VIRC
Join the conversation about Copper Fox Metals Inc.
ReplyYou’re reading Farmer71’s reply in this thread.Jump to it
Join the conversation about Copper Fox Metals Inc.
ReplyThanks for the update JA. Just left the convention myself and had a very nice conversation with both MS and ES. Very nice gentleman and easy to talk with. I encourage anyone to talk with either one. Some additional details I will add here about what they said. Yes, they were hoping to deliver the final FS to Teck before the show but they are confident it will be delievered next week. I aslo asked MS whether they think Teck will drag out their decision to the full 120days and the consensus ( amoung themselves ) is probably not. Teck has a reputation of giving their answer within 30-60 days. ES also told me that Teck has everything and knows everything about the project so its not likely they would drag this out.
I aslo asked about the 171M of "waste" rock and what Teck knows about it. MS said that Teck was the one that drilled this area before the changes to the National Instrument rules came into affect. So because of drill spacing req. could not be met they could not technically classify this as an Indicated resource. But they know the grades are there and it would not take many drills holes to upgrade the resource. The depth of this resource was about 200M so it would only take 5-10 holes to upgrade it and costs less than 3M to drill this out. The important thing is Teck has all the data on it and knows its there.
We then talked about buyout value and how Majors like Teck would value our resource. ES handled this question and he told me the importance of the ROV method most companies are now using to value large deposits like ours. He gave me a good example of the Highland Valley mine Teck is still operating. If the discount method was used, it would have a zero value today after 20 years but obviously that is not real life as it is still producing and still has value. ES also mentioned that this model for value was based on several thousand real life cases and it would be the one Teck would use to value SC. As far as accepting a low ball offer, it ain't going to happen. He told me Mr. EE is a very smart businessman and will be squeezing every bit he can out of this. He also told me that as a director he does have obligations to all shareholders to do so.
Then we talked about what would happen if for some reason Teck decided to walk what would be our gameplan then. MS told me that they would get a partner to do a JV with them so they wouldn't have to dilute and raise any more money. They would control 100% of the project and could afford to give away 25% to do a good drill program to upgrade the 171M tons plus do an extensive exploration program on the untested areas. Then they would hire someone to market it for them to get it sold. Their ultimate goal is to sell the property at a fair value. I asked if the "partner" was another Major but he didn't say except for that this partner would have the muscle ( capital ) to be able to do a thorough drill program.
Well anyways, that was the extent of my conversation. I feel very good that something will happen within the next 2 months.
Re: ...there was discussion that these board numbers are out of whack.
Who was having these discussions? What does that mean that these board numbers are out of whack - as I have heard anything from $1 - $7 on this board.
I'm going by memory here but at a previous Forum someone asked Elmer what they would like as a buy-out price . Elmer didn't give a set price but said they didn't want anyone left behind , which would make the buy-out price $2.75 or higher . We've got predictions from a dollar to Ten dollars or higher , where does out of wack start ?
Replying to @Lois Denominator
From everything I've studied the ROV hybrid model for our deposit is the right method.
Comparables and the discounted/NPV have to be mixed in. Then global conditions have to be accounted for. Country risk is increasing as a factor. Vertical integration is becoming the norm for companies that want to secure supply.
http://www.basinvest.ch/upload/pdf/Valuation_of_Metals_and_Mining_Companies.pdf
In general, before an extraction program can begin, Resources and Probable
Reserves must be “proven up” to the category of Proven Reserves, the most geologically
certain category. This requires additional cost - expenditure on drilling (information
gathering) at the site, which will make assets in the category of Resources and Probable
Reserves less valuable then Proven Reserves. There is a significant premium paid for
operating mines, where reserve and cost uncertainty has been reduced. According to
major gold property acquisitions during the 1990s, Proven and Probable Reserves are
valued at a 44% discount, Measured and Indicated Resources at an 83% discount, with no
value being attributed to Inferred Resources. The uncertainty surrounding the estimate of
extractable reserve is called reserve risk.
36
Mining companies may also commence production from a deposit with only a
small amount of reserves, in the hope that additional reserves will be discovered as
mining proceeds. The Dome mine, owned by Placer Dome (and now Goldcorp) is a good
example: it has now been mined continuously for 88 years and it has never had more than
about 3 years mine life. As the mine has progressed underground, more of the vein has
been opened up for mining; consequently the life of the mine has been extended.
