    Copper Fox Reports 2012 Annual Financial Results (cnw)

    VANCOUVER, Feb. 14, 2013 /CNW/ - Copper Fox Metals Inc. ("Copper Fox" or the "Company") (TSX-V: CUU) is pleased to announce its operating results for the 2012 year-end. During the year, the Company completed an updated resource estimate, an exploration program and continued the environmental assessment application process on the Schaft Creek deposit. Discussions were undertaken with BC Hydro in an effort to secure a source of electrical power for the Schaft Creek project and the Company made several property acquisitions in British Columbia and Arizona. Subsequent to year end, the Company announced the results of a positive feasibility study and the filing thereof on www.sedar.com.

    Copies of the financial statements and notes and related management discussion and analysis may be obtained on SEDAR at www.sedar.com, the Company web site at www.copperfoxmetals.com or by contacting the Company directly. All amounts are in Canadian dollars unless otherwise stated.

    Highlights

    Resource Estimate

    In May 2012, Tetra Tech Wardrop ('Tetra Tech') completed the Updated Resource Estimate for the Schaft Creek deposit including the Paramount and Liard zones. For a more detailed review of the Updated Resource Estimate, please see Copper Fox's news release dated May 31, 2012.

    Feasibility Study

    Subsequent to the year ended October 31, 2012, the Company announced the results of a positive Feasibility Study on the Schaft Creek project in December 2012, and subsequently filed on www.sedar.com in February 2013.

    The first step in determining mineral reserves is to use only the Measured and Indicated resources in combination with certain input parameters and the Whittle Mine Optimization software program to generate a considerable number (in the order of 40-50 runs) of proposed pit shells. From the 40-50 runs, mining engineers select the pit shell with the most attractive economics and then commence to develop the actual proposed mine plan to be used in the Feasibility Study. Invariably, the process of establishing reserves normally leaves a considerable portion of the Measured and Indicated mineral resources outside the pit shell. This process in general explains the significant difference between the mineral resources and the mineral reserves estimated for the Schaft Creek project. If at a later date, the remaining resources in the Schaft Creek deposit not initially classified as reserves at the time of the feasibility study, can be deemed economically viable they would be included into the reserve category, thus extending mine life.

    The feasibility study was based on an open pit mine with a nominal 130,000 tonne per day ('tpd') milling capacity over a 21 year mine life representing a 30% increase from that proposed in the Preliminary Feasibility Study prepared in September 2008, with only a 20% increase in the estimated Capex.

    Highlights of the Feasibility Study (all amounts are stated in Canadian dollars):

    • Nominal 130,000 tpd open pit mine feeding a concentrator with two Semi Autogenous Grinding ('SAG') mills;
    • Initial Capital Cost ('Capex') totals $3.256 billion, which includes contingencies of $374 million;
    • Sustaining Capex totals $1.240 billion over the proposed mine life, including $200 million for BC Hydro tariff;
    • Life-of-Mine ('LOM') metal production contained in concentrates totals 4.88 billion pounds ('lbs') of copper, 4.21 million ounces ('oz.') of gold, 214.92 million lbs of molybdenum and 25.10 million oz. of silver;
    • 5 years pre-production period followed with a productive mine life of 21 years;
    • Proven and Probable Mineral Reserves total 940.8 million tonnes containing 5.6 billion lbs of copper; 5.7 million oz. of gold 363.5 million lbs of molybdenum and 51.7 million oz. of silver on the basis of drill data up to May 23, 2012;
    • Within the pit shell there is a total of 171.16 million tonnes of inferred resource grading 0.25% copper, 0.018% molybdenum, 0.164 grams per tonne ('gpt') gold and 1.58 gpt silver which for purposes of this study must be treated as waste rock;
    • LOM average mill feed grades 0.271% copper, 0.191 gpt gold, 1.716 gpt silver, 0.018% molybdenum and a copper equivalent ('CuEq') of 0.441%. The CuEq is back calculated based on how much in situ copper is required to provide the same after recovery value to equal the combined metals value after recovery. The formula is: CuEq = NSR / (CURec*NSPcu*22.046) NSR=RecCU*Cu grade*NSPcu*22.046+RecMO*Mo grade*NSPmo*22.046+RecAU* Au grade*NSPau+RecAG*AG grade*NSPag , where "Rec" is the recovery based on the recovery formula and grade is in situ with no loss or dilution applied.



