Skip to content
Sign in

Post

Copper Fox Metals Inc.

You’re reading Nav2006’s reply in this thread.Jump to it

VEEP3.1 rating from 203 members9.3K ptsRate

The Contract

You can pick up the phone and call the legal department. The best person is Hector.

He'll tell you that the contract is the contract. He will also tell you that law in contracts is subjective and does involve the spirit of an agreement. I studied contract law for quite a few years just because I wrote a lot of them. We have not made changes to the contract. As far as I know the agreement is the master but there are some attachments not made public. It's those private sub agreements that can cause issues. They are private because they were between private entities. None of those clauses cantains anything like a hidden royalty. They are execution clauses (performance clauses) like the 4 year thing you hear much about.

CUU will not push a clause simply because Teck will not attemp to abuse the agreement. Teck will act within the body of the agreement. The 30 day thing is real. I told you guys in a post to expect what you might deem delays. That's because I couldn't see Teck waving the clause and rushing. They can extend this delay too. The conditions of bankability have change drastically since the contract was written so if the bankers want 30 days that's what they will get. That's unwritten but can we refuse? No, that's a third party delay. Whether this is on the 120 clock or not doesn't really matter. The point of the 30 days was to provide sufficient time for Teck to verify the facts and if that takes a month more, we won't argue. We can't argue that. We have to respect fairness. BTW, bankability doesn't just end with the numbers. It's a bit more complicated than that and can include external factors.

Once the evaluation is complete the 120 has to be agreed upon. That could take another week talking about the data and getting the nod from Teck. (These delays also bring us a lot closer to the enviro filing.) If this is not done already I would expect Teck to start talking to us claim by claim in a discovery process for all the land they are interested in. We have to agree to what data is acceptable because this helps them form a valuation. Many of those claims are very green but some have historical data that would need to be re-evaluated. Clocks can be stopped if unexpected info comes along after the fact. That nice little gold-copper claim we bought needs a detailed examination. Any attachments to the lands require scruitiny too.

Then we have to deal directly with Teck and Nova over the road. Notice very little has been said there. Since we cannot guarantee Teck takes us out, that negotiation has to be done seperately but in conjunction. Namely, Nova is a third party.

Yes, there's even more. But you get the idea now. We don't save one soul just to sink our ship. The AGM isn't that far off. Without a fast offer which is likely considering the lead time Teck had I would expect the vote then.

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. Webgogs, You have mentioned that the 'bankers' need to get involved in order to deem this FS as 'bankable'. What are you basing this on? The Teck agreement specifies what is to be deemed bankable and it doesn't involve bankers.

      1. No

        But they are capable of determing what they define bankable for purposes of an agreement

        And they did

        ...and we did it

        1. You are correct. Bankable here can only apply to the definition in the option agreement. CUU, on it's own, could never produce any kind of feasibility study that would convince any bank to lend them $ 3 billion in capital funds. That applies to any junior company with no cash flow or assets. Even Teck will probably bring in an equity partner at some point, preferably after value is added to the property via new drilling or by acquiring the EA etc. First they need to take CUU out.

    1. Hmmm, thought people would be intrigued. Ok, what if Teck said they didn't want the JV? Shoe on the other foot or so to speak.

          1. Web I might need another coffee I'm clueless about what you mean . You mean we would have another major interested and compensate teck so they get out of the portrait or back in a low % only?

            1. Replying to @simc1

              We don't want to partner with Teck! We've said that all along. The JV clause is a partnership clause. Not sure what you are missing.

            2. Replying to @simc1

              I think he's trying to say "We don't want a JV, we want to sell" so what if Teck doesn't want to buy, just backin? How do we negotiate something we don't want? (We're supposed to negotiate a new JV clause/agreement that supercedes the 2002 agreement).

              1. Replying to @JayJ

                Thanks JayJ, I guess my ignorance comes from my ''naiveté'' in regards to what I took for granted and written in stone... not much just small things such as the 120 days clause, the SC option, the liard shares transfer and all that... but since all those things are now elastic I guess anything can happen ...

      1. "Ok, what if Teck said they didn't want the JV?"

        If Teck says they didn't want the JV, then they will have to buy us out because we have a buyer, and we want out! If they don't like it tough bananas. That's the way it is.

        We wouldn't be in this situation if they had bought us out in the first place, and we didn't like it that they didn't knowing fully well we wanted OUT! They left us no choice but to find another buyer. Now they can pay more than the new JV if they don't want them.