37
"Then we talked about what would happen if for some reason Teck decided to walk what would be our gameplan then. MS told me that they would get a partner to do a JV with them so they wouldn't have to dilute and raise any more money. They would control 100% of the project and could afford to give away 25% to do a good drill program to upgrade the 171M tons plus do an extensive exploration program on the untested areas."
25% would be steep for a drilling plan. I'd want to sell off CUU and buy that company.
They would control 100% of the project and could afford to give away 25% to do a good drill program to upgrade the 171M tons plus do an extensive exploration program on the untested areas.
Wouldn't this be the same net effect of Teck opting in for 20%, or thereabouts? What they seem to be saying is that if Teck is not interested in this deal they will find someone else for the same deal.
It's a good idea, I would think. if the new partner was as good as Teck would be for our stock price. However, it seems unlikely that Teck wouldn't take this deal themselves when someone else would. I guess the question would be how much money would they commit to putting into the project to earn their 25%?
It would have to be a partner who brought billions in finance to the table to equal Tecks status. Not some Jr that was going to drill it up for us. $15 billion in assets at 6 cents a pound is way too much value for a drilling program. I'll be all over that company if we did something that stupid. There would have to be a lot more involved that just that. I would ecpect something closer to 80 million in trade.
Reading between the lines indicates our value would be based on the BFS and the pounds. That would actually drive our price up after the knee jerk reaction. The market would give us 3 cents a pound at first and everyone would be saying there was zero hope this would ever be mined. Galore 2.0 by a stupid company called Teck. I can see the headlines now. Teck would take all the blame and cuu would fall into obscurity. We might not even rate a mention in the bashing. Brent Cook would pronounce the cat dead in a triumphant tone and his effluvium would spread.
Believe it or not, this would be good for us. We'd slide under the radar while plan b was set in motion. It's true that it would take another 3 years to revitalize the deposit given TT's speed and the need for a partner with the knackers to join at the hip with us amid the swirling turgid waters. While I have much distain for TT there's also a bright side to TT. They are destroying the industry single handedly. After all, what company brags about its failures! They will take other deposits off line as they flounder and bumble their way along. We'd just be a fart under the outhouse, indestiguesable from the other nauseating emminations brought on by late and failing projects. In the mean time more pressure would build on the supply and the value of copper would go up.
In 2015 we would begin to test the financial waters. We would also court a real partner but since we gave 25% away for a drilling plan there would be a lot less interest to share. We already know roughly what to expect from the rest of the property. The maximum we can get is 4 times the resource. Yes, that's a staggering number and if only 1/2 is economical it's still a lot. I would expect the first run to begin in 2022.
Now in this fantasy variation our share price with the doubling of dilution and the give aways would still be $80. All this in just 8 years.
Replying to @Russ Reid
I understand your feelings RR, if I get any less than $3.00 I will hold the TECK.B shares I receive. At least then I get the bonus of dividends, stable and growing share price and the knowledge that once they start Shaft mine I'll get to receive some value in the future.
25% would be steep for a drilling plan. I'd want to sell off CUU and buy that company.
I should clarify this statement. The 25% figure was the example I gave. MS didn't mention any percentages to me. All he said was that they would get another JV partner with deep pockets to continue on. And they have no shortage of other interested parties from what I gather. Right now everybody is waiting for Teck to make their move. Sorry for the confusion.
"I aslo asked about the 171M of "waste" rock and what Teck knows about it. MS said that Teck was the one that drilled this area before the changes to the National Instrument rules came into affect. So because of drill spacing req. could not be met they could not technically classify this as an Indicated resource. But they know the grades are there and it would not take many drills holes to upgrade the resource. The depth of this resource was about 200M so it would only take 5-10 holes to upgrade it and costs less than 3M to drill this out. The important thing is Teck has all the data on it and knows its there.
