Lower Expectations

People have been lowering their expectations on the buyout sp for a couple of weeks now.

As the days go on the predictions go lower.

I am finding the delays more than frustrating but I don't think my bad mood is going to effect negotiations. EE would probably have had this finalized by now if we were going to get less than two dollars per share.

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. "People have been lowering their expectations on the buyout sp for a couple of weeks now.

    As the days go on the predictions go lower."

    Ah... Not me. My buyout price has always been $4.19. I was mocked for it two years ago as being too low and now some think anything over 4 bucks is goofy.

    I'm sticking with $4.19 and have never lowered my expectations....

      1. There are people that have stated that based on the value of Schaft Creek alone our stock is worth $1.50 or so. We have read that the property as a whole contains 2-3 Schaft Creeks and then if you add in the extras like the port, powerline etc. etc., you do the math.

        1. "We have read that the property as a whole contains 2-3 Schaft Creeks and then if you add in the extras like the port, powerline etc. etc., you do the math."

          Problem is you have to prove it and we have over 400 million shares outstanding now and not a boatload in the bank. What's your plan?

          1. I will take $1-$3 now rather than later ...

            ES quit dilly dallying and get to work already!

            No conferences, no phoenix trips and no more BXX NRs for you!!!

            1. Replying to @ppcguy95

              My greediness has lowered, I would take $1.40 today for a nice double. Considering the market is currently evaluating us in the high .80's, $1.40 is not bad.

              1. Replying to @Nav2006

                Lucky for those of you in the black but there are others who are way in the red. Please be considerate and sensitive to those whom are not so lucky to buy at low costs like you.

                1. Replying to @Liddy77

                  While I am not going to guess that $1.40 will be the buyout price (I really am hopefully for $2-$3) you have to remember, Liddy, that the stock market is not "considerate and sensitive." Not at all.

                  It is cold and hard. Like 87 cents cold and hard -- few had predicted we would be here now.

                  Nobody at Teck is going to shed a single tear for CUU shareholders if Teck can get Schaft Creek on the cheap.

                  We're keeping our fingers crossed the Ernesto won't buckle and agree to a lowball deal and then have the board approve it.

                  Sounds unfair, but it happens. I sure hope it doesn't play out that way but I am preparing for anything between $1.50-$3.00, just in case.

                  1. Replying to @yournadir

                    IMO.



                    1. EE is obligated to maximize SH value.

                    2. Say it's a premium to SP now. You HAVE to think, is it enough for EE to just take the buy out? OR just tell Teck to go decide how much they want to back in, CUU will rather keep the small percentage. And please...arrange financing for us. I don't mind taking half of CUU's cut every year for the next decades. And please...use some of YOUR money to drill more resources for me too.

                    3. If Teck doesn't play fair, they can back out, CUU will have other big players looking into SC. Teck will miss out a big part of the Golden Triangle.

                  2. Replying to @yournadir

                    Talking to EE at the AGM in July, he said that the markets would definitely affect a buyout price, and the price "now" (July 2012) and in December might be very different. Are we beholden to some typical formula that says we'll only get a 30-50% premium over the 50 or 100 day SP? No, I don't think so. But to suggest the global markets and their mini-cycles and supercycles (thus affecting the pricing, supply/demand, etc.) have no bearing makes little sense to me. Majors see further down the road, and to some degree can make the markets ... very telling that the Teck SVP in that audio talks about making money basically on the commodity price spikes.

                    In my opinion, there is far "less" likelihood of a $3-5 buyout as there was pre-BFS - yes, I'm well aware of the ROV and what Elmer is saying about it ... we'll see is all I can say, maybe he's right, maybe he's not ... I'd like it a lot better if Teck senior management were touting this formula for how they would value deposits. I've tempered my expectations greatly and have felt a lot better given my own personal situation unloading a chunk of what I own, even at the last month's prices and taking a loss. All about risk management here - hope for the best, prepare for the worst.

                    As always, may the bulls be right and may this finish up soon.

                    1. Replying to @chops

                      very telling that the Teck SVP in that audio talks about making money basically on the commodity price spikes.

                      Are these cyclical "price spikes" captured in the Monte Carlo simulation ran in the ROV case? I imagine so.

                    2. Replying to @chops

                      Majors see further down the road, and to some degree can make the markets ... very telling that the Teck SVP in that audio talks about making money basically on the commodity price spikes.

                      In my opinion, there is far "less" likelihood of a $3-5 buyout as there was pre-BFS - yes, I'm well aware of the ROV and what Elmer is saying about it ... we'll see is all I can say, maybe he's right, maybe he's not ... I'd like it a lot better if Teck senior management were touting this formula for how they would value deposits.

                      You said it youself but am not sure you made the connection. Here's what Ron Milos says:

                      "And it ultimately comes down to the decision that price and the capital cost is the key things, but when it comes down to decision time, it's what's the likelihood that the commodity price is going to exceed this for an extended period of time. The key thing that we don't know is -- and probably nobody does -- is what the future commodity price is going to be. So you can pick your price and it is what it is.


                      The other thing that we know is when you build your models, year-long term price is CAD2.50, CAD3.00, whatever you believe it is going to be. In reality, the price is going to be spiking and the mining industry, you make all your money in the price spikes and that's the rationale for wanting the long life assets is that you get a lot more price spikes than you do with a short life asset.

                      That's basically the whole idea behind ROV in that it takes into account long life and "smooths" the spikes and takes that into account more. He is "touting it" with out actually saying it. The problems with NPV are the problems he lists.

                      The one thing that worries me is that he basically says you can make anything work if you put in the right numbers. Actual quote, "we can make anything work by changing your commodity price assumption." We have a pretty high copper price assumption. BUT everything else is pretty solid.

                      1. Replying to @JayJ

                        I think we'll be having this debate until the buyout (NPV, ROV, mine life, what premium for undrilled targets,?). The bottom line to me is that everyone is trying to get that crystal ball to see into the future. What is most disturbing to me is this fact that small tweaks with the numbers make Schaft unmineable or worth $5-10 a share. We know what Elmer thinks, we're very in the dark with Teck's thoughts or other majors although, yes, some obvious thoughts that relate to Schaft were given at the Whistler conf. I still think the overall markets aren't amazing for us right now, and it could be to our benefit if this takes a few more months to finish up. Forgive the lack of unbridled optimism on my part, I've just talked to too many people in the industry who are ho-hum with Schaft and it has tempered my expectations.
                        1. Replying to @chops

                          If Lawrence Roulston does'nt even catch the whole story I cant say what less knowledgable analysts or ''people of the industry'' understands more than us, working 24/7 to understand every faces of the Fox really...