    Based on recommendations in the Feasibility Study the Company is currently considering programs to enhance the economics of Schaft Creek including:

    i) a diamond drilling program at Schaft Creek to upgrade the 171.16 million tonnes of Inferred resource, that lie within the pit shell, to a Measured or Indicated Resource; and

    ii) additional metallurgical testwork to increase metal recoveries and reduce processing costs.

    2012 Exploration Program

    The 2012 exploration program was designed specifically to avoid any work (diamond drilling, metallurgical test work, etc.) on the Schaft Creek deposit which if successful would have dictated a suspension to update that portion of the Feasibility Study. The objective of the 2012 exploration program was to test the mineral potential of the Schaft Creek Mineral Trend to host additional copper deposits. This trend is located on the west side of Mount LaCasse and extends for a distance of approximately 7 kilometres north of the Schaft Creek deposit. The drilling on the Discovery zone intersected broad intervals of significant copper-gold-silver mineralization that shows a strong correlation to the chargeability signature, a similar relationship to that seen at the Schaft Creek deposit. A considerable amount of diamond drilling would be required on the Discovery zone to establish the significance of this discovery in terms or dimensions and average grade. Mapping and sampling over a 6 kilometer long area from the south end of the ES zone to the north end of the GK zone located a significant number of outcrops and boulders that contain copper oxide and copper sulphide minerals.

    Bell Copper

    During the year, the Company announced that it had entered into a binding offer to purchase from Bell Copper Corporation ('Bell') 100% of Bell's interests in the Van Dyke copper deposit and the adjacent Van Dyke BLM lode claims located in Miami, Arizona and the Sombrero Butte property located near Mammoth, Arizona by paying to Bell CDN $2,000,000 in cash and assumption of Bell's continuing obligations in respect of the properties.

    The Company completed the acquisition of the Sombrero Butte property and the Van Dyke BLM Claims for the purchase price of CDN $1.0 million.

    The acquisition of Bell's additional interests in the Van Dyke copper deposit is pending subject to Bell completing the acquisition pursuant to the terms of the purchase and sale and royalty agreement. For more details please refer to Copper Fox's news release of July 9, 2012.

    Land Acquisitions

    During and subsequent to the year ended October 31, 2012; the Company acquired 89 mineral tenures (21,504.47 hectares) located around and contiguous to the Schaft Creek project.

    Subsequent to year end, Copper Fox located (staked) an additional 22 mineral lode claims contiguous to the Sombrero Butte project to protect the extension of the mineralized breccia pipes previously explored by Bell. The Sombrero Butte project now consists of 60 lode claims and covers 3,342 acres.

    Selected Financial Information

    Net Loss Net (loss)/income per share -

    basic and diluted
    2012
    Fourth Quarter $ (812,324) $ 0.00
    Third Quarter $ (1,328,328) $ 0.00
    Second Quarter $ (514,292) $ 0.00
    First Quarter $ (554,254) $ 0.00
    2011
    Fourth Quarter $ (1,018,883) $ (0.01)
    Third Quarter $ (504,862) $ 0.00
    Second Quarter $ (2,380,574) $ (0.01)
    First Quarter $ (726,833) $ 0.00



    Liquidity and Capital Resources

    Copper Fox operates in a capital intensive industry in which the demands for capital to finance exploration and development of its Schaft Creek property as well as corporate overheads generally occur far in advance of the project being put into production and generating cash flow. The financial requirements of Copper Fox related to the potential development of the Schaft Creek project are mitigated to some extent by the obligations of Teck should they exercise their earn back right on the Schaft Creek property.

    The Company's working capital was $5,139,258 at October 31, 2012 inclusive of an increase to prepaid expenses and deposits relating to an agreement on the Schaft Creek property and an increase in accounts receivable with respect to a tax credit claimed.