        1. Here's supporting paragraphs of Option Agreement:

          12.1 Except in accordance with this section and subject to Tech Cominco committing the whole of the Property (or any portion thereof) on Salazar's behalf as security for required financing pursuat to Section 8.3(c), Salazar shall not transfer, convey, assign, mortgage or grant an option in the Property of its rights under this Agreement. If Salazar wishes to sell its interest in the Property or to assign its rights under his Agreement, Tech Cominco shall have the right of first refusal, which shall expire if the Back-in Right expires without being exercised.

          12.2 Salazar may assign it's entire interest and rights to this Agreement to a private company in which Salazar is the majority shareholder, or a publicly traded company of which Salazar is a shareholder and insider, free of Teck Cominco's right of first refusal under Section 12.1, provided that the company delivers, in a form acceptable to Teck Cominco, a document whereby it agrees to be bound by and comply with, the terms of this Agreement.

          1. You nailed it Liddy

            Teck does not have an option to not form a JV with CUU (or assigns) if they want to stay in the project (without a buyout)

            Revisit Para 15, Definitive Agreement

            The formation of the JV, within 60 days of the BFS (whatever that means) is mandated as well as the necessity to draft an entire agreement superceding Salazar

            Maybe that is what they are doing now

            Hope CUU has enough sense to reserve the right to sell their interest, but I am not sure I have that much faith in their business acumen here

            1. Replying to @Metacomet

              Teck does not have an option to not form a JV with CUU (or assigns) if they want to stay in the project (without a buyout)

              Unless CUU let's them...and CUU may not want to negotiate a JV because we don't want a JV, we want a buyout.

              1. Replying to @JayJ

                Sure we do

                ..and we don't care who buys us

                He who brings money gets horse

                And in this case the horse would be the JV

                That is the value vehicle we would have to vend, coupled with whatever interest we would retain after Tecks election

                A carried interest in the project with Teck funding

                You see how that might be valuable to another miner...and why it should make Teck shudder to think about it

                It is inherent in our negotiating that that possibility, by itself, should add dollars to our price

                1. Replying to @Metacomet

                  If we don't have a buyer with expectations we are negotiating for the best resale position but doing so blindly. A buyer would want very specific terms. So this clause does not seem really valuable to us and I can see why extending it into the 120 is valid
                  1. Replying to @webgogs

                    That invalidates all of our assumptions that this project has any market value whatsoever

                    If we assume that Teck has elected some percentage, based on a confirmation of our BFS, both the published and the known, then I think it is fair to assume the property might appeal to other majors

                    We will retain some percentage on any Teck action whatsoever, even if that action is a pass

                    Whatever we get to keep is what we will have to sell

                    If we think Tecks comes in for the full 75%, without a buyout, we will be in a very low burn situation, and have the earned 25% of the project to sell

                    Ernesto will just need to cover salaries, and Teck will under the JV terms, be firming up the economics of the mine out of that 360 million they need to spend to earn their interest

                    Wonder how long we would be unable to find a buyer for that interest in this environment?

                    Elmer seems to think there wouild be takers....

                2. Replying to @Metacomet

                  Sorry - I should clarify.

                  If Teck decides to just backin and not buy us out totaly - we can definitely sell to another major. However, we'd be renegotiating the contract (which supercedes the 2002 agreement). We'd be negotiating a JV that we don't want ourselves - and as such may hurt ourselves in negotiating the JV, when whoever we end up selling to (another major) may actually want different terms which may lower the price they want to pay or make them hesitant to pull the trigger.

                  I'm not saying we wouldn't sell, nor am I saying we'd negotiate a shitty JV - but I am saying that unless we have a second or third buyer in mind already and have talked to them - and know what they would want in a JV, it may end up possibly hurting us to negotiate one that a potential future buyer may not like (or at least not all the clauses that we discuss).

                  1. Replying to @JayJ

                    However, we'd be renegotiating the contract (which supercedes the 2002 agreement).

                    That is a given

                    It is in fact required under Paragraph 15

                    Actually we can chase our tails forever speculating

                    Teck is obligated to draw up JV terms withn 60 days of the BFS (whatever that means)

                    We are currently in limbo not knowing what is going on

                    I do worry that Teck has us in a very compromised position with a share price reflecting nothing but dirt

                    ...and it is the basis of why I have commited to the extent I have that there is value here, that exceeds that of dirt

                    I need to feel that we have options if Teck offers us a 50% premium on the share price

                    And I would not be surprised if that is exactly what happens

                    And I am out of trust if these clowns can't capitalize on their own contract terms



                  2. Replying to @JayJ

                    We'd be negotiating a JV that we don't want ourselves - and as such may hurt ourselves in negotiating the JV, when whoever we end up selling to (another major) may actually want different terms which may lower the price they want to pay or make them hesitant to pull the trigger.