                      2. Replying to @JayJ

                        Its funny how just a few short months ago on BNN Don Lindsey said they expected copper prices to rise significantly over the long term and here they are playing down their expectations by saying "we don't know what the future price is going to be." I would tend to believe their statements on BNN were more revealing as to what they really think as that interview was not talking about future acquisitions in the copper space.

                        1. Replying to @cbew

                          There are so many "good" points this morning from our posters. IMO I think someone should volunteer to accumulate all the good points into a list and when complete, email the list to ES. This will be our effort in helping ES remember all the good qualities of CUU, perspectives from the retail investors. I realize ES knows what he is doing, but CUU has been around a long time and so much has happened over the years, he might miss or not think of something to be important when we see its importance. ES could compare our list to his list to ensure he's got every possible positive avenue covered in negotiations. Maybe he would appreciate a different point of view. Fresh ideas.

                          I think we have nothing to lose in coming up with the list but a lot to gain. Our views could be so different from his. ES could be so focused on certain issues, he might miss views on other aspects that are valuable in negotiations. What do you think? Doing this might give us something positive to do and make us feel like we are supporting our great leader in the final critical negotiations with Teck.

                          1. Replying to @Liddy77

                            With all due respect Mr. Stewart really does not need a summary of speculations, since he does work with real numbers and facts. Having talked to him on a number of occassions I know he is fully aware of what is going on.

                2. Replying to @Liddy77

                  Liddy, my post was not meant to be inconsiderate and insensitive to others, and if it was I apologize for that. I was simply sharing my personal opinion of what "I" would be willing to accept and walk away at this time at this point and tme, before any other drilling or delay. Believe me, if CUU shows signs of going up to $3- 5 area I will be staying in with a big smile.

              2. Replying to @Nav2006

                This is a world class deposit described as a mining district and you would give it away for $1.40. I'll put my money on EE thanks.

              3. Replying to @Nav2006

                But, a double for you is a loss for others. I hope EE doesn't take this stance. $1.40 is probably a 3-5 bagger for him. Some have upwards of $2.70 a share.

                Maybe we all will know in another week? If not, hopefully the Teck clock will be ticking !

                1. Replying to @koala

                  Ok let's get this straight.

                  Shaft Creek is an Asset and will be sold as one.

                  A Global Giant called Anglo American had 100% (now 81.9%) of an Asset called Quellaveco and they sold 18% of it for 900 million. This was not based on share price or Feasibility results, they don't even have a feasibility.

                  http://www.mineweb.com/mineweb/content/en/mineweb-fast-news?oid=145579&sn=Detail&pid=102055

                  So what do they have, yes a resource estimate : 823 Mt @ 0.44Cu (3.68 billion pounds of copper) and 183 Mt Inferred at 0.45 (828 Mil pounds)

                  A capex of 3 Billion (in 2010) with no real feasibility to back those numbers up. What are the real numbers and what woul dthey be today in 2013.

                  Yet 18% of this Asset was part of a bidding war:

                  ''Japan's largest trading house outbid JX Nippon Mining and Metals Corp, the parent of Japan's biggest copper smelter Pan Pacific Copper, Mitsui & Co and one other Japanese trading company, an industry source said.''

                  Oh and they're in Peru...

                  So what do we have on 50% of the Paramount and 50% of the Liard zone (2% of the Land):

                  Measure and Indicated: 7.1 Billion pounds Copper, 7.3 Million ounces of Gold, 66.7 Million ounces of Silver, 455.3 Million pounds of Moly.

                  Inferred: 2.9 Billion pounds of Copper, 3.3 Million ounces of Gold, 31.6 Million ounces of silver, 206.2 million oiunds of Moly.

                  +

                  We're in Canada, Teck agreement (financing and 340 million expenditure), Liard shares, Discovery zone & more, Port and Power.

                  So what's Teck really paying for 75% of all this....when you have others fighting over and paying 900 million for 18% of Quellaveco....

                  The question is, is Teck buying CUU's 25% or not. If Teck's offer isn't good enough for EE then just to bad, I guarantee you we'll have a ''WAR'' for our 25% and get alot more money.

                  Elmer said many have demonstrfated interest but they're all waiting for Teck.

                  I want Japan, China, India, Korea to fight over 25% of Schaft Creek.

                  At the same time do we really expect Teck to just finance someone else and put in 340 million including enhancements (metallurgical tests and upgrading Inferred) making the other party (who owns's 25%) that much more valuable....all this while our permits come in....no way.

                  CUU's not your typical junior in the Teck basket, and doesn't have your typical agreement.

                    1. Replying to @koala

                      Thanx from me too cuuvette350...I think 1st thing this am many were drinking the koolaid - no more care of you...cheers all!

                      (& here's to a Vette Stingray for you in any colour U like koala)

                      sb

                    2. Replying to @koala

                      Thanks Vette. Keeping things into perspective AGAIN.

                      Also a good time for this picture AGAIN. I hope for us all and trust we will be the guy on the top. :)

                  1. Replying to @cuuvette350

                    I kind of figured with all the crap, and lowball estimates,casting all thus doubt on our baby, it would draw you out... Nice for people to get all excited again for a bit. Hopefully we start to rise so, I'll be able to at least look at my portfolio again.
                  2. Replying to @cuuvette350

                    So what's Teck really paying for 75% of all this....when you have others fighting over and paying 900 million for 18% of Quellaveco....

                    I'll answer this myself:

                    Teck can earn 20% by spending 1 x expenditures = $85 million

                    ($17 million comes back to Teck, $68 million goes to CUU)

                    Teck can get 40% by spending 3 x expenditures = $255 million

                    ($102 million comes back to Teck, to Teck, $153 mikllion goes to CUU)

                    Teck can get 75% by spending 4x expenditures = $340 million

                    (So for an extra 85 million Teck gets 35% more.....)

                    ($255 million comes back to Teck, $85 million goes to CUU)

                    Now take a step back and look at these numbers...and keep in mind some company was willing to pay 900 million for 18% of Quellaveco.

                    40% is the more expensive of the 3, almost double

                    20% vs 75% = 68 million to CUU vs 85 million to CUU, difference is a meesly 7 million to get 50% more of the project.

