Skip to content
Sign in

Post

Copper Fox Metals Inc.

You’re reading Metacomet’s reply in this thread.Jump to it

Mail Room2.2 rating from 40 members150 ptsRate

Inferred Valuation

Has anyone else done a valuation post-BFS that includes value for the inferred? The best I can find is this:

http://agoracom.com/ir/CopperFoxMetals/forums/discussion/topics/558412-copper-fox-feasibility-measured-vs-inferred-vs-reality/?message_id=1757409#message_1757409

Here is my preliminary back of the envelope valuation. I have taken the BFS valuation and added the incremental value from processing 100% of the inferred resource currently mined in the BFS but considered waste.

The valuation below assumes the 171Mt is processed at the end of the mine life (adds ~3.5yrs at 130ktpd) and does not increase capex or change the BFS' first 21 years in the mine plan. This assumption seems somewhat logical given the inferred resources' grade (lower than P&P) and location (below most of the P&P). However, if the inferred is converted to ore from waste there is the opportunity to increase capacity and modify the mine plan.

Two cases are presented for valuing the inferred. The high case shows the incremental value of processing all the inferred without any discounting or changes in capex. The low case discounts the 3.5 years of additional mine life at 8% at the end of the BFS mine life - mining costs are not double counted.

Inferred Valuation:

  • Using the same recoveries and prices as the P&P a tonne of inferred is worth $22.65/tonne (assume ~90% payable similar to the BFS)
  • Since the ore is already mined and the cost is included in the BFS the incremental operating cost is only $6.77/tonne
  • The operating profit per tonne of inferred (net taxes) is $10.32/tonne or $1.77B for 100% of the 171Mt inferred resource

CUU Valuation:

High Case 100% 24% $/share
BFS NPV @8% $67M $16M 0.04
Inferred (in-pit) undiscounted $1,488M $357M 0.85
Total $1,555M $373M 0.88
Low Case 100% 24% $/share
BFS NPV @8% $67M $16M 0.04
Inferred (in-pit) Est. NPV @8% $201M $48M 0.11
Total $268M $64M 0.15

All numbers are after-tax. Per share numbers assume 24% interest and 422M shares outstanding.

The high case is unrealistic since the 171Mt cannot be processed immediately and shows the maximum value of the inferred. The low case is much more realistic but too conservative since there is an opportunity to increase capacity or delay mining costs until the ore is ready to be processed.

Any other thoughts on how to value the inferred?

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. Miningguy,

    Good of you to tackle a significant unknown and referencing my attempt at valuing the inferred resource. I believe that this has a significant impact from our PFS NPV of $2.8B to the BFS NPV of $513M.

    However I'm not following how your low case scenario is so low.

    If you refer to the PFS summary: http://www.copperfoxmetals.com/s/NewsReleases.asp?ReportID=319027&_Type=News-Releases&_Title=Copper-Fox-Metals-Announces-Positive-Results-of-Preliminary-Feasibility-Stu...

    "The revenue generated by all the by-products covers all operating costs and adds a credit of (US) $0.32 /lb of copper produced to the revenue stream. Thus, a negative operating cost for copper is estimated;"

    Further below the summary: "For the base case, recoverable rock value per tonne is US $31.47 and cash operating costs are US $12.49 per tonne. The PFS confirms the viability of Schaft Creek and highlights the advantages of the project including: location, comparatively low capital expenditure requirements and operating costs and high metal recoveries."

    It's been 4 years so I'm not sure whether the $31.47 value per tonne is still reasonable. Let's assume it is, undiscounted NPV value increase in the categorized 'waste' would be: 171,160,000 inferred resource tonnes X $31.47 value per tonne X 24% CUU share w/ Teck back in = $1.293 billion. After tax per share would be: $1.293 billion X 0.75 after tax value (10% BC, 15% Federal) / 398M shares = $2.44 / share

    I agree that the timing of the extraction will impact NPV but I would guestimate worst case scenario over 20 years to be around 50 cents. Hence my estimated 60 cent conservative valuation.

    Perhaps you used another assumption but IMHO, the best credible assumption is using the PFS and the BFS has no indication on value. Your high case scenario is pretty close to my low case scenario.

    Miningguy - if you believe your calculations are correct, then how would you explain the difference between the PFS and BFS NPV's? IMO, the above calculation explains most of the difference, but I'm not a geophysicist, maybe there's another elephant in the room.

    As Vette has recently indicated, this is only the inferred resource needed to be removed to get to the M & I resource. It appears we have 3-4 times more inferred resource beyond this, which again creates a lot of potential in Schaft Creek. Thanks Vette for pointing that out. I'm not sure how much value Teck will place on potential but as I had mentioned, it needs to be enough for the CUU insiders to vote in favor of a buyout.