    During the year ended October 31, 2012, the Company raised a total of $17,548,125 from the completion of private placements totaling $17,205,000, 725,000 options exercised for total proceeds of $248,000 and 126,833 warrants for total proceeds of $95,125. In addition, the Company issued 1,272,727 common shares for repayment of a loan of $1,400,000. Additional funds will be required to complete the current planned activities and the Company may need to issue additional equity in connection with any development of the project (Refer to Teck Earn Back Option).

    Copies of the financial statements and notes and related management discussion and analysis may be obtained on SEDAR at www.sedar.com, our Company web site at www.copperfoxmetals.com or by contacting the Company directly. All amounts are in Canadian dollars unless otherwise stated.

    About Copper Fox

    Copper Fox is a Canadian-based resource development company listed on the TSX Venture Exchange (TSX-V: CUU) with a corporate office in Calgary, Alberta and an operations office in Vancouver, British Columbia. Its major asset is the Schaft Creek copper, gold, molybdenum and silver deposit located in northwestern British Columbia, Canada for which a positive Feasibility Study was recently completed and filed on www.sedar.com.

    Copper Fox holds title and a 100% working interest in the Schaft Creek project consisting of 56,267.54 hectares (139,040 acres). Included in this total are the "Schedule A" mineral tenures originally conveyed to Copper Fox pursuant to the Teck Option Agreement, which consist of 8,334.34 hectares (20,594 acres). The "Schedule A" mineral tenures are subject to a 3.5% Net Profits Interest held by Royal Gold, Inc., a 30% carried Net Proceeds Interest held by Liard and, together with the additional mineral tenures obtained by Copper Fox within the "Area of Interest" provided for in the Teck Option Agreement, an earn back option held by Teck. On completion of the Feasibility Study, Copper Fox earns Teck's 78% interest in Liard. Teck's earn back option to acquire either, 20%, 40% or 75%, of Copper Fox's interest in the Schaft Creek Project is triggered upon delivery of a "Positive Bankable Feasibility Study" (as defined) to Teck after which they have 120 days to make a decision. Should Teck elect to exercise its option for 75%, Teck is required to fund subsequent property expenditures up to a total of 400% of those incurred by Copper Fox ($85.34 million to December 31, 2012) and use its best efforts to arrange for project financing, including the Copper Fox portion. For full details of the Teck earn back option please refer to the Company's website www.copperfoxmetals.com.

    The remainder of Copper Fox's registered interests in mineral tenures in British Columbia total 47,933.19 hectares (118,445 acres). These interests have been acquired by Copper Fox through mineral tenure acquisitions and mineral tenure purchase agreements subsequent to Copper Fox entering into the Teck Option Agreement. Certain portions of these registered mineral tenures are subject to inclusion within the Schaft Creek Project pursuant to the terms of the "Area of Interest" provision of the Teck Option Agreement.

    Additionally the Company holds, through wholly-owned subsidiaries, mineral tenures located in Pinal County, Arizona (the 'Sombrero Butte Copper Project') and in Miami, Arizona (the 'Van Dyke BLM Claims'). For further information on these mining projects please refer to the Company's web site at www.copperfoxmetals.com.