                    Looking at 75%, the financing and the expenditures are part of the same...Teck is actually financing itself for $255 million (the amount of money required to earn in 75% that they would spend anyway to bring to production).

                    And when looking at the Capex numbers,....Teck really only pays 75% of it since CUU must pay back 25% of the capex once in production. So takle those Capex numbers x 0.75

                    Teck also has the opportunity to sell a % form it's 75% and actually end up paying a big fat ZERO in Capex....

                    And if Teck just takes 75% ( no buyout), majors will be all over us since all they have to do is wait and let Teck do everything.

                    In any of the 3 options...Teck is spending $85 to $340 million. (CUU play money)

                    That is small when comapred to 900 million, mitsubishi paid for 18% of Quellaveco in Peru.

                    How much of that play money does CUU really need to upgrade the 171mt in the pit and move up the recovery %..... 10-15 milllion max ? What value does this unlock...how many years does it add to teh mine life (5 years), it's a given.

                    And the Feasibility pit is only 50% of the Resource Estimate and teh Resource Estimate is only 50% of the Paramount zone.

                    When looking at it this way it's starting to look like 104 year mine life here....at only 400m depth.

                    The best grades are below 400m and it was still open at 800m...

                    And we didn't even touch the Discovery zone..

                    Teck knows all the above and more.

                    So those still looking at the NPV...PLEASE...get your nose away from the tree truck and start looking at the forest.

                    1. Replying to @cuuvette350

                      The only option for Teck is buyout I think we all agree. But what are they waiting for? Is there a big event they are waiting on, EA decision, elections, approval from Teck BOD, do they want to lock up more land in the area? The longer Teck waits the better for them, and worse for CUU.
                      1. Replying to @cuushareholder

                        Waiting bad for CUU?

                        Not necessarily, waiting is part of negotiating tactics. If we did not have deep pocketed backing & 65% insider ownership maybe then a different & one sided game !

                        1. Replying to @Metacomet

                          Once the official notice is delivered it too late for Teck to save transfer of the laird shares, then we wait 120 days for action. I hope the offer comes soon. But looks like well be waiting the full 120.
                          1. Replying to @cuushareholder

                            I hope the offer comes soon. But looks like well be waiting the full 120

                            What makes you think that? Teck has a history of acting fairly soon after they are put on notice. Besides that if they are going to buy us out 100% they must put this to a shareholder vote as per SEC rules so add another 30-45 days to send out notices etc. If their offer is rejected (we get another offer) then they must allow even some more time to make another offer. Therefore, imo, a buyout decision and offer must come within 60 days after our notice is delivered otherwise they will be forced to make a back-in decision.

                            1. Replying to @cbew

                              I take it that any shareholder notices for a vote must fall within the 120 days they have to make their decision, and vote. So I agree that Teck can't take much more than 45-60 days to make an offer, and maybe 30days or less if they "lowball" their offer, thereby chancing CUU refuses it.

                              If I were them, I would be weighing my offer right now and make it good enough that it has a real good chance (90%) of being accepted. A rejection of their initial offer really puts a squeeze on their time constraints to make another offer and get it approved within the 120 days. All of this really amounts to how bad they really want SC, and/or if they want a complete buyout.

                              Drop the BFS on em & get the clock ticking !!!!!

                            2. Replying to @cbew

                              cuushareholder said:
                              "I hope the offer comes soon. But looks like well be waiting the full 120"

                              cbew replied:
                              "What makes you think that? Teck has a history of acting fairly soon after they are put on notice. Besides that if they are going to buy us out 100% they must put this to a shareholder vote as per SEC rules so add another 30-45 days to send out notices etc. If their offer is rejected (we get another offer) then they must allow even some more time to make another offer. Therefore, imo, a buyout decision and offer must come within 60 days after our notice is delivered otherwise they will be forced to make a back-in decision."

                              cbew, thanks for that and I agree. But I'd go further and say cuushareholder's suggestion, given as it was without a rationale, is 'soft bashing' and is not the only recent instance. Yes, I am being critical, so apologies to anyone who thinks my rare appearance on the main forum means that I'm "irate" about something. It's really just my antennae waving about.

                            3. Replying to @cbew

                              Just a theoretical question IF Teck goes for the 75%. They take the 75% and decides to shelve it for a while - where does that leave us (CUU) in regards to "enhancing" our 25%? Could we start drilling the waste rock on our own in efforts of making our 25% look better to other companies. Possible?
                              1. Replying to @Investorish

                                They take the 75% and decides to shelve it for a while - where does that leave us (CUU) in regards to "enhancing" our 25%?

                                I think this question has been dealt with before. They cannot shelve it because under the agreement with Salazaar they will be under a time constraint to get the mine up and running within 4yrs. They have to act within the spirit of the original agreement even if a new time constraint ( let's say 5yrs is renegotiated ) to get a mine up and running.

                                Some lead items take up to 3 or 4 years so they have to start ordering these items asap. Imho, as a PE, I don't thing this option is going to be chosen by Teck. Most likely they will need at least another 2 years to fine tune SC to make a "real production decision" based on better recoveries, revised mine plan and BFS. That means more drilling to define the Paramount zone where better grades were found at a shallower depth, ugrade the 171m tons, and find other cost cutting measures etc. So add 2 years plus 5 to build and we are looking at 2020 for the actual mine to be in production. No way will they meet a time constraint of even 5 years.

                            4. Replying to @cbew

                              I understood the need to backin a little different. If Teck were to make an offer for 100% of CUU after let's say 110 days after delivery of the BFS that would superceed the need to opt in for a percentage. Would Teck really need to opt in for a percentage if they just made an offer for 100% of CUU?
                              1. Replying to @cuushareholder

                                Would Teck really need to opt in for a percentage if they just made an offer for 100% of CUU?

                                What if their offer is rejected due to a better offer? They have to make a decision within that window of 120 days. ie Teck makes a buyout decision at day 100 and is endoresed by the CUU BOD. Day 119 comes along and another Major bids 10% higher than Teck. Teck then has one day left to make a bid higher than the last bid and also hopes nobody else outbids that last bid otherwise they will be put into a bidding war or else lose the entire property. Somehow, I don't think Teck will want to be put into this position.

                              2. Replying to @cuushareholder

                                Only if their buyout offer was accepted

                                If they fail to buy our interest, it survives, and we go mining together

                                ..or we sell our partnership and/or Liard shares to someone else

                                (who may not be quite as accomodating as us)

                            5. Replying to @cbew

                              "What makes you think that? Teck has a history of acting fairly soon after they are put on notice. Besides that if they are going to buy us out 100% they must put this to a shareholder vote as per SEC rules so add another 30-45 days to send out notices etc. ..."

