I think this is a done deal and I point to a particular line in the NR
5 years pre-production period followed with a productive mine life of 21 years;
I believe this is one of the little details that had to be ironed out.I think CUU has agreed to some flexibility to allow Teck an improved time frame for building the mine otherwise why is it now 5 years instead of 4.
This is my opinion only but sure looks like all that is left is a formal offer.
Is it possible that the BFS has been deliberately kept muted in order to keep Teck away thereby fox getting to keep the whole thing; with the real value to be revealed at the opportune time?
No insinuation, just a wild speculation!
The time frame is built into the contract for Teck to back in at 75%. The BFS is a separate document and has nothing to do with that. It seems like a realistic timeline.