We then talked about buyout value and how Majors like Teck would value our resource. ES handled this question and he told me the importance of the ROV method most companies are now using to value large deposits like ours. He gave me a good example of the Highland Valley mine Teck is still operating. If the discount method was used, it would have a zero value today after 20 years but obviously that is not real life as it is still producing and still has value. ES also mentioned that this model for value was based on several thousand real life cases and it would be the one Teck would use to value SC. As far as accepting a low ball offer, it ain't going to happen. He told me Mr. EE is a very smart businessman and will be squeezing every bit he can out of this. He also told me that as a director he does have obligations to all shareholders to do so."
See, this is clear as Cuban ocean water. Something like this slapped-on the NR would have surely opened up yeys and minds. You read the numbers..you say mahh...but then look at the real story.
Thanks to all with the many updates. Hope not to be too busy at work tomorrow. :-)
If the report is positive under §5.5(b)(ii) but not under §5.5(b)(i), Teck Cominco may nevertheless elect, in its sole discretion, to deem the report to be a Positive Bankable Feasibility Study.
This is the important clause because our feasibility was not positive under clause 5.5(b)(i). They are saying it is a Positive Feasibility Study; but Teck still has to decide whether it is a Positive Bankable Feasibility Study. Until we have produced a Positive Bankable Feasibility Study we haven't fulfilled our part of the Agreement and won't have earned the Liard shares.
Apparently, out of the blue, we have 30-days to wait to see if Teck accepts this study as bankable. I really thought they had agreed with Teck on the parameters and that was why there was a delay.
I think stockfriend mentioned this, that he saw it as a 30day window for teck to make an offer before giving up the liard shares... i have to agree with him... otherwise teck would of already sent us an offer... and IMO i am 99% confident that they want to make a first offer before giving up those shares.
"I think stockfriend mentioned this, that he saw it as a 30day window for teck to make an offer before giving up the liard shares... i have to agree with him... otherwise teck would of already sent us an offer... and IMO i am 99% confident that they want to make a first offer before giving up those shares."
No, Teck would not have made an Offer because they have not officially been delivered the BFS.
"...The conclusions reached in the feasibility study were arrived at by a considerable number of professionals in the mineral resource sector. ..." [per Elmer's email]
With a "considerable number of professionals in the mineral sector" involved in the preparation of the BFS, why should there even be a question whether we have a bankable positive feasibility study or not? With the amount of reviews they claimed to have gone through! Why wasn't every point addressed in the Option Agreement addressed and fulfilled in the BFS?
Teck would make an offer before getting the BFS delivered so they dont loose their liard shares. there is a good chance of that.
then that is their acknowlegement that the BFS is positive
It is positive at NPV 8%, but not at NPV 12% so it is not yet bankable as determined by the Agreement.
This means that theoretically Teck could refuse this feasibility document and ask that it be improved so that it is a positive feasibility at NPV 12%. That would take another year of drilling and dilution.
phttp://agoracom.com/ir/CopperFoxMetals/forums/discussion/topics/561357-virc/messages/1766521#message
Reply in Copper Fox Metals Inc.
If the report is positive under §5.5(b)(ii) but not under §5.5(b)(i), Teck Cominco may nevertheless elect, in its sole discretion, to deem the report to be a Positive Bankable Feasibility Study. This is the important clause because our feasibility was not positive under clause...
Point (i) 12%, is using 25,000 tpd
Point (ii) 8%, is using 50,000 tpd
Our Feasibility is using 130,000 tpd. The cost are way diferent. We are a;ready positive under (ii) and using 25,000 tpd (12%) we would also be positive since the cost would be much less.
As for the 30 days, Cathy doesn't know anything about it, she says it's included in the 120 days.
If the report is positive under §5.5(b)(i), Teck Cominco may give notice to Salazar, within 30 days of receipt of the Feasibility Notice at which production rate the report shall be considered a Positive Bankable Feasibility Study so long as the project selected has a positive NPV.
If the report is positive under §5.5(b)(i) but is not positive under §5.5(b)(ii), the report shall be considered to be a Positive Bankable Feasibility Study based on the size of project studied under §5.5(b)(i).
If the report is positive under §5.5(b)(ii) but not under §5.5(b)(i), Teck Cominco may nevertheless elect, in its sole discretion, to deem the report to be a Positive
Bankable Feasibility Study. If Teck Cominco does not give any notice as aforesaid, then any report that satisfies §5.5(b)(ii) will be considered a Positive Bankable Feasibility Study.