                              cbew:

                              What SEC rules are you referring to?

                              If Teck decides to back-in for whatever %, or acquire SC or all the outstanding shares of CUU; it is well within the Board's power to do so without requiring shareholders' approval. Yes. It is a major acquisition, but it's an acquisition in the ordinary course of doing business and that would not require shareholders' approval.

                              In addition, the only shareholders required to make decisions with Teck are the Class A shareholders (the Keevil family and close associates) who control the voting by virtue of their 100 votes compared to the 1 vote for each share for Class B shareholders.

                              What I'm saying is that Teck does not need all the time (30 or more days) to make an acquisition decisions; they can be made virtually within days. JMO

                              1. Replying to @walkingzombie

                                "If Teck decides to back-in for whatever %, or acquire SC or all the outstanding shares of CUU; it is well within the Board's power to do so without requiring shareholders' approval. Yes. It is a major acquisition, but it's an acquisition in the ordinary course of doing business and that would not require shareholders' approval."

                                I recall that, in conversation someone had with Elmer Stewart, he would take any offer to ALL shareholders. Perhaps that someone could confirm?

                                Edit: acknowledged that he doesn't need to, correction welcome. And, if it's okay with EE, it's okay with me, provided, as ES has also said, I think, that no shareholders would be left high and dry, in reference to those who bought at or near the top.

                                1. Replying to @Willy Nilly

                                  The situation is very different for CUU. Yes, the selling of the majority of assets of a company or accepting a proposal from another party to buy up all CUU's outstanding shares would definitely require a shareholders' approval!

                                2. Replying to @Willy Nilly

                                  I recall that, in conversation someone had with Elmer Stewart, he would take any offer to ALL shareholders. Perhaps that someone could confirm?

                                  Yes, I can confirm that. I asked MS at the convention if they would take a buyout decision to all shareholders. His answer was yes they would. They wanted to follow SEC guidelines even though one shareholder ( EE ) will ultimately decide. It is also prudent to do so as it allows any other competing bids to enter in the marketplace. Just look at other companies that were acquired. Most allowed at least 30 days for all votes to be counted and also other competing bids from other companies. They will do it this way so that no one can accuse management of not allowing sufficient time to get another competing offer. This is what I was told at the convention.

                                  1. Replying to @cbew

                                    cbew:

                                    My apologies all around! I thought you said Teck would take all the time for a decision; not realizing it was CUU you were talking about. Yes. for a buyout, CUU would definitely require a shareholders' vote.

                                    1. Replying to @walkingzombie

                                      I talked with Elmer about this and he said he would take any reasonable offer to the shareholders. Mike has recently said they would announce any firm offer.

                                      I think the point is when you are negotiating you don't run out the door and announce everything that comes across the table.

                                      Elmer said that they would convene a meeting between the Teck representative and Copper Fox. At the meeting Teck would give them an offer. If it was clearly unnaceptable, like under the current share price for example--my words, then it could be rejected out of hand. At a certain figure though they would be given maybe 10 days to respond and be able to get a fair market opinion.

                                      Clearly corporations go through some sort of private negotiation process before having to make a potential deal public. All the time offers get announced that had to have some extensive discussions beforehand.

                                      Then we vote and if it were for a buyout, I believe we would need to vote before those 120 days were up if Teck were trying to avoid that deadline. It does look like Teck would have to move fast if they want time to negotiate.

                                  2. Replying to @cbew

                                    The laws are straightforward regarding this and yes we all vote, but I will believe teck will respond quickly, when I see It. If by chance we don't get an offer prior to BFS delivery to teck, I can see this going the distance, We have catered to Teck on every aspect ( I believe anyway, minimal BFS), there will be people saying we are close lets get this done. There will be further excuses to drag this out. Elmer won't want to burn bridges with Teck while he has other projects on the go. He will cooperate as long as the talks are on going. The 120 days can be extended by mutual agreement.
                                    1. Replying to @Brad129a

                                      He will cooperate as long as the talks are on going. The 120 days can be extended by mutual agreement.

                                      Not likely imo. There's accomodating and then there's being too subservient. Keep in mind Teck has all the data and has had it since July/12. They've had plenty of time now to make up their minds. Management wants their decision asap as well. Do we want to drag this out thru the summer and risk another exploration season going to pot? NO WAY...

                                      1. Replying to @cbew

                                        I definatly don't want this thing dragging out all summer, but sorry I can see it happening, teck has our document maybe unofficially, but I can bet they've seen it. Like you stated they have had all our files since 2012 so why have they not acted? They don't need the official BFS to act they have the summary from our news release? Maybe they are talking now maybe not. But until we hear something, then in my mind this can go on. If there were any serious negotiations going on then I don't believe DM could have been trading or shouldn't have been.
                                        1. Replying to @Brad129a

                                          We are waiting on TT to complete the condensed version, not on CUU to UPS the document to Teck.. DM is not involved in negos. IF he would be, he would be blacked out. thanks

                                          1. Replying to @simc1

                                            Yep we are, but where does it state we need to file with sedar to deliver positive feasibilty notice to teck, Jason couldn't even answer that? we have a completed feasibility as stated in news release of Dec 21,2012.

                                            About Copper Fox

                                            Copper Fox is a Canadian-based resource development company listed on the TSX Venture Exchange (TSX-V: CUU) with a corporate office in Calgary, AB and an operations office in Vancouver, BC. Its major asset is the Schaft Creek copper, gold, molybdenum and silver deposit located in northwestern British Columbia, Canada for which a positive Feasibility Study was recently completed. The details of which are included as part of this news release

                                            On another note go back and read the discussions that took place in 2011 when we all migrated from SH to here and all the comments "train is leaving the station","last chance to get in on fire sale","were about to explode,any day" how many have come to fruition. Where are we today higher or lower?

                                            Did you think 2 years ago we would still be in this? so who's to say in 4-6 months I'm not bringing up this post.

                                            I want this over and done with, my first purchase was like 7 years ago and as far as i know the only other one on this board who has been in this as long as myself is Cbew.

                                            1. Replying to @Brad129a

                                              It says we need to deliver it to teck, thats what TT is working on. CUU have 45 days. everything is doing ok.

