I just ran some numbers on the impact the waste rock would have on the economics assuming the inferred resource is accurate (that's a big assumption).

Our 8 percent NPV would increase from $513M to approximately $1650M.

Our IRR would jump from 10 percent to around 14 or 15 percent.

The big assumption is that the waste rock is processed evenly over the life of mine. If the waste rock is processed early in the mine life, the numbers are much better. The inverse is also true. This would be a very good question for the conference call.

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. Dang it, I ran the numbers with 117M tonnes of waste rock instead of 171M tonnes. The numbers will actually be quite a bit better. I will recalculate when I get a minute.

    1. Okay I redid the numbers assuming our waste rock has value.

      Our NPV increases from $513M to $1885M.

      Our IRR increases from 10.13 percent to 14.88 percent (huge improvement).

      For those interested, the economic numbers seem to indicate first year profit of 205M followed by 20 years of 405M profit. These results seem to match our NPV and IRR numbers.

      This improves to 275M and 550M with this waste rock having value.

      1. I'm glad the halt happened on a Friday afternoon and wasn't lifted to allow some people to start their number crunching.

        RT, do these calculations make you feel better today than you were feeling yesterday? Before you did these calculations, did you take out the cost of removing the "waste"?

        I hope more people are starting to look at this in a different light.

        1. These waste numbers are comforting but it is somewhat disappointing that the feasibility results are so weak without them. Spending $4496M to recover $67M (after tax NPV 8) is not going to help our share price. I wiill feel a lot better when I see the actual report and can make some more educated calculations.

          Yes, I removed the cost of removing the waste. It will cost $6.56/tonne to remove the waste. If the waste has value we can process it for a cost of $13.33/tonne. Therefore it will cost an extra $6.77/tonne to process it. The waste has a value of $25.08/tonne, giving us an extra profit of $18.31/tonne for 171.2M tonnes of waste.

  2. "If the waste rock is processed early in the mine life, the numbers are much better."

    That is very accurate since they haven't even tested full depth of the starter pit. The grades get much better the deeper we go.