% earn back, then for the first 10 years revenue is split 75%/25% between Teck and Copper Fox and subsequently 70.5 Teck and 23.35% Copper Fox."

              Riskkee

              Reply in Copper Fox Metals Inc.

              "17.5 + 6.33 = 23.8 I haven't made an allowance for royal gold's 3.5% net smelter return, but I assume that would reduce us to 23.35% of the mine." I'm getting 24.95% not 23.8% 70% + 23.4% = 93.4% 93.4% - 75% = 23.35% 23.35% + 1.6% = 24.95%

    1. Thanks Jay. Very good post. Insiders know the facts. Those who post on this board are not insiders. So let the facts emerge when they are official. We all want positive news soon. I have had money tied up for almost 2 years and would like to believe I made a good decision buying CUU. This far in the game it's too late to sell. I will hold till the end. We can see the land of Oz on the horizon. Just need to get through the poppy fields. GLTA UET
  2. very thorough JJ - thanks.

    I've been searching back through some previous postings on why some persons think its a done deal that Teck will be buying out CUU - and i recall some very good points covered, and thinking you were one of them; so would appreciate your comments again.

    i know Teck Highland Valley has been rumoured by some as a possible link for resources to supply CUU if Teck were to buy, but though they arent commiting to any large capital expenditures at Highland Valley in 2013, they have done major upgrading to extend the life of the mine for considerable years.

    glta

    cheers

    jaf