                                              As to your frustration about the discussions about our buyout expectations, well they were just that, discussions. I always said Teck will want the BFS before making its decision because they need to demonstrate what they are buying to their shareowners and this is what they will do imo. I don't think it really help to remind us how far off we where about being bought out 1,2 or 3 years ago.

                                              IF we stick to the facts, that teck has 120 days to make a decision after delivery of the bfs, which is supposed to happen by Feb4th or 5, I think we will all be fine or would have experienced better sleep nights over the past years.

                                              gl

                                              1. Replying to @simc1

                                                we can discuss this all day, If our job is to deliver a possitive feasibility to teck why would we not give them a copy of our possitive feasibility full version? I don't think the cost of photo copying 5000-10,000 pages is the answer. no where does it state a condensed version has to be completed to start the clock, just as it doesn't say once filed with sedar the clock starts. Could we file with sedar without sending a formal delivery to Teck? I believe we can So who is to say that once filed, we don't wait more time to deliver an official delivery notice. I'm just asking?

                                                1. Replying to @Brad129a

                                                  You don't expect them to tell us everything don't you? I trust they are managing this in their (and ours at the same time) best interest otherwise I would not be invested so much in this. The fact they are fully invested themselves should remind you how bad they want to achieve at selling this at a maximum value. I trust they do what's best.

                                                  1. Replying to @simc1

                                                    This is what keeps me sane. The amount of cash they have in the project makes it almost an assurance that we will have our cake and eat it to.

                                                2. Replying to @Brad129a

                                                  Brad I don't know if this helps or not but here goes . Someone posted awhile back about the delivery of the BFS . The wording of the item said something along the line of " Teck must be presented a Resonable copy of the BFS . I took that to mean " Resonable in size " thus condensed . What's Reasonable mean in a legal document ?

                                                  I hope someone remembers the post I'm referring to and can repost because I'm going on memory and could be wrong in which case sorry for muddying the waters .

                                                  1. Replying to @Lois Denominator

                                                    We've got conflicting information from what I understand.

                                                    We have reports from people that Mike has said that, paraphrasing, Teck will recieve the full report (all several thousand pages). This makes sense in that...if they're going to be the ones building it, they should see it as in as much detail as possible. Especially since we've "been working with Teck" the whole time, they shouldn't need a summary.

                                                    However, we have the full document finished. So send that to them... What are we waiting on? We're told that we need to file it to SEDAR first. We need a condensed version. This might either be because it's smoke and mirrors and a diversion - or that they want all investors to be able to see the report before they give Teck notice. Considering that they don't seen to have cared about what we think for a while now, I don't imagine transparancy is the reason for delaying starting the clock and giving notice. It doesn't make sense to give them a summary report.

                                                    But I don't see them being in negotiations with the recent selling from DM. As far as I know we also haven't retained anyone to do any evaluation of offers which management has said we would have. I'm not shocked that they'll probably take the full time to release it on SEDAR, but I can't figure out why - and am not sure the board has a consensus either.

                                          2. Replying to @simc1

                                            We are waiting on TT to complete the condensed version, not on CUU to UPS the document to Teck.. DM is not involved in negos. IF he would be, he would be blacked out. thanks

                                            Yes, but since Dec. 21, 2012, no one is on blackout. So how can negotiations be going on?

                                          3. Replying to @simc1

                                            We are waiting on TT to complete the condensed version, not on CUU to UPS the document to Teck.. DM is not involved in negos. IF he would be, he would be blacked out. thanks

                                            Yes, but since Dec. 21, 2012, no one is on blackout. So how can negotiations be going on?

                                        2. Replying to @Brad129a

                                          Like you stated they have had all our files since 2012 so why have they not acted? They don't need the official BFS to act they have the summary from our news release?

                                          I have my own theory why. Possibly they are waiting on another partner to get their house in order. They may have told Cuu management we are not ready to move on this until after such date so could you pls wait until after... Then after this we will act quickly. That is one possibility and would explain the slow motion moves of Cuu management.

                                          Other than that I can't see any reason why they are dragging this out or even waiting for a summary of the BFS when the agreement doesn't require one. I asked this question at the conference as well and got the standard answer .. "waiting on TT to finish it and sign off''. However, this excuse is now starting to ring hollow. My intuition tells me something else is going on behind the scenes. However, I think we will know very soon ( Feb 5 ) what will happen.

                                          Nevertheless, for Cuu management to agree to a delay like this must mean a payoff at the end of it. I believe they want to get this done asap also.

                                          1. Replying to @cbew

                                            They don't need the official BFS to act they have the summary from our news release?

                                            Apparently Teck have reviewed the Appendices that feed into the feasibility but have not had the feasibility itself. They have had access to the raw data that they downloaded in the summer and were able to do their own work using that information but haven't seen what TT has done yet. When I spoke with Lynn fairly recently she said Teck were keen to get the feasibility document to review it. So, it appears they do need to see it.

                                            I also think they would need that document in order to secure funding or arrange a partnership if that is the direction they are going.

                                            Until the feasibility is published the document isn't finalized. They can't give it to Teck in its final form without putting it on SEDAR because it is material information. They can't put it on SEDAR until they have the condensed version. So we wait.

                                      2. Replying to @cbew

                                        I don't see Teck extending this either

                                        Hard to figure what their advantage would be to do so, and assuming they do want the property, seems like they would like to capture the upcoming work season to make progress toward bringing the mine online

                                        Even when the deal is recast, unless the CUU side goes nuts and provides total relief from the time to production requirement, it isn't to Tecks advantage to squander another year...

                                        1. Replying to @Metacomet

                                          I believe that at this point in the game that Teck knows exactly what they are going to do. They need the BFS officially delivered for the sake of their shareholders. I expect a very quick response once they have the document (which again begs the question - what is going on with the BFS?)

                                          glta you longs

                            6. Replying to @cbew

                              "Teck has a history of acting fairly soon after they are put on notice."

                              It was pointed out to me by CUU management at the VRIC that TECK has a history of acting very fast if they have a negative decission on a project, so delays could possibly be considered as a good sign.

                          2. Replying to @cuushareholder

                            I would expect (hope) that Teck would combine the delivery of the Liard shares with a proposal of some form defining their intent with regard to Schaft

                            Seems to me that wouold be the most logical way for them to proceed

                            Combining their required action with their proposed transaction regarding us

                            ...why this last lap with TT is so maddening

                    2. Replying to @cuuvette350

                      Wonderful points. Thanks

                      Imagine if Teck backs off, and BHP snaps in along with half Galore. How can Teck justifies to its shareholders including CIC in the next 50 years watching BHP harvests from the cash cow in their backyard day by day?