Point (i) 12%, is using 25,000 tpd
Point (ii) 8%, is using 50,000 tpd
Vette, are you mixing up mill input (tonnes per day), with metal production, as defined in the contract (tonnes per annum)?
Folks are missing important words in these clauses. The production rates are miniums as are the other paramaters. Note the use of "at least".
§5.5(b)
i) firstly, the report will be considered positive if it indicates that production from the Property Would, on a project basis, generate a NPV of at least $1.00 using a discount rate no less than 12% and assuming a mine life of no less than 12 years and copper rnetal production of at least 25,000 tonnes per annum;
(ii) secondiy, the report will be considered positive if it indicates thatproduction from the Property would, on a project basis, generate a NPV of at least $1.00 using a discount rate of 8% assuming a mine life of no less than 15 years andvcopper metal production of at least 50,000 Ytonnes per annum;
The LOM average is 105 Million tonnes per year so we met that minimum requirement for rate of production easily. We also met the requirement of "no less" than 12 and 15 years of mine life. What seperates these two clauses is our NPV at the different discount rates: 12% for i), and 8% for ii).
...lf the report is positive under §5.5(b)(i), Teck Cominco may give notice to Salazar, within 30 days of receipt of the Feasibility Notice at which production rate the repon shall be considered a Positive Bankable Feasibility Study so long as the project selected has a positive NPV...
Since ES is reported to have said that Teck has 30 days to review the report, I can only assume that we met S5.5(b)(i)
Replying to @chappy726
I see Vette reported from ES that the "30 days" issue is not the case. So scratch my assumption that we were positive NPV at 12%.
Yes Lynn knew nothing about it, then Kathy (CFO) knew nothing about it. And i wanted to hear it from Elmer. Called him on his cell, he called me back 5 min later (he was going to the show).
He had no clue what I was talking about. At first he said oh you are talking aboiut the 45 days to be filed on sedar...I said no. He said hmmm 30 days...oh that's regarding the EA and goverment. Goverment has 30 days to approve the EA before getting processed.
So he said as soon as Teck receives the Feasibility they have 120 days to declare.
He aslo said, don't worry we have a pretty solid legal team.
Replying to @cuuvette350
I think the real issue is that until such time as there is actual notice of the bfs to Teck, and they are required to convey the Liard interests, our stock will flounder
That is the water torture we continue to endure, and will, until such time as there is any action on the part of Teck
If they have another 30 days built into not performing, we have another 30 days of watching this nonsense
Replying to @cuuvette350
So he said as soon as Teck receives the Feasibility they have 120 days to declare.
Ok, thanks for correcting that 30 day misunderstanding
...do you know if the Liard interests will be conveyed immediately upon bfs notice as I interpret the Salazar agreement to say in Paragraph 1.1, (b)
I don't think anything will happen to our share price until that happens
Replying to @Metacomet
What an emotianal rollercoaster. like Meacomet, I have tax liabilities in April and large property taxes in June. the thought of an extra 30 days delay would have taken us to the end of June for a decision and an offer could take another 45-60 days or so to vote on and finalize.
When we get an offer the shareprice will jump and allow those of us who need to raise money to sell some into the market.
I'm concerned that, since the power line won't be finished for another year or more, that Teck might use any excuse possible to delay their decision further. If they were to partner with CIC it's possible the Chinese would want the EA in place before commiting. there's already enough things here to worry about, we didn't need the 30 day thing.
Thanks Vette and others for clearing it up. I'll sleep better tonight.......chunky
Replying to @chunkytoast
i highly doubt this will be dragged out... I firmly believe that also CIC will be pushing teck to act quick on this as they might be giving a hand in funding the project... its just another foot through the door for China to get into our rich Canadian land... especially since they are copper hungry.
Seems to me that the reason for any disctinction in this language whatsoever, is that a larger project would be preferable, and be subject to a lower standard of economic qualification
We exceeded the size the lower standard by a factor of at least 2
..again I see a difference between what I believe Salazar says and how Elmer interprets it
Thanks for the notes JA.
The 30-day thing is very disappointing given that we had heard they were waiting for Teck to approve it, and that was part of the reason for the delay past September. We had heard that Teck did approve it and everyone seemed very pleased about that.
