Skip to content
Sign in

Post

Copper Fox Metals Inc.

You’re reading JayJ’s reply in this thread.Jump to it

Treasurer3.1 rating from 49 members708 ptsRate

Gave his word? NR

Liddy posted this "Good news is: Elmer gave his WORD that NR will be out BEFORE CHRISTMAS." Vette backed it up. That is the only shread of hope we have that this doesn't go on and on and on. DEC 25 is close. GLTA UET

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. Elmer also said that the feasibility study is "well on schedule to meet the revised target date of mid to late summer 2012" in his letter to shareholders. I don't want his word, I want actual results.

    1. When you look at all timelines given, it makes this whole stock look like a scam really. I must say its the low sp that got a lot of shareholders tied here. Not sure much people would still wander around if the sp would have standed still around 2 bucks!!!

      1. At this point, give me 3$ per share today, all in loonies, dumped in my parking lot and I will roll them and take them to the bank with a smile on my face...

      2. People are getting impatient; although with good reason it's an emotional reaction and we should all (myself included) try to control our emotions. Venting on the board makes us feel better, but it ends up getting others riled up. The same goes when we go into a circle of optimism when we give eachother dates for a release. Although I don't think we should censor either of them, we do need to take a step back and look at the big picture. Unless there's going to be an action in response to our feelings (selling, calling management, getting legal advice etc.) then the added stress is just that - unneccesary stress that doesn't change life outcomes directly. It's the holidays and we should enjoy them instead of fretting - if we're going to fret we should take some sort action, not just keep getting anxious.

        Take a step back and ask yourself only questions that you can answer for yourself:

        Do you still believe in the deposit? (Metals are there, they can be economically retrieved, there won't be political or social or environmental factors to stop this from becoming a mine)

        Do you still believe in management? (That they have the qualifications and experience to get things done right and prevent any problems with this becoming a mine and sell it to someone who wants to mine it)

        If you answered yes to both, then just relax. If you have reservations (PFS numbers may be inaccurate, CAPEX may be too high and not offset by improvements and increased metal prices, We may have legal problems because of the Teck agreement or whatever pops into your mind that you can't resolve) then take some action to relieve the stress you're feeling - and that action depends on what your issues are and how strong they are.

        If your issues are just on the time, there's nothing you can do, nothing Elmer can probably do to force people to sign something so stressing doesn't accomplish anything. If you can't alter behavior to reduce stress, you need to alter cognition to reduce stress. Just accept it and try to relax and enjoy the holidays.

        1. I think you mean "patience PRECEEDS profits." However, my answer to your questions begins with a question. i wonder if Vette asked Elmer if there is some sort of substantive problem any of these engineers have that is keeping them from signing? If not, why havent they all just overnighted their signatures back by now? I havent lost faith yet but I am a bit confused. Rip
        2. Well done , JayJ , finally someone that can read between the lines and pose a sensible and credible explanation for the delays. I've suspected this since the last AG meeting

          Quote from JayJ's previous post:

          We may have legal problems because of the Teck agreement or whatever pops into your mind that you can't resolve

          Why, in my opinion do I think this is a possible. Before the last AG meeting I asked via pm to someone attending if they could ask Elmer in private if the 4 year clause was clad in stone. After the AG he or she pm'd me back with the answer that Elmer gave.

          There is only one person on this board that can substantiate this and that is the person who asked at the meeting and whether they choose to is up to them.

          I will not give the answer because it would only be hearsay . I have no doubt that my post will be attacked as blasphemy but I don't care because a respected poster , JayJ , has raised the possibility , so try and discuss it rationally.

          I have also discussed this with Webgogs and maybe he will weigh in with his opinion.

          Wouldn't mind hearing from CuuVette as well .

          If this post gets deleted I will know that there is absolutely no objectivity left on this board.

          I am long and will gladly post my holdings in my margin , tfsa , and rrsp if anyone thinks I am trying to stir the pot.

          I've wanted this out on the board for discussion for a long time and now that JayJ has raised the subject , lets see if we can have an honest debate considering that no one has seen this agreement let alone how it can or cannot be interpretted.

          1. Law is like the 3 blind men feeling the elephant except the are politicians not wise men. We are agreeing with Teck over the meaning of the clauses right now. Without agreement they could fight over meanings. We are in this to cooperate. So is Teck. So no clause is absolute in a framework that spans 1/2 a century.

            I've brought up Mess Creek a number of times. It is the way in and it may have minerals under it. It is part of the Area of Inclusion. We must get a fair price for it. What is it worth? Because it's the road in its cost effects the BFS. If we retain it Teck has to pay for access. If they own it a portion of the cost goes into the BFS. They must finalize this to move on. And so, there are lots of little details like this to hash out. Better to have it in stone tomorrow that on paper today.

            1. Replying to @webgogs

              Sorry webgogs , but i'm not in total agreement with you. The BFS was supposedly done at the end of Sept. with Teck's man overseeing the process. All the little details you speak of should have been taken care during the process leading up to it's completion.

              We are now three months into the review and I find it unacceptable that management has not uttered a peep.

              This whole deal hinges on the interpretation of the agreement and if {hypothetically] Teck has decided to play hardball ,what prevents them from a legal challenge , backing in for 75% with no constraints on building within 4 years.

              That would leave CUU with 25% which nobody would touch if Teck decided to put this project on the backburner for years if they so wish.