                      KP

                    3. Replying to @cuuvette350

                      Let's try this again, had some typo's in my numbers ..I'll add:

                      So what's Teck really paying for 75% of all this....when you have others fighting over and paying 900 million for 18% of Quellaveco....

                      I'll answer this myself:

                      Teck can earn 20% by spending 1 x expenditures = $85 million

                      ($17 million comes back to Teck, $68 million goes to CUU)

                      Teck can earn 40% by spending 3 x expenditures = $255 million

                      ($102 million comes back to Teck, $153 million goes to CUU)

                      Teck can earn 75% by spending 4x expenditures = $340 million

                      ($255 million comes back to Teck, $85 million goes to CUU)

                      So for an extra 85 million Teck gets 35% more.....

                      Now take a step back and look at these numbers ($68m ,$153m and $85m) ...and keep in mind some company was willing to pay 900 million for 18% of Quellaveco.

                      40% is the more expensive of the 3, almost double

                      20% vs 75% = 68 million to CUU vs 85 million to CUU, difference is a meesly 17 million to get 55% more of the project.

                      Looking at 75%, the financing and the expenditures are part of the same...Teck is actually financing itself for $255 million ($340m is the amount of money required to earn in 75% that they would spend anyway to bring to production).

                      And when looking at the Capex numbers,....Teck really only pays 75% of it since CUU must pay back 25% of the capex once in production. Through Teck eyes, take the Capex numbers x 0.75.

                      3 Billion * 0.75 = 2.25 Billion

                      Now use 10-15 million of the expenditures (money Teck would be required to spend anyway), and quickly turn the waste rock cost into revenue.

                      What's the Capex looking like now...

                      Oh and the Capex included cost to ramp up to 180,000 tpd...

                      What's the payback looking like now, top it off with a 2% increase in metal recoveries and using 5% since we'll be getting our permits.

                      Teck also has the opportunity to sell a % form it's 75% and actually end up paying a big fat ZERO in Capex....

                      And if Teck just takes 75% ( no buyout), majors will be all over us since all they have to do is wait and let Teck do everything.

                      In any of the 3 options...Teck is spending $85 to $340 million. (CUU play money)

                      That is small when comapred to 900 million, mitsubishi paid for 18% of Quellaveco in Peru.

                      How much of that play money does CUU really need to upgrade the 171mt in the pit and move up the recovery %..... 10-15 milllion max ? What value does this unlock...how many years does it add to the mine life (5 years), it's a given.

                      And the Feasibility pit is only 50% of the Resource Estimate and the Resource Estimate is only 50% of the Paramount zone.

                      Looking at it this way it's starting to look like a 104 year mine life..at only 400m depth.

                      The best grades are below 400m and mineralization was still open at 800m...

                      And we didn't even touch the Discovery zone..

                      Teck knows all the above and more.

                      So those still looking at the NPV...PLEASE...get your nose away from the tree and start looking at the forest.

                      1. Replying to @cuuvette350

                        good numbers,

                        Do you think we will be in this long enough to get the ER permits, do you know if they are at a stage to partially derisk ER now, is it completely separate from the BFS report.

                        following this story on my blackberry anchored behind an island in the Caribbean, great story just wish they could move along so I do not feel so overly long.

                      2. Replying to @cuuvette350

                        Don't forget to toy with the waste numbers, get the full deposit figured in (up to the pit constraints) and add that to the ROV calculation. Suddenly, Teck could add $3 billion to the capex for the purchase of CUU without blinking. Then sell 1/2 and get busy mining.

                        But, the odds are that if they take 75% they will send us out with a tremendous package and have Elmer negotiate with their new partner.

                      3. Replying to @cuuvette350

                        Vette, I'm puzzled by the numbers (since no one else has asked I'm assuming that it is just me). You state - using just one of the examples:

                        Teck can earn 75% by spending 4x expenditures = $340 million

                        ($255 million comes back to Teck, $85 million goes to CUU)

                        Why do you state that $255 million goes back to Teck? (I assuming that it is $340 X 75%) CUU has spent $85 million on developing SC, so I thought it was CUU money that they would use to invest for their 25% portion of the project. But it seems like you are stating that if they elect the 75% that we have to give back all that extra portion that was earned. I must be missing your point.

                        1. Replying to @notsoquick

                          Why do you state that $255 million goes back to Teck?

                          It's not money earned in the bank. It's money that must be spent by Teck on the project to earn it's % and Liard shares back.

                          The expenditures are proportional to the back in %. That's why it's a no brainer for Teck at 75%. They're financing themselves and earning in at the same time.

                          Since 4x85 million is 340 million...and Teck would own 75%..Teck is spending 75% of that money 255 million for it's own benefit.

                          In reality...the backin 75% is costing them 85 million.

                          But the cheapest of all options is to just take CUU out.

                          1. Replying to @cuuvette350

                            Re: The expenditures are proportional to the back in %. That's why it's a no brainer for Teck at 75%. They're financing themselves and earning in at the same time.

                            Thanks Vette, I certainly seems that I misread the agreemment when it states:
                            Should Teck elect to exercise its option for 75%, Teck is required to fund subsequent property expenditures up to a total of 400% of those incurred by Copper Fox ($84.9 million to July 31, 2012) and arrange for project financing, including the Copper Fox portion.

                            At first thought it seems like CUU took all the risk in spending $85 million of it's own money to prove the resource and in the end to have to give back 75% of project and only receive the value equivalent to the same money as what was spent. Seems like a lousy deal for CUU. But I now I am understanding the importance (value) of the Liard shares.

                            I think this is one reason that the share price is low - it is a hard to fully understand all the in and outs of everything and who owns what. Thanks for your guidence.

                            1. Replying to @notsoquick

                              NotSoQuick "At first thought it seems like CUU took all the risk in spending $85 million of it's own money to prove the resource and in the end to have to give back 75% of project and only receive the value equivalent to the same money as what was spent. Seems like a lousy deal for CUU. But I now I am understanding the importance (value) of the Liard shares.