    1. This is post by Miningguy I replied to - not sure if people are referring to this message being pulled or not:

      Inferred Valuation

      posted on Dec 27, 12 09:08PMUse the IP Check tool[?]

      Has anyone else done a valuation post-BFS that includes value for the inferred? The best I can find is this:

      http://agoracom.com/ir/CopperFoxMetals/forums/discussion/topics/558412-copper-fox-feasibility-measured-vs-inferred-vs-reality/?message_id=1757409#message_1757409

      Here is my preliminary back of the envelope valuation. I have taken the BFS valuation and added the incremental value from processing 100% of the inferred resource currently mined in the BFS but considered waste.

      The valuation below assumes the 171Mt is processed at the end of the mine life (adds ~3.5yrs at 130ktpd) and does not increase capex or change the BFS' first 21 years in the mine plan. This assumption seems somewhat logical given the inferred resources' grade (lower than P&P) and location (below most of the P&P). However, if the inferred is converted to ore from waste there is the opportunity to increase capacity and modify the mine plan.

      Two cases are presented for valuing the inferred. The high case shows the incremental value of processing all the inferred without any discounting or changes in capex. The low case discounts the 3.5 years of additional mine life at 8% at the end of the BFS mine life - mining costs are not double counted.

      Inferred Valuation:

      • Using the same recoveries and prices as the P&P a tonne of inferred is worth $22.65/tonne (assume ~90% payable similar to the BFS)
      • Since the ore is already mined and the cost is included in the BFS the incremental operating cost is only $6.77/tonne
      • The operating profit per tonne of inferred (net taxes) is $10.32/tonne or $1.77B for 100% of the 171Mt inferred resource

      CUU Valuation:

      High Case 100% 24% $/share
      BFS NPV @8% $67M $16M 0.04
      Inferred (in-pit) undiscounted $1,488M $357M 0.85
      Total $1,555M $373M 0.88
      Low Case 100% 24% $/share
      BFS NPV @8% $67M $16M 0.04
      Inferred (in-pit) Est. NPV @8% $201M $48M 0.11
      Total $268M $64M 0.15

      All numbers are after-tax. Per share numbers assume 24% interest and 422M shares outstanding.

      The high case is unrealistic since the 171Mt cannot be processed immediately and shows the maximum value of the inferred. The low case is much more realistic but too conservative since there is an opportunity to increase capacity or delay mining costs until the ore is ready to be processed.

      Any other thoughts on how to value the inferred?

        1. No worries Metacomet. Note that this is only looking at the valuation of the 171M tonnes of inferred resource, not the CUU value on the M&I resource, the Liard shares, land, and other potential in Schaft Creek. My assumptions may not be accurate, but I believe this is the reason why the BFS NPV came out relatively low.

          1. Thanks again

            I think maybe Mining guy is new here and gave us a pretty good cut at the data in the BFS as he saw it

            Hope that's the case, cause if he's on our side he seems pretty sharp

      1. Thank you for taking the time to do some math, i had a quick review of your numbers and i will object to your evaluation To start when I look at the final evaluation from the numbers I see you took the 24% (cuu value) and divided it by the outstanding share count. This evaluation is incorrect to start. Cuu owns 100% of today's present value. Tck may buy the 100%or if they choose Tck may back in they pay cuu 4 times the cost (our money) to bring the project to an affordable bfs and assume 75% control of the mine, let alone absorb the operating costs. You have taken the operating costs out prior to calculating the cuu value, in turn your evaluation in my opinion is incorrect. That is only good when evaluating the full cost. Second keep in mind the other products from the mine will be sold to finance the mine as per the original plan. That's how the negative operating costs were first introduced. Third there is no way to estimate the after tax value. I get tax incentives and so will this project, what and how much that is why valuations are done Pre tax.. To be full frank and fair an evaluation of this mine cannot be summed up nicely on a tiny blog. Final in regards to insider activities. I will be happy not to see them buy any more. If I had their warrants I would hold and wait. Only a sell off would change my view. Last but not least, cuu has stated they have no interest in being a mining company. I have my own theories on what the next step will include, but I will reserve my opinion for the time being. I have been a victim to my posts being deleted
        1. You are completely right on the first point. On the per share basis I am assuming Teck backs in for 75% but I forgot to add value this back-in obligation provides CUU. The way I see the back-in right is CUU paid ~$80M so far and Teck would need to pay ~$320M before CUU is obligated to pay its 24% of the capex. Since this happens in the first years I assume this is $80M (undiscounted) in value ontop of the BFS' NPV.

          High Case 100% 24% $/share
          SC- FS NPV @8% $67M $16M 0.04
          Teck's Back-In undiscounted $80M 0.19
          Inferred undiscounted $1,488M $357M 0.85
          Total $1,555M $453M 1.07
          Low Case 100% 24% $/share
          SC - FS NPV @8% $67M $16M 0.04
          Teck's Back-In undiscounted $80M 0.19
          Inferred Est. @8% $201M $48M 0.11
          Total $268M $144M 0.34

          On the second point I take into account the other metals. Au/Ag/Mo make up almost half the value ($9.66/t of the $25.17/t).