                    The definitive joint option JV that we would be negotiating at this point would have to embody all the terms and conditions of the existing Agreement. The conditions that Copper Fox now has where they have to report to Teck, and get their permission to hire contractors, etc., those conditions would flip and Teck would report in the same way to Copper Fox.

                    Teck has to prepare this JV and give it to Teck before the 60 days are up, but, there is no time limit on how long Copper Fox can then take to review it. Until they review it and agree on the wording of the JV the old Agreement remains in place (with conditions flipped.)

                    So, if this were a big problem I certainly think Copper Fox management could find a way to stretch that process out for quite some time.

                    1. Replying to @Prospekt

                      Hmmm this is a good point. Seems like a double edged sword - on one hand we can "review" a JV for as long as we want (and won't have the problem I said earlier) but on the other hand... we can review a JV for as long as we want even if Teck has made their decision.

                      Hope it doesn't come down to that and Teck just takes us...Even with planned contingencies, this is taking far far longer than anticipated. I don't like having my investments based on hope - but I hope this doesn't take much longer.

                    2. Replying to @Prospekt

                      The problem is that they could agree on a novation that would not incorporate any of the advantages that we now have

                      I have serious concerns about how they might redraw the agreement

                      I really don't know what the current thought process is that is being followed

                      Wish they had Salazar available to help them now

                    3. Replying to @Prospekt

                      "The definitive joint option JV that we would be negotiating at this point would have to embody all the terms and conditions of the existing Agreement. The conditions that Copper Fox now has where they have to report to Teck, and get their permission to hire contractors, etc., those conditions would flip and Teck would report in the same way to Copper Fox.

                      Teck has to prepare this JV and give it to Teck before the 60 days are up, but, there is no time limit on how long Copper Fox can then take to review it. Until they review it and agree on the wording of the JV the old Agreement remains in place (with conditions flipped.)

                      So, if this was a big problem I certainly think Copper Fox management could find a way to stretch that process out for quite some time."

                      So in a JV, the worst thing that can happen is that CUU retains their fixed interest plus the Liard shares until earned back at which time the percentage of the profits remains in effect for the lifetime of the mine or, and I mean OR, the mining of the surrounding properties that were or were NOT included in the agreement are negotiated....

                      Seems to me that's a boatload of money and is worth quite a bit more than some are thinking.

                      I'm wondering who has who by the marbles now...

            2. Replying to @Metacomet

              Cuu would do the exercise just to fully define our rights but this might not satisfy a buyers expectations so it's not a practical exersize unless we are already engaged with a buyer who's firm
      2. "Ok, what if Teck said they didn't want the JV"

        Hey WG, you having some Toddy or something? Your question is making me dizzy. At first I read it as Teck not approving of the JV we found to buy us out since we have no interest in being miners (whatever % Teck did not option for) so I gave you my response. Then I started to wonder how come sim1 got all confused and I started reading your posts again and thought maybe, you meant "shoe on the other foot" as literally, Teck does not want to back in at all because they don't want to partner with any JVs.

        In that instance, they can a) walk away (which would make many of us very unhappy or b) buy us out 100% and JV option goes bye bye.

        So which answer were you really looking for?

        1. We've told them we are reluctant partners. On a back in scenario we have no choice but to for the jv and we have to try structure it for resale. Will teck cooperate? How do we get the right terms? Do we waive the 60 days in leu of a new deal? So many questions
          1. That's why we pay our lawyers the big bucks, to make sure the new Agreement is in CUU's best interest and most beneficial/profitable.

        2. In that instance, they can a) walk away (which would make many of us very unhappy)

          That would make me very happy - 100% all for us!

          1. "That would make me very happy - 100% all for us!"

            Kits09: We already own 100% of Schaft Creek plus more. However, CUU is an exploration company and we are not qualified and experienced to run a mine. In addition, it would cost billions of dollars to build a mine, monies we don't have. Please do your due diligence.

                1. Replying to @Nav2006

                  I would think that teck walking away would be quite the long ride.

                  Our SP would take a phenomenal hit as Teck walking away would tell investors that the project is not that enticing now or in the near term.

                  EE may be a billionare but he probably isn't big enough himself to fund buiding the project. We know next to nothing about how deep his pockets really are - which tells me they aren't that deep or at least we can't count on them being deep enough. He could probably fund the road construction which would do a lot to lower our field costs in the long, long run.