                              Agreed the Laird shares have importance and Teck would want to keep control of them. After reading and keeping a mental map of all that has transpired over the past 3 years, I strongly believe that everyone - Teck and CUU - wants the deal done! The only wildcard in this deal getting inked is the value placed on the waste rock...both parties know there is value in the waste rock and I cant help think that this is the sticking point right now. Its like buying a classic car that is in good shape...the owner wants a fair price knowing its a diamond that needs pollishing, and the buyer is nitpicking. I truely believe this deal will be done. I am glad now that EE is in the voting drivers seat since this board has turned a little negative lately...and I understand patience is wearing thin for many here. Too many want this thing done yesterday at $2.00. I have been here too long for a double. I could have more than doubled my money in Jr. Oil companies with a heck of a lot less risk. If thats all we get I will NEVER nvest in mining again and stay in my Alberta back yard!

                              Have a good weekend,

                              911

                    4. Replying to @cuuvette350

                      "...The best grades are below 400m and it was still open at 800m..." t

                      Thanks for the summary Vette.

                      I'm certainly not a geologist, but I believe porphey minerals are most commonly found deep within the veins / roots of extinct volcanoes, espicially in areas where erosion over time hasn't exposed the minerals.

                      Schaft Creek is located adjacent to the extinct Mt. Edziza volcano, and I also believe this geogrpaphic area is younger than areas in the southern BC and States where there are large gold & copper deposits - areas more exposed to erosion due to older formation.

                      While Schaft Creek is primarly recognized as a copper play, its hard not to appreciate the large gold resource, and that of neighbouring properties, Seabridge, Galore, etc.

                      My explanation may be lacking - any geologists out there to enlighten me on this?

                      thanks and cheers

                      jaf

  2. dsikorsk:

    I think you misunderstood my post. Here is an example of what I meant.

    What IF, ES forgot about Quellaveco (he might remember, but he might not)

    http://www.mineweb.com/mineweb/content/en/mineweb-fast-news?oid=145579&sn=Detail&pid=102055

    What harm is there to remind him, here is an example of a company that received a $900M offer without BFS, just infrared, in PERU, in addition to receiving multiple offers from other majors. Should Teck argue that CUU is worth ___, don't you think it would be beneficial to have at hand a counter argument using above as an example? That here CUU has a positive BFS, infrared, aerials, ports, additional lands, etc. shouldn't CUU be worth more?

    There have been other good citations and scenarios, which I think IMO, a list comprising these would be helpful to ES. Yes, ES has numbers and everything geological in his mind, but keeping up with other companies offers, situations, etc. may not be. Now, if Jason is a good PR person, ES should have a list like this with articles printed out for ES to refresh his memory, but we all know he is not a good PR person, so why can't we do this?

    Why would this be a bad (worst) idea?

    It's like in litigation, you always provide supporting evidence to support your claim.

    1. Liddy Im sure everyone can agree thats not a bad idea however Im pretty sure ES has a very solid backup for what he's asking... In theory, all his focus will be on negotiations now and he surely have done a lot of research and has a ton or arguments ...

      1. Per my conversation with Elmer, they have been pooring over multiple FS's over the past few months looking for similar deposits to SC in Canada, North, South and Central America. They are doing this in anticipation of negotiations so I think they got this one covered.

        L

      1. I think he must be doing a good job if Teck is resorting to argue this through the press.

        Didn't BurningRoF show that they said the same thing essentially last year? I don't think we can claim that they are speaking directly about our project. What about CCY for example? Isn't their Teck clock started already? I'm not following that project but I'm not sure that everyone should think that everything Teck says is a wily negotiation about Copper Fox.

        --http://agoracom.com/ir/CopperFoxMetals/forums/discussion/topics/561959-teck-webcast/messages/1768452#message

        BurningRoF

        Reply in Copper Fox Metals Inc.

        I think it should be pointed out that Teck said very similar comments in their Q2 2012 Conference Call, so I don't think we should get too excited about timing. Don Lindsay: My first comment is that is an excellent question and very well phrased. And it goes to the heart of th...

        1. BRF and Prospekt have a good points, and I reiterate that you have to interpret new info in terms of historical context. During the VRIC presentation ES stressed the ROV approach, yet a lot of folks are not convinced that TECK will thake that into consideration in their valuation. I do no discard the SP in the negotiatons, BUT I also think TECK is savy enough to recognize the vaue of the ROV vs NVP approach.

          I think there is a lot of support for the ROV approach in the moining industry and having a look at this paper may be worth it. Check out the participants in the study.

          http://ccsd.biz/publications/files/TA/TA%2023%20Real%20options%20report_web.pdf

          1. Teck's valuation approach only matters as it affects their decision on whether they want to exercise their Option ie. up to 75% of part of Schaft Creek.

            The valuation opinion of EE and the other insiders (who own and control some 65% of CUU) matters in determining whether Teck will own 100% of Schaft Creek or some lower %.

          2. Elmer told me that he made the decision 1 & 1/2 years ago about the ROV option after attending a seminar on it. He indicated that this was the way of the future in valuing projects.

            By that I mean on the cutting edge.

            SB2

        2. So your saying that Teck has been using this tactic for at least 2 years now. They must really have been conserned and knowing this for quite some time.

          I don't see were CCY has 3 or 4 investors have controling shares.

          1. Everyone is frustrated with the current sp. However, we can easily more than double from here in short order. Take a look at Eco Oro Minerals (EOM), located in Columbia. Earlier this week, it went up 115% in 1 day. The right catalyst can do the same for us.

          2. We have been trying to sell this property and maybe a little lazy about it as we know it is a good property ( boardwalk ). Teck on the other hand has lots of money and some good property one of them Galor ( park place ). Tech with all it's money has now found out it can't build houses (mine ) on this property without owning both and their pouting. We know this and want as much as we can.

            We offer it last year Teck says to much. ( Don Says 3 or 4 insiders want 70% 80% )

            We then get off our assets and get BFS done ( We were being lacks on this figuring it wasn't needed )

            We now have picked up the railway ( shipping at Stuart ) and electic power ( NTL )

            We offer all these properties and up the price a little.

            Tech cries again yesterday ( 3 or 4 insiders want 70% 80% ) and we won't have enough money left to build houses ( mine ).

            We take next step and try to get EA done ( this EA gives us the ability to build without owning both properties ).

            I say to Teck suck it up you will be able to build houses if you morgage or sell some of your other properties.

            1. Replying to @miner747

              Interesting analogy.