In the Agreement it asks for two levels of positive feasibility: one where there is a NPV of $1 using a discount rate no less than 12%, and one that uses a discount rate of 8%.
Because we did not produce a postive feasibility study at the 12% rate, Teck is given the 30-days in which to review the feasibility and declare, in their sole discretion, whether to deem the report a positive feasibility study. I had thought we had passed this hurdle before they announced the feasibility results. Apparently not.
We should have avoided this clause because it allows for an agreement on the cost assumptions, economic and technical parameters and discount rates to be used, between Teck and Copper Fox before the feasibility was written. If this agreement were in place then we did not need to wait those further 30 days. I would have thought they had this agreement.
Teck should give its approval on the 8% figures because it is very common in the industry to use those numbers. I can't really seeing them argue that they need the 12%. Still, though, another delay of sorts.
The 30 days is not the only delay if you consider these delays. And so, we are 1 step closer to the AGM that you all laughed about. If Teck doesn't make a good offer last wwek of this month or the first week of Feb I bet we go the whole distance. I will not be surprised if TT seeks an extension too.
Just spent a little time with Paragraph 5 of the Salazar agreement
I don't think I am interpreting it the same way
I believe it is saying that the smaller project requires the 12% NPV and is subject to the 30 day Teck review
If the larger, para ii, project, satisfies the BFS stipulations at 8% it is not subject to Teck election to be deemed positive
"any report that satisfies 5.5, (b),(ii) will be considered a Positive Bankable Feasibility Study"
In other words, I do not believe that we are subject to a Teck decision for the next step
They owe us the Liard shares upon receipt of the Feasibility Notice
The 30 day review is specific to the 5.5, (b), (i) case
https://docs.google.com/file/d/0B1opssTdj4BuY2FkMmQzMDctNzdiZC00Njg1LTg3YzUtNTY2MzhjODRlMGFl/edit?hl=en_US&authkey=CPLqmtQO
The 30 days extra time took me by surprise too and I don't quite understand it.
The 30 days is linked to a 12% discount rate resulting in a positive NPV (that is the only 30 days I see). Our +FS news release in December gives 5%, 8%, and 10% for different discounts, not 12%. Looking at how the NPV gets significanly smaller between 8% and 10%, I would think that the 12% case would not have been positive just as Prospekt reported. The ROV NPV at 12% might be positive but that is not applicable under the Teck Agreement.
+FS NR: http://www.copperfoxmetals.com/s/NewsReleases.asp?ReportID=563341&_Type=News-Releases&_Title=Copper-Fox-Announces-a-Positive-Feasibility-Study-on-the-Schaft-Creek-Depos...
Yet, we get a report back from ES that Teck has 30 days to decide if the report is acceptable. I can only think that the report was positive at the 12% discount??
---------------------------------------------
My bold and I split up the last paragraph
5.5 “Positive Bankable Feasibility Study” means a comprehensive report prepared in good faith that shows the feasibility of placing the Property or part thereof into commercial production and is positive as contemplated in this §5.5. The report will be considered positive in any of the following cases.
(a) If, prior to commencing the preparation of the report Salazar and Teck Cominco agree, in writing, on the cost assumptions, economic and technical parameters and discount rates to be used, the report will be considered to be positive if it indicates that production from the Property would generate a NPV, hereinafter defined, of at least $1.00.
(b) Salazar may prepare a report without a wńtten agreement with Teck Cominco as contemplatèd in that studies a project of any size selected by Salazar but no smaller than that set out in (i) but in this case Salazar must then, at the same time, study a project ofthe size set out in (ii). The report will be considered to be positive if it generates a`positive NPV in either ofthe following two cases:
(i) firstly, the report will be considered positive if it indicates that production from the Property Would, on a project basis, generate a NPV of at least $1.00 using a discount rate no less than 12% and assuming a mine life of no less than 12 years and copper rnetal production of at least 25,000 tonnes per annum;
(ii) secondiy, the report will be considered positive if it indicates thatproduction from the Property would, on a proj ect basis, generate a NPV of at least $1.00 using a discount rate of 8% assuming a mine life of no less than 15 years andvcopper metal production of at least 50,000 Ytonnes per annum;
Where “NPV” means the net present value of the Projected Net Cash Flow, as defined in Schedùle “E”, discounted to the date of the Positive Bankable Feasibility Study on a constant dollar basis assuming the consumption of no more than 90% of the proven plus probable reserves. lf the report is positive under §5.5(b)(i), Teck Cominco may give notice to Salazar, within 30 days of receipt of the Feasibility Notice at which production rate the repon shall be considered a Positive Bankable Feasibility Study so long as the project selected has a positive NPV.