                  Meanwhile we would need to drill and drill and drill in new, better places (richer, shallower) that would supersede the issue of the original project's low desirabilty. That could take years and years, or at Elmer's pace of drilling, RE's, and FS's, decades.

                  And then what, turn around and try to find a buyer?

                  We've talked and talked about the what ifs of Teck walking away and I dont' think we've ever really rationalized that into a slam dunk for us. Maybe we could sell the whole project for a better shareholder value right after Teck walks.

                  Retaining some of the Schaft Creek Mineralized Trend to unzip later with a cash flush CUU 2.0 and new share structure, maybe another possibility.

                    1. Replying to @Metacomet

                      "Plan b .. my take it would be to drill waste rock , there are specific areas that would be drilled as pet Elmer. He pointed the spots that need to go deeper and the extra drills will show measures resources. At this point there are no talks with any other majors as until teck desides it all unkown. What I garnered from Elmer in his talking and mannerism is that he knows what will happen and is prepared."

                      Plan B is to drill more waste rock to improve BFS numbers. No talks with other majors in the works. So, there's a chance we'll be high and dry if Teck decides to walk away and continue drilling, drilling, drilling with our sp going down, down, down till when pigs could fly. IMO

                      Sorry guys, don't mean to be so negative, but realistically it could be a possibility and very worrisome.

                      Metacomet

                      Reply in Copper Fox Metals Inc.

                      ...but, but, but What about Plan B

                  1. Replying to @chappy726

                    Not that I want to get my nose surgically removed from Tecks butt, but I really hope they take the whole thing prior to day 120, if not we could be looking at years as you mentionned, and that would probably mean a share consolidation and that is rarely a good thing. At what cost would people be willing to wait for another buyer? I would rather have the cash in hand by this summer than go through another round of waiting game, even if it means a slightly lower payoff.

                    GLTA

              1. Replying to @Metacomet

                "That would make me very happy - 100% all for us!

                But we could get a lot more for it than we could for 25%"

                Maybe so, Meta,

                But IMO, if Teck did not at least back-in at 20%, CUU's sp would nose dive. Even with NR that says CUU is in discussions with Teck and a decision is expected within 120 days, we are still at .82 cents.

                In addition, it's already been established in previous posts that before we can look for other majors, we would need to go back and continue drilling and prove up more holes and improve the numbers in the BFS. That costs more money, which is more share dilutions and time and that is maybe even worse than dilution because we all know that one year drilling and a revised BFS could take another 2 years or more. Plus, we'll all go through the living hell of the past year again. Is it worth it? What will happen to our sp?

                At the same time, CUU has several properties to do more drilling etc. around SC. Focusing on that would be a much larger financial deal than 25% of SC.

                Plus, don't forget the Arizona properties need to be developed too. Hopefully, this time we are better prepared as to what to expect, and do a better job and make more money there.

                On the above points, I hope that Teck makes CUU a fair price offer for at least SC, preferably 100% of it.

                I would be very worried and concerned if Teck did not at least back-in.

                1. Replying to @Liddy77

                  But IMO, if Teck did not at least back-in at 20%, CUU's sp would nose dive. Even with NR that says CUU is in discussions with Teck and a decision is expected within 120 days, we are still at .82 cents.

                  Here`s my thinking on whether Teck would walk. Imo, I think the possibility of that is next to zero. Even if they think the grades are still to low ( very unlikely as the BFS has demonstrated it is economical with 1/2 the deposit ) the worst that could happen is they back in for a percentage - most likely 40% and at least spend a little 10-20m to firm up the 171M tons of waste and drill the other areas of potential interests.

                  There is nothing in the back-in agreement that saids they have to spend the entire 252M (back in agreement at 40%). They only have to spend that much if they want to retain their 40% interest. If they at least spend enough on 1 year of further exploration they could then decide if it is worthwhile to continue or walk away. With what is known to date about the titans, mira and exploration drill holes that has hit mineralization in the Discovery zone wouldn`t they want to take a chance this district could host enormous potential for higher grades and perhaps a bigger deposit? What is spending another 10-20M to Teck?

                  Furthermore, I don`t think all the scenarios about Teck dragging this out makes much sense either. In five more months we will be entering our field work season. By the end of April at the latest they should wrap this up if they want to do any more drilling in SC otherwise they will waste another year without further work necessary to be done. Then there is the issue of our place in the line up in the power grid. If this mine is going to be built can they put off this decision for a few more years? It takes 5 years to build the mine so if they want to do more work to be sure of a production decision they have to do it now (this season imho) I`m sure that when BC Hydro has completed the NTL they will want paying customers on it asap. Its first come first served and other mining projects will be competing for that coveted power spot ( which is another reason imho, that Teck has to take us out soon ).