              I also find it interesting how our agreement with Teck keeps making my thinking go in circles. One the one hand I think how the BFS isn't that good (optics) so that Teck will not want pay us what we think it is worth - so that they may walk. But then I think of how they get in on a major project (20%,40%,75%) so inexpensively compared to the asset value that they really can't afford NOT to take their option. But then I think of how in taking a less than 100% portion, they now don't have full control which a major would certainly want. So then in the end, I realize that they will really want to buy us out. Now I'm back to where I started. :)

              My point is only that this is why I full believe that CUU and Teck will be able to come to agreement on a price. We want to sell, they want to buy.

          3. CCY is owned approx. as follows:

            Guistra & his Radcliffe 20%

            Greenslade and other Board members ~5%%

            Accountant007 and Mudguy ~3%

            I believe you need 90% of votes to force leftover minorities to sell.

            Guistra is like EE, has deep pockets!

          4. Frank Giustra owns about 20% of CCY thru Radcliffe.

            He has spoken of purchasing land in mexico from farmers.

            He is another schrewd billionaire.

  3. Golf was there not something mentioned in one of the conference calls,(i don't think the last one) where Elmer stated Teck would be the operator as they are more experienced In that, we are explorers. Not sure I'm remembering this correctly or not, anyone else have input? BTW I know the option agreement doesn't read that way, but words directly from Elmer's mouth.

    1. That was Elmer responding to my question on the 12/24 call

      I pointed out to him that the Salazar agreement provided for CUU to be the principal in the JV agreement that was mandated to be drawn within 60 days of the BFS until they earned whatever interest they opted for

      Elmer allowed as how that didn't make sense because Teck was more experienced

      I allowed as how, so what.......

      Teck needs to bring money to run the show

      I do not understand not using whatever leverage you have

      1. Thanks meta, I knew I read it somewhere, I agree he needs to start showing a bit of muscle, otherwise Teck is going to keep making digs as they did in webcast, which creates doubt. I know Brof reminded us Don said that a year ago, but I even believed back then he was aiming that comment to cuu.
      2. I do not understand not using whatever leverage you have

        I don't believe Elmers wants or needs the leverage on the option lands.

        Would make sense if the whole game here is a very friendly arrangement whereby TCK buys 100% of the agreement lands which is really only 25% of the equity. The option lands then becomes TCK's worry to prove up for completion of a mine decision.

        Cuu walks up to the hills and continues drilling the additional properties with the 85 million plus the purchase cash and minus a shareholder payout. There is no CUU 2.0 just a company flush with a huge exploration cash budget and plump a share price with some great properties to drill out. Proving the district is a potential that will unlock even more value in the the coming years. Why would an explorer such as ES sell before its been fully explored. Would EE and ES leave this potential pile of cash behind?

        When push comes to shove why would EE want to hold onto the 25% interest of the option. We really gain very little in the long run with a Tech back in at 75%. He has already established its value. The task on this portion of the properties has been determined. Even though drilling is not completed on the pit waste everyone knows its true value.

        So lets move on. Drill the other lands of which we own nearly 100% after NSR's and acquisition agreements.

        That's what I would do.

        1. Wasn't talking about option lands

          He has an agreement that states, pretty clearly, a JV to develop the mine is to be formed with Teck, within 60 days of the BFS notice

          ...and until Teck earns their chosen interest, CUU will remain in control of the JV

          IMO, that is a pretty significant clause

          Cannot imagine Teck being comfortable being on the hook for several billion dollars subject to a JV which they don't control

          ...and that is a position that could be assigned to a successful bidder for the CUU interests

          My point is that seems to be a valuable lever assuming Teck has an interest in Schaft Creek

          It is certainly an issue that I would exploit

          See paragraph 15

          https://docs.google.com/file/d/0B1opssTdj4BuY2FkMmQzMDctNzdiZC00Njg1LTg3YzUtNTY2MzhjODRlMGFl/edit?hl=en_US&authkey=CPLqmtQO

          1. Were we not still expectig an enviroment report ? I don't recall that it was in yet. And could this have any effect on us waiting. Please jog my memory on this ! Otherwise it's taking the mule along time to get to Tecks door. :)

            1. Replying to @abullion

              The federal environmental screening application won't be submitted until this quarter according to someone's report of what was said at last weekend's show. That's definitely better than 3rd quarter, which is what was originally stated in the December conference call.

              Once that is submitted it will likely take several months (and IMO up to a year) to get the completed EA report at which time the permits are also expected.

              Since the project risk is reduced significantly upon receipt of the completed EA report, perhaps we'll enter into a back in arrangement just so Teck can drag things out long enough to ensure the permits are acquired and the mine can proceed.

              I think this is highly improbable, but nothing would really surprise me any more.

              1. Replying to @zircarg

                IMO the only arrangement that should be satisfactory to management is either 100% buyout, or whatever backin % Teck may elect. If Teck does anything less than full buyout CUU needs to take the money and drill like never before. If there is no full buyout CUU needs to go on the offensive and spend 20-30 mil drilling.
  4. Whaterver the ideas are lets just leave them alone... they know how we feel and let them come to us with news instead of us trying to harass it out of them and put more delays on their daily duties.

  5. Yes I do know about the 4 year clause but the question was in regards to what happens near term. We all know CUU want to sell their 25%. Management has stated that many times. Why wait 4 years to see if Teck can fulfill their obligation. I would like to see CUU enhance their position asap by drilling that waste rock so we can sell at a better price. The existence of that clause seems a bit blurry even according to Elmer...
    1. Yes I do know about the 4 year clause but the question was in regards to what happens near term.

      If Teck choses to back in this is what I think will happen: Cuu management and Teck will get together to form a JV agreement. In that agreement they will outline a strategy of what will be done and how much money will be spent in what year. I imagine Cuu management will want a drill program to upgrade the 171M tons, plus drill out the Paramount Zone etc. done this upcomming drill season. Teck, now the junior partner until they earn back, will probably go along as it is something they would do anyways if they bought us out. So to fulfill their obligations, Teck has to abide by this new JV agreement. They cannot just "shelve it" otherwise they will be violating this new JV agreement.

      JV agreements are written up this way. Their purpose is to insure that monies are spent in the timeframes stipulated by each partner. Its like buying a car. You can't tell the dealer you are going to buy it without some commitment (deposit) on your part. Hope this answers your question.

      1. Did anyone expect we would not have delivered the BFS already, this is day 36, one thing I am learning is to expect the unexpected. It's easy to say an offer will come very quick because of such and such reason, but has anything, anything at all gone the way we plan? everyone here expected the minute the Bfs was released to us the clock started. (including myself and Vette, shown by his countdown clock to start tecks clock) every single poster has been wrong...