          On the third point you have to include taxes. BFS includes taxes (Fed/Prov/Mining tax) as do all BFS and adjust for depreciation, tax incentives...

    2. mypalcal,

      For your first question the value per tonne I use uses the recoveries, prices, and inferred resource grade used in the BFS which is $25.17/tonne - however it looks like only 90% of this is payable in the BFS (i.e. smelter/refining charges which probably vary by metal).

      The main difference I find is moly prices are half what they were in the PFS, recoveries are different and total capex is higher - although I don't think the capex creep was a large issue. I am also a little confused by why the economics are so different from the PFS but I will wait until they file the BFS on sedar before I really compare the two.

      Aside from that I am just using the BFS value (after-tax NPV of $67M) and adding some discounted (or undiscounted) value for the inferred.

      Also you cannot do 171Mt x $31.4/t (revenue) x 24% and adjust for taxes and discounting. You need to deduct operating costs/G&A of processing these 171Mt - the mining costs are already sunk and included in the BFS.

      1. I have been scratching my head on valuation because it is not a straight forward calculation.

        Everything changes for the better with the Inferred calculated as resource. It is more of a curve then a straight line and it is impossible to calculate without modelling due to the variable of time.

        It effects, strip ratio, payback period, Initial rate of return (all because of the time and effort required to mine and haul waste verses mining and hauling ore).

        The 25.17 tonne number becomes invalid as that cost wiill go down with less waste (I don't know how much). It changes everything.

        CUU share price is getting crushed right now because the only number anyone can find to put a value on the pit is far lower then anyone expected. It was a scary surprise in a frightened market, not a very winning combination.

        So now we retail investors are sitting here trying to come up with a number that we can't fathom, and we are likley going to languish like this until Teck makes a determination. Teck can and will do the calculation, then they will look at our share price and offer us a 60% premium (or some such thing). They will not give us anything, nor should they. On the flip side, we don't need to take their offer if it is too low. The Chinese would love to own, and pay dearly for, a copper producer like Schaft Creek.

        Don't trust to hope. The maket is irrational and merciless. CUU could still be a $6.00 stock but if institutional investors get frightened the way retail did, it could travel to .40 as well.

        Hopefully the bottom is hit now as time is our friend. Every day the project gets closer to production, every day the project becomes more valuable not less.

        1. One last thing I keep seeing is people are calculating the value of Scaft Creek at 24% (which I understand as everyone is trying to eliminate value for Teck ownership) but Teck owns nothing of Schaft Creek last I checked.

          So according to everyone doing NPV calculations we had better hope that Teck walks because following that logic CUU will be an instant 4 bagger the moment Teck goes.

          Schaft Creek is seriously de-risked at this point, the EA cert would have been nice but unfortunately there is an exhastive complicated and inefficient beaucracy that doesn't allow the smooth transfer of information in B.C.

          The value of the project is not in the NPV of a the mine, it really is in being able to start a mine in the district.

          If you need to try and put a value on the mine to the shares try figuring out what eps will be for CUU from the project (including liard shares) then discount it for risk and multiply that by between 8 and 10 and you should get an idea of what the value of the project is worth to the share price of CUU. I have not worked out the numbers in this manner as I am holding my shares till the end.

        2. Stop scratching your head. These are the only numbers that matter.

          Using the base case and the RE insitu is unbeliveable.

          10.6 million oz gold, 1,445.00

          98.3 million oz silver, 27.74

          10 billion lbs copper, 3.25

          700 million lbs molybdenum, 14.64

          Insitu value is a mere $60,878,992,969 or $140.60/sh fully diluted.

  2. Your take on this is incredibly negative

    If accurate, we are cetainly in for some tremendous disappontment

    It would also explain a lot of the market and perhaps insider behaviour since the BFS

    I am not prepared to take on your calculations

    Would appreciate any of you more familiar with these type of analytics who might have a different take to make it known

    If this is simply a more sophisticated form of bashing, I'm impressed

    ..otherwise, maybe we should all be heading for the door

    1. Sorry can't answer that someone pulled the trigger and deleted the post, I would have liked to see what you are talking about.
      1. This is a problem

        Whoever deleted that post better have a pretty good notion that the data was inaccurate

        It does not serrve our interests to have solidly constructed arguments deleted for no reason other than an aversioon to the truth

        Whoever yanked it owes us a reason for why such action was taken

        Obviously several of you saw that exercise

        If it was valid, I need to know it

        1. sorry all I think I just missed it.The problem is too many posts and posters being banned unless we are all on the cheering side of the coin, myself included.