If the report is positive under §5.5(b)(i) but is not positive under §5.5(b)(ii), the report shall be considered to be a Positive Bankable FeasibilityI Study based on the size of project >studied under §5.5(b)(i). If the report is positive under §5.5(b)(ii) but not under §5.5(b)(i), Teck Cominco may nevertheless elect, in its sole discretion, to deem the report to be a Positive Bankable Feasibility Study. lf Teck Cominco does not give any notice as aforesaid, then any report that satisfies §5.5(b)(ii) will be considered a Positive Bankable Feasibility Study....
They found a couple of spots that could make the 12% cut and agreed to forego that option. This is the starter pit portion. The terms were intended to set out a minimum starter operation that could act as a stand alone. It quickly became apparent that a larger study was required. Teck probably kept the option in the case where ii failed to meet the $1. This has a lot to do with the main option clauses. The capex costs between 25kta and 130ktd are huge.
For someone who has put five mines into production, it sure sounds to me like ES doesn't know what he's doing - where is the risk mitigation, the strategic planning and the insight?
How could you not know about the 30 days to check off all requirements before hand?
How can you not have a price in mind when the company's sole objective is to sell schaft creek?
I am increasingly skeptical there is a plan B - not sure there is even a plan A given what you have reported.
The only good news is the deposit sells itself with it's positive attributes.
My target $1-$3. Give me $2 and I will be on my way before any more value is eroded!
Not to pile on but I seriously doubt ES commitment to company! I question why:
1) he is in Phoenix when he should have been finishing up the BFS in September;
2) he is in on vacation in St. Lucia when he should be starting the clock; and
3) he is hosting BXX conferences when he should be talking deal with Teck.
Is it me? Or does he just wanders around doing what he pleases?
I was skeptical when he started as a contract CEO for the company but it seems he is no more committed as an employee with millions of stock options!
GLTA
...How can you not have a price in mind when the company's sole objective is to sell schaft creek?...
Seriously PPCguy, surely you dont expect CUU mgmt to share any perceived sp.
I would think mgmt has a range of prices that they are preparing in anticpation of any offer or possible negotiations. In addition to Elmer, there is a wealth of experience with CUU, including board members, and whether we agree with some of the decisions / strategies, I would think they have knowledge and experience in determining a range of sp prices.
And while I'd like to know what the scenario is, I also realize they arent at liberty to share.
jaf.
JA - thanks for the update.
Interesting about the delay and extra 30 days. If the BFS isnt released until the end of January, Tecks decision could take us to the end of June; and then Elmer says we will not drill, be it waste or other lands.
Therein lies my confusion, because I'm recalling a previous post that if Teck doesnt commit to a complete buy-out or buy-in, that Elmber has a 'Plan B'. I guess my assumption (my bad) that an alternative plan would include additional drilling to enhance the marketability of the property.
...puzzled about plan b...
cheers
jaf
I view those 30 days as time to negotiate the buyout before Teck has to hand over the Laird shares.
analytical
Thanks JA for the report. Very much appreciated. It seems that everytime that we think that we know "everything", we learn something new, ie, another 30 days for Teck to sign off approval. Seems a moot point as Teck have already approved the facts in the Dec. 21 NR, but it does get unnerving that we constantly seem to have these curve balls thrown at us. It's a mystery wrapped in a conumdrum.
Gee... Tetra Tech not delivering....I'm shocked, shocked I say to learn that gambling is going on in this establishment!!!
Buyout in Teck shares and the possibility of a CUU2 exploring the rest of the property with a new JV.....go ahead, make my day.
Looking forward to further reports from the VIRC. tia.
glta you longs
Thanks for the report! Turly appreciate the prompt relay. Very positive and down to earth stuff. GLTA!