Capex

The one thing I will say is that the capex was kept to a better figure than many predicted. The capex figure is more accurate and not as prone to tweaking variable information as the NPV or using ROV. Teck would also be able to run their own capex at a better rate, and verify the accuracy with quotes of their own.

Teck should be able to take the capex and understand that the rest of the information in the feasibility are flexible in the sense that improvements can be made. The capex already anticipated the increase to 180,000 tpd and the NTL costs. So it is a real solid number whereas the NPV or ROV seem a little more open to interpretation.

I don't know how this gets incorporated into the value exactly but since climbing capex costs seems to be a major concern getting this one in properly should be the major consideration. If Teck believes that the other information can be improved, like increasing the metal recoveries, upgrading those inferred to reserves, shortening the development time and that the potential for this being a district is real, then the most significant figure is the Capex. (Well, and the Opex, which was less good but still real.)

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. The capex already anticipated the increase to 180,000 tpd and the NTL costs.

    Yes the initial capex included $374 million in contingencies and the sustaining capex included $200 Million for BC Hydro.

    171mt Inferred can easily be upgraded and metal recoveries can be improved 2% easily.

    Enviro permits will bring us to 5% not 8%.

    Then we have the other half of the Paramount zone...

    And speaking of NTL, anybody talk to Elmer or Mike about the 3rd spot on the Power Line.

    If Copper Fox Metals ''the company'' has the limited Port space and the 3rd and only place on the Power line....then I only see 1 way for Teck or another company to be in that same position...

    Teck, who has projects in BC, a good relationship with Asia, who recently claimed land around us: They'll be using Copper Fox to get that Port and Power spot...

    If they don't someone else will gladly take their place.

    ''Mr. Stewart said "With so many active projects located in this part of British Columbia, Copper Fox is delighted to have secured the facilities required to ship concentrate from the Schaft Creek project. This transaction with Stewart Bulk, who has over many years established a reputation for quality and efficient workmanship in the concentrate storage and loading services, represents another milestone in the development of the Schaft Creek project". The Agreement is assignable to another party ''

    http://www.copperfoxmetals.com/s/NewsReleases.asp?ReportID=484908&_Type=News-Releases&_Title=Copper-Fox-Secures-Shipping-Facilities-for-Concentrate-at-Port-of-Stewart-f...

        1. The 2008 PFS stated that "Metallurgical recovery assumptions need to be verified".

          If the recovery can be easily improved then why was it not done over the last few years? Either it's more difficult than it sounds or management dropped the ball on running the necessary tests. The economic impact of improved recoveries would be huge.

          1. "If the recovery can be easily improved then why was it not done over the last few years?"

            A question that I am sure management can answer if you ask.

  2. The relatively low capex means that Schaft Creek is a lower risk project compared to higher capex projects, even if the economic numbers on both projects are similar. A 10 percent cost overrun on a $6B project is far more painful than a 10 percent cost overrun on a $3B project.

    The $3B project also leaves more capital available for the company to invest in other projects compared with the $6B project.

    A lower capital investment means a lower risk project. This is one of our strengths.

  3. Once the 171Mt waste becomes a resource the cost/lb to produce copper will drop significanlty from the current $1.15 - do folks here really think that TECK is NOT aware of this?

  4. Elmer also told me that they (CUU, Merit & PFS study guy) went to geat lengths to compare thier OPEX figures to at least 2 operating mines in BC. (Presumably Copper Mtn & HVC or Gibraltar) to ensure validity of their numbers.