    On behalf of the Board of Directors

    Elmer B. Stewart

    President and Chief Executive Officer

    Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

    Cautionary Note Regarding Forward-Looking Information

    This news release contains "forward-looking information" within the meaning of the Canadian securities laws. Forward-looking information is generally identifiable by use of the words "believes," "may," "plans," "will," "anticipates," "intends," "budgets", "could", "estimates", "expects", "forecasts", "projects" and similar expressions, and the negative of such expressions. Forward-looking information in this news release includes statements about the results of a positive Feasibility Study for the Schaft Creek project; the technical and financial viability of a 130,000 tonne-per-day copper mining and processing operation at Schaft Creek; economic potential of the Schaft Creek mineral deposit; the existence and size of the mineral deposit at Schaft Creek; recommended future diamond drilling programs; potential upgrade of inferred resource currently treated as waste to either measured or indicated mineral resources; the productive mine life of the Schaft Creek project; average annual copper production in concentrates; initial and sustaining capital costs; LOM site operating cash costs and copper production costs; potential expansion and development of the project; opportunities to lower operating and capital costs and increase capital revenue; the length and scope of work for the pre-production period; additional metallurgical testwork to pursue opportunities to increase metal recoveries and reduce processing costs; use of new floatation technology which could ultimately reduce construction and capital costs while at the same time reducing operating costs; timing and amount of estimated future production; a Province of British Columbia Environmental Assessment Application and a Federal Environmental Impact Statement; a British Columbia Environmental Assessment Certificate and Federal environmental approvals; the construction of the NTL and timing thereof; discussions with BC Hydro on the terms and conditions surrounding participation and purchasing of electrical power from the NTL; the development schedule for the project; additional exploration to the east and north of the Paramount zone and north of the Liard zone; the process and expectations for metal recovery; estimated metal production over the life of the mine; estimated LOM average metal content, impurity element levels and, as applicable, moisture content; design, construction and capacity of a tailings storage facility; estimated capital costs; life of mine copper production total and cash costs per produced pound; projected future metal prices; the delivery of the Positive Bankable Feasibility Study and Feasibility Notice to Teck; the commencement of the 120 day period for which Teck may exercise its Back-in Right under the Teck Option Agreement; the aggregate incurred Expenditures; the Option to acquire the Indirect Holdings in Liard Copper Mines; the activity related to the Schaft Creek project during the 120 day period; establishment of work programs; the quantum and quality of porphyry style copper-gold-silver-molybdenum deposits at the Schaft Creek property; the potential to find additional porphyry style copper deposits within the Schaft Creek property; the acquisition of Bell Copper's Sombrero Butte property in Arizona and the pending acquisition of Bell Copper's Van Dyke property in Arizona; ongoing obligations of Copper Fox in connection with the Van Dyke and Sombrero Butte acquisitions; expected capital requirements to continue planned activities; expected sources and the adequacy of required capital resources; the timing and scope of expected diamond drilling; potential existence and size of mineralization within the Schaft Creek project; estimated timing and amounts of future expenditures and "earn-back" options; geological interpretations and potential mineral recovery processes. Information concerning measured mineral resources, indicated mineral resources and inferred mineral resources also may be deemed to be forward-looking information in that it reflects a prediction of the mineralization that would be encountered if a mineral deposit were developed and mined.

    In connection with the forward-looking information contained in this news release, Copper Fox has made numerous assumptions, regarding, among other things: the economic models for the Schaft Creek project, including the NPV and ROV models; the calculation of estimate capital costs of the project; costs of production; success of mining operations; projected future metal prices; engineering, procurement and construction timing and costs; the timing and obtaining of permitting and approvals; the due delivery of the positive Feasibility Study to Teck pursuant to the Teck Option Agreement; the acceptance by Teck of the positive Feasibility Study as a "Positive Bankable Feasibility Study" as defined in the Teck Option Agreement; the commencement of the 120 day period for Teck to exercise its earn back rights; that Expenditures have been incurred in accordance with the Teck Option Agreement and in Company's expected quantumthe potential mineralization in the Schaft Creek deposit; the geological, metallurgical, engineering, financial and economic advice that Copper Fox has received is reliable, and is based upon practices and methodologies which are consistent with industry standards; and the continued financing of Copper Fox's operations. While Copper Fox considers these assumptions to be reasonable, these assumptions are inherently subject to significant uncertainties and contingencies. Additionally, there are known and unknown risk factors which could cause Copper Fox's actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information contained herein. Known risk factors include, among others: the results of the positive Feasibility Study may not lead to the development of a mine at Schaft Creek or commercial mining operations; the project development plans and timing for Schaft Creek as outlined in the Feasibility Study may not occur as currently anticipated, or at all; Teck may not accept that the delivery of the positive Feasibility Study constitutes delivery of a "Positive Bankable Feasibility Study" as defined pursuant to the terms of the Teck Option Agreement; the 120 day period that Teck has to exercise its earn back rights may not have commenced; the "Expenditures" may not constitute Expenditures as defined in the Teck Option Agreement in the quantum anticipated by Copper Fox, or at all; inferred resources, currently treated as waste, may never be upgraded to a high category of resource; uncertainty of estimates of capital and operating costs, recovery rates, production estimates and estimated economic return; uncertainties related to the estimated mine life and potential extension thereof; the possibility of delays and cost overruns in engineering, procurement and construction of the project and uncertainty of meeting anticipated project milestones; the Environmental Assessment Application and Federal Environmental Impact Statement may not be completed timely manner, or at all, or provincial or federal environmental approvals may not be obtained in a timely manner, or at all; the possibility that future obligations with respect to the Van Dyke and Sombrero Butte properties may not be met on a timely basis, or at all; Copper Fox may not proceed or continue with activity on the Schaft Creek project as currently planned; additional metallurgical testwork may not be completed, nor result in increased metal recoveries; further exploration at Schaft Creek may not occur as currently anticipated, or at all; the actual mineralization in the Schaft Creek deposit may not be as favourable as suggested; another deposit may never be discovered on Copper Fox's property, or contain anticipated mineralization, or mineralization of any significance at all; the possibility that future drilling on the Schaft Creek project may not occur on a timely basis, or at all; fluctuations in metal prices and currency exchange rates; conditions in the financial markets and overall economy may continue to deteriorate; uncertainties relating to interpretation of drill results and the geology, continuity and grade of mineral deposits; uncertainty of the metallurgical testwork; the uncertainty of the estimates of capital and operating costs, recovery rates, and estimated economic return; the need to obtain additional financing and uncertainty as to the availability and terms of future financing; the possibility of delay in exploration or development programs or in construction projects and uncertainty of meeting anticipated program milestones; uncertainty as to timely availability of permits and other governmental approvals.