              Convince me that this is not possible and I will drop my concerns.

              1. Replying to @serafin

                Challenges as to the interpretation of the agreement have been discussed before. Would seam as if the Elmer hedge is a cautious approach to mitigation of the potential pitfalls.

                Tossing back wiffle balls maybe better than playing on the sandlot diamond even if we have home field advantage right now.

              2. Replying to @serafin

                That would leave CUU with 25% which nobody would touch if Teck decided to put this project on the backburner for years if they so wish.

                They can't put this on the backburner because they have an option to get it back but they don't just get it back because they declare it or show their intention. We're in charge and own it (and Teck doesn't own any) until they've earned their position back from us. That is.. they can't put it on the backburner because it's not theirs until they spend a certain amount REGARDLESS of the 4 year clause. See below:

                Option Agreement: Pursuant to a 2002 Option Agreement with Teck, Copper Fox has acquired a 100% working interest in the Schaft Creek Project (subject to a 3.5% net profits interest held by Royal Gold, Inc., a 30% carried interest held by Liard Copper and an earn back option held by Teck Resources Limited ("Teck") Under the terms of the 2002 option agreement with Teck, Copper Fox can earn their 78% interest, or 23.4 % of the deposit, by completing a "positive" Feasibility Study. Pursuant to the Option Agreement, Teck may at any time elect to exercise its earn-back rights, on receipt of a Positive Bankable Feasibility Study, a defined term in the Option Agreement, Teck has 120 days in which to elect to either: i) exercise one of its earn-back options, or ii) retain a 1% net smelter return royalty, or iii) receive shares of Copper Fox to a value of $1,000,000. If Teck elects to exercise its earn-back option pursuant to the Option Agreement, then Teck has the right to elect to acquire either a 20%, a 40% or a 75% working interest in the Schaft Creek Project from Copper Fox by solely funding subsequent expenditures equal to either 100%, 300% or 400% of Copper Fox's prior expenditures pursuant to the Option Agreement. In the event Teck elects to earn-back a 75% working interest in the Schaft Creek Project, Teck will also be responsible for arranging Copper Fox's share of project financing and will recover the project financing funds from Copper Fox's share of metal sales until payout is reached.

                Earn BACK option. They don't have anything until they get it back...via spending the money and building the mine. At current, they're spending about 320million in construction before getting anything back, and we have control from what I understand up until that point.

                1. Replying to @JayJ

                  Earn BACK option. They don't have anything until they get it back...via spending the money and building the mine. At current, they're spending about 320million in construction before getting anything back, and we have control from what I understand up until that point.

                  They also have to arrange the project financing in order to earn their 75%. They can't arrange the financing for a project that is mothballed. Also they have to establish a joint venture once the earn-back is complete and continue to spend their share of expenses or they will experience a dilution of their ownership if the other owner continues to pay. So if our 25% were bought by someone like BHP, they could opt to continue the process and if Teck chooses not to participate their ownership will dilute until eventually they will revert to a Net Profits Royalty. (There is a management committee that has to make the decision to build.)

                  There are 10 underlying agreements to this contract that we haven't been able to read. All varying between Liard, Hecla, Paramount and Teck.

                  1. Replying to @Prospekt

                    These are points that we have rehashed over and over again. They are reasons why CUU is such a compelling story. It's a junior company that has shrewdly positioned itself to be able to dictate a number of key terms to Goliath (Teck).

                    That's partly what makes the waiting so difficult, in addition to the complete lack of communication. Either Teck plays nice and gives EE a handsome premium or EE plays his cards in a way that leaves Teck in a bad spot.

                    So get that damn 120-day clock ticking!

                  2. Replying to @Prospekt

                    I guess I could have worded my post better so I apologize for that. My concern was after they earn back their share, say 75% or 320M, if they could mount a legal challenge of building the mine in 4 years.

                    320M is nothing to reacquire a 75% share of this property and if the BFS wasn't nearly three months into review I doubt that the subject would be being discussed .

                    Remember also that I am not the one that brought up the possibility of legal problems with the agreement.

                    I also had third party reply that was asked of Elmer Stewart at the AG and the reply that was pm'd to me.

                    I'm glad that we were able to discuss this in a civilized manner and I will be only be too happy to be proven wrong tomorrow morning.

                    This was my opinion only and thank you for allowing me the opportunity with out deleting my post.

  2. "Good news is: Elmer gave his WORD that NR will be out BEFORE CHRISTMAS." Vette backed it up. That is the only shread of hope we have that this doesn't go on and on and on. DEC 25 is close.

    Today is the last day. Possible news either during the day or at the close. Was hoping to see news in my inbox this morning, but nothing. Fingers crossed.

      1. I couldn't imagine them releasing big news on Christmas Eve - a shortened trading day. Trading cutoff on the 24th is 1pm EST I believe.

          1. Technically they can do a NR any day of the week, even Sunday. But reality pretty well dictates that today is the last day before Christmas! If they haven't got the BFS all signed and readied for NR, they are not going to bend backwards just to make the retails happy - that has not been their concern so far, and the only SH that matters doesn't care about NR's; he has the inside story! That's sad but reality! We'll have to make it a Merry X'mas even without the BFS! JMO

    1. Why someone does not call the Office for more information? I would do well, but my English is not good enough. Thank you.