I've been trying to understand where this feasibility leaves us. These are some of the thoughts that I'm having, with apologies if they have already been mentioned.

1. If Teck wants to buy out our share of the project (let's call it the 25%) then they have to do so within the 120 day period, possibly 60 days, probably 30 days. On the other hand, we don't have to sell at all if we don't like the price.

If we get a low price based on this feasibility we could hold onto our share and put in 10 drill holes and prove up that remaining 171.16 million tonnes of inferred resource. We could work on the other things the feasibility recommends such as increasing the metal recovery and increasing throughput.

(On this topic of throughput, it is engineered to expand to 180,000 tpd which was an added cost up front but will be much cheaper if it is done that way rather than in a few years after production. They have taken all the steps necessary to show a major producer that this is turnkey, for example getting the Hydro.)

If Teck opts for the 75% but won't pay us a good price, then we get a free ride while Teck pays $1.2 billion to carry this through to production. That would make our 25% value much higher than it is right now, and we can sell it to someone else along the way.

Teck has probably made a much better feasibility than we could, and would be more comfortable looking at the ROV at 5% rather than the threshold that the contract specified of NPV at 8%.They might also reasonably believe that the price of copper in 7 years is going to be much higher than this feasibility will show.

So if Teck wants in at all they likely want everything and can be expected to pay a reasonable amount. If they come in for anything, even if not 100%, it will validate the project and our share will be worth more, plus they can pay for the drills to improve the resource.

2. If Teck walks away then we know it is worth at least $531 million. We also know we own it 100% at that point. We could then sell it, or do a bit of work to prove up the inferred and the other feasibility recommendations.

We would have to wait another year probably but we could get the environmental application going. (BTW I believe this has been delayed substantially by the two extra FN groups that won the right to be involved because of the road out to the Port. Shane told me not too long ago that he didn't think it would be a problem, but it would add a lot more work.)

Summary: So I guess it is worth at least $531 million because if we don't get offered at least $1.26 per share (I think it works out to) then we are better off holding onto the project and not selling. Teck can't force us to sell, they can only walk away and then we're still worth $531 million.

In terms of Monday, then it doesn't make sense to sell for less than $1.26 because Teck will come to some sort of decision probably by the end of January. Either way we shouldn't eventually go for less than that and the upside is quite big.

Now, I have to get back to my guests!

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. We can always count on you for some interesting insights, Prospekt. I wonder if your guests could sense your distraction and see the cogs turning in your head until you finally sat down to type out that post? ;)

    Ultimately I hope you are right. If Teck tries to lowball EE, I sincerely wish for him to tell Don Lindsay to take a walk and then send the heavy equipment back out to Schaft Creek for an extensive drilling campaign in 2013. And yes, advance the environmental assessment further while we're at it.

    The question is not whether EE has the financial resources to do this, it's more a matter of whether he's willing to wait another year for a bigger return, providing the drill cores bear out what we're all expecting. We'd all be be forced to choose to wait along with him, of course, either that or bail out.

    I, for one, would hunker down for the long haul if it means we could actually realize $5 a share or better down the road.

  2. I'll add to Prospeck's numbers and the numbers I gave out previously.

    Just the value in the 4x expenditures if Teck wants 75% = 4x89 million (as of July)

    89 million we know comes back to CUU, just that is worth 22 cents on the sp.

    The other 267 million must be spent by Teck during the construction.

    You don't see that in the Feasibility do you. Putting that much money on the project brings the total value of our 25% up.

    So add 22 cents to all the numbers I gave out previously.

  3. Prospect - well said! My sentiments exactly - we own 100% until Teck says otherwise. If Teck backs in, it's a whole new ball game.

    If Teck walks, our the floor is the $531M NPV. Shotgun!

    Now the excitement begins!

    PS, I wish folks would stop trying to rationalize NPV5, mining is a risky business - don't let anyone tell you earning 5% is appropriate for the risk / reward for this!

    1. Lol....the so called bashers can rationalize BASE CASE 8% no inferred NPV all they want.

      None of them have or are able to explain why 18% of the Quellaveco deposit sold for 980 million. And that's why I keep bringing it up, and I'll keep doing it. Nobody can bash that lol.

      Explain ?? Get me some numbers. They can't.

      That offer was in Feb 2012..their Capex was over 3 Billion in 2010!!

      They're in Peru, big water issues

      Their M&I = 823.8 Mt @0.44Cu = 3.68 Bil pounds copper. Their Inferred is 183 Million tonnes. Was that inferred considered waste rock ?

      Did Mitsubishi even care when they bought 18% of 980 million ?

      Show me the NPV...nobody can. Only the Majors see or think that far and they act on it, in this case they fought over it.

      Same deal for our 25%, bare bone, is $3.13.

      1. Vette - I can understand comparative value or recent transaction multiples so yes please quote those because that is rational - what others are paying for similar properties.

        But please only the truly ignorant (STUPID) will believe an NPV5! Why would anyone be satisfied with earning 5% on a risky business like mining???

        1. This isn't a peruvian mine relying on water that 3 towns need. It also doesn't need 30 miles of convayer system. I could go on. Have you read up on that one?

  4. Lol, they didn't win the right, we invited them because there's a bigger picture down the road where they would be involved anyway. tsk tsk.

    1. Lol, they didn't win the right, we invited them because there's a bigger picture down the road where they would be involved anyway. tsk tsk.

      We didn't invite them. The Gitxsan Nation and Gitanyow Nation, and Nisga's Nation petitioned the government for inclusion in the environmental application process for Schaft Creek. In August 2012 they were granted an Order under section 13 of the Environmental Assessment Act that amended the Order dated 2010. This covers the territory that is under the roads between Schaft Creek and Highway 37 and Highway 16, and possibly others. This order established a transportation working group with these three FN groups.

      As I said, Shane told me it would be a lot of extra work, but essentially not a problem. I am assuming this is what has caused the environmental process to take longer than anticipated since they would have only found out the requirements to fulfill this order a couple of months ago.

  5. There is still risk involved in developing Schaft Creek. 2020 is pretty far out and things can swing widely. Look at the dramatic change from 2008 to now. Ultimately, I think it is difficult to value at 100% of the NPV. With that said, perhaps the ROV can be used at the end of the day.

    1. I did talk to Elmer today and he said if Teck walks away we know we are valued at $531 million at the bare minimum. (Rationally that is a very conservative number.)

      Given that, it doesn't make sense to accept any offer from Teck for less than that per share, (even if it is for only 25%) because we could tell them to walk away and then we would have it all. So I think we can force their hand to that extent. If they don't like it, they can walk and we keep 100% and go forward to improve the optics while attempting to sell to someone else.

      So I don't think we should sell for less than that amount. The message is, don't trade on emotions.

      Really got to go.

  6. What?? Unless Schaft Creek is exempt from paying taxes. On an after-tax NPV/share basis Schaft Creek is only worth $0.16/share ($67M/422M) at $3.25/lb Cu and an 8.3% IRR. Remember Galore Creek was 7.4% IRR at $2.65/lb Cu...

    I cannot understand why the FS is such a disappointment given it's relatively low capex? Is it only because Mo prices have halved since then or did recoveries/grade change too?