    A more complete discussion of the risks and uncertainties facing Copper Fox is disclosed in Copper Fox's continuous disclosure filings with Canadian securities regulatory authorities at www.sedar.com. All forward-looking information herein is qualified in its entirety by this cautionary statement, and Copper Fox disclaims any obligation to revise or update any such forward-looking information or to publicly announce the result of any revisions to any of the forward-looking information contained herein to reflect future results, events or developments, except as required by law.

    SOURCE: Copper Fox Metals Inc.

    For further information:

    Investor line 1-866-913-1910 or J. Michael Smith, EVP, at 1-604-689-5080.

    Thank you for choosing TD Waterhouse. At TD Waterhouse we are committed to providing you with the information, tools and resources you need to stay on top of the markets and invest with confidence.

    To change your alert settings or to unsubscribe from the alerts service, please login to WebBroker.

    TD Waterhouse Canada Inc. is a subsidiary of The Toronto-Dominion Bank. TD Waterhouse Canada Inc. - Member of the Canadian Investor Protection Fund. These products and/or services are only offered in jurisdictions where they may be lawfully offered for sale.

    ©2013 CTVglobemedia Publishing Inc. All rights reserved.
    1. the Company announced the results of a positive Feasibility Study on the Schaft Creek project in December 2012, and subsequently filed on www.sedar.com in February 2013.

      ....

      On completion of the Feasibility Study, Copper Fox earns Teck's 78% interest in Liard. Teck's earn back option to acquire either, 20%, 40% or 75%, of Copper Fox's interest in the Schaft Creek Project is triggered upon delivery of a "Positive Bankable Feasibility Study" (as defined) to Teck after which they have 120 days to make a decision.

      so..... are they taking 30 days to put the ''bankable'' sticker on it so we get our liard shares? OR..... where are our darn liard shares?

        1. The Liard shares are fait accomopli

          Storacle had a conversation with Elmer and this was what he said:

          Elmer said that Yes the feasibility study has been delivered to Teck and that yes, Copper Fox believes it to be bankable.

          He added. Does Teck think it is bankable? We are waiting to see if Teck agrees or disagrees with the feasibility.

          If they agree with the feasibility, then the Liard shares should be transfered.

          We have to conclude that the Liard shares will only be transferred if Teck "agrees" with the feasibility. The decision has not been made yet.

          --http://agoracom.com/ir/CopperFoxMetals/forums/discussion/topics/564334-year-end-financials/messages/1776063#message

          This post isn’t available.
          1. "We have to conclude that the Liard shares will only be transferred if Teck "agrees" with the feasibility. The decision has not been made yet."