                  1. Replying to @cbew

                    "Here`s my thinking on whether Teck would walk. Imo, I think the possibility of that is next to zero. Even if they think the grades are still to low ( very unlikely as the BFS has demonstrated it is economical with 1/2 the deposit ) the worst that could happen is they back in for a percentage - most likely 40% and at least spend a little 10-20m to firm up the 171M tons of waste and drill the other areas of potential interests.

                    There is nothing in the back-in agreement that saids they have to spend the entire 252M (back in agreement at 40%). They only have to spend that much if they want to retain their 40% interest. If they at least spend enough on 1 year of further exploration they could then decide if it is worthwhile to continue or walk away. With what is known to date about the titans, mira and exploration drill holes that has hit mineralization in the Discovery zone wouldn`t they want to take a chance this district could host enormous potential for higher grades and perhaps a bigger deposit? What is spending another 10-20M to Teck?"

                    cbew: IMO I doubt Teck would walk either. If that was on their agenda, they wouldn't be spending so much time with CUU in the past or presently. However, when you talk about proving the mineralization in the Discovery Zone, that it is indeed an enormous potential higher grade and perhaps bigger deposit, can CUU really use the $252M for the 40% interest from Schaft Creek buy-in on other zones other than Schaft Creek?

                    1. Replying to @Liddy77

                      I could be wrong but doesn`t the Discovery zone lie withing 2kms of SC so it would have to be included in any back-in option? Or another possibility is that when another JV agreement is formed these outside zones 100% owned by CUU can be included if Teck spends the back in money on them.

                      1. Replying to @cbew

                        I'm not positive of whether the Discovery Zone lie within 2 kms. of SC. However, if it is included, wouldn't that make it more than 40%? I will do some research but will anyone out there who knows the answer, please advise. Thanks.

                        1. Replying to @Liddy77

                          "I'm not positive of whether the Discovery Zone lie within 2 kms. of SC. However, if it is included, wouldn't that make it more than 40%? I will do some research but will anyone out there who knows the answer, please advise. Thanks."

                          The Discovery zone is within the 2 km area of interest and the 40% does not change.


                          1. Replying to @Riskkee

                            Is there another deal out there for Teck that is as good as this one? This may be a mining district that could last for a century. They want to get into copper. We have copper. They want a safe jurisdiction. We have that.

                            They staked claims all around us, so they obviously see the potential.

                            Cat scans for the Teck crew if they walk.

                      2. Replying to @cbew

                        More importantly, the Discovery zone is 80% located within the Schedule A claims, as is 100% of Mike. I'm not sure how that would be negotiated under the Agreement. The Sched A lands go with the project n'est pas?

                        Claims, 2km AoI, Zones, SCMT (Jan 2013)

                        Map showing 2x2km adjacency (thick maroon line) and June 2012 claims. Also shown is the Schaft Creek Mineralized Trend and the known mineralized zones. Sched A claims are outlined in hot pink

                        http://www.flickr.com/photos/60356448@N04/8399869774/in/photostream/lightbox/

                        1. Replying to @chappy726

                          There's exactly 0% chance that Teck walks. Zero.

                          What an agreement would look like is up to wild speculation, but I'm confident that we'll get a good deal. Never said when though. :)

                          In the meantime... Wham-O! Another frisbee please.

                        2. Replying to @chappy726

                          I hinted at this question in the previous post in this thread but maybe I need to be more direct...

                          If most of Discovery and all of Mike are part of the Schedule A lands in the Agreement, do they just automatically go with the project with any earn in percentage?

                          I breezed thru the Agreement again and there does not seem to be any language on anything smaller than 'the Property" (Sched A lands). If so, that is all the more reason for Teck to earn in a big percentage (at least).

                      3. Replying to @cbew

                        You are correct cbew. Riskee was kind enough to direct me to where I could find a Schaft Creek map and educated me on all the properties that go with Schaft Creek. And yes, Paramount and Mike Zones are all part of Schaft Creek.

                    2. Replying to @Liddy77

                      Anyone know if they did walk and took $1M of shares in CUU instead - at what price they'd get them at? Presumably there will be some massive fluctuations during any decision they make. Though - I'm not really expecting that option, just wondering.

                      1. Replying to @JayJ

                        The Agreement states that it would be based on the average closing price of the shares over the last 20 days of public trading.