            I think Teck is aware that in the event they want to reneg on the Bankability issue, that would force CUU to go to court

            Teck had way too much particpation thruout the FS exercise, both with Tetra Tech and Merit to think they would prevail on those pretty much cut and dried numbers that were intentionally understated to preclude such an outcome

            They may well decide that the economics are too skimpy and opt not to back in, although I would find that highy unlikely

            But I don't think there is much on an option for them to not convey the Liard interests

            ...an interest that it would appear that they would not put much value in anyway, should they opt to not preoceed with Schaft

              1. Replying to @abullion

                I was saying that in the event Teck did not back in, they would have also concluded that there would not be a lot of value in the Liard interests

                Extending the logic of why they would pass, which I do not expect to happen

            1. Replying to @Metacomet

              "But I don't think there is much on an option for them to not convey the Liard interests

              ...an interest that it would appear that they would not put much value in anyway, should they opt to not preoceed with Schaft"

              If the value is that low im sure Xstrata would of sold there portion by now...

            2. Replying to @Metacomet

              Met, Teck has the right, at their sole discretion, to accept or reject the FS as bankable. they have 30 days to do it.

              If we had to take them to court and try to prove the intent of the contract or the implicit approval because of their participation, it would take years. I don't have years and you may not either. who knows.

              Much better to accomodate them now and work our way into the drivers seat. That way there is a pathway to a conclusion.

              I want to see this done in a successful way, in a reasonable timeframe.......chunky

              1. Replying to @chunkytoast

                Teck has the right, at their sole discretion, to accept or reject the FS as bankable. they have 30 days to do it.

                No they do not

                You really have to study the applicable paragraphs

                The parameters for defining a bankable FS were stipulated and they were met

                No one in their right mind would have undertaken what Salazar did if the results were strictly and arbitrarily at the sole discretion of the other party

                1. Replying to @Metacomet

                  Meta is right. The term bankable is defined in the agreement. It's not arbitrary.. It's not about actually going to court - it's that if we did, we'd win and they'd ruin their name - so why bother?

                  Below is what defines it (as well as the rest of section 5.5(b)(ii) which we've gone over in the past. As far as I can tell, we've done all this - so how can it be rejected...

                  ____________________________________________________________________

                  The report shall contain all geological, engineering, operating, economic and other relevant factors which are to be considered in sufñcient detail that the report could reasonably serve as the basis for a decision by an independent commercial fmancial institution to finance the development of the Property for commercial production. The report shall examine' the following matters: ore reserves; mining methods; metallurgy and processing (including metal recovery); environment, tailings and waste disposal; capital and operating cost estimates; manpower, social and community affairs; transportation methods and costs; marketing; project financing alternatives; a sensitivity analysis; such other matters as are appropriate. The report shall include at least the following information:

                  (c) a description of that part of the Property to be covered by the proposed mine;
                  (d) the estimated recoverable reserves of minerals and the estimated composition and content thereof;
                  (e) the proposed procedure for development, mining and production;
                  (i) results of ore amenabilìty tests;
                  (g) the nature and extent of the facilities proposed to be acquired which may include mill facilities, if the size, extent and location of the ore body makes such mill facilities feasible, in which event the study shall also include a preliminary design for such mill;
                  (h) the .total costs, including capital budget, which are reasonably required to purchase, construct and install all structures, machinery and equipment required for the proposed mine, including a schedule of timing of such requirements;
                  (i) all environmental impact studies and costs;
                  (j) the pen'od which it is proposed the Property shaçll be brought to commercial production;
                  (k) such other data and information as are reasonably necessary to substantiate the existence of an ore deposit of suñicient size and gïade to justify development of a mine, taking into account all relevant business, tax and other economic considerations; and working capital requirements for the initial four months of operation of the Property as a mine or such longer period as may be reasonably justifed in the circumstances.

                  ____________________________________________________________________

                  1. Replying to @JayJ

                    I guess its just about letting them the time to read the report and agree with the conclusions... there are billions involved here...

              2. Replying to @chunkytoast

                "Much better to accomodate them now and work our way into the drivers seat. That way there is a pathway to a conclusion."

                Exactly Chunky. You don't drop the BFS off at the door and not leave, or expect to leave with the Liard shares in hand. It just doesn't work that way. Things take time and some on here remind me of the 6 year old kid that demands his Saturday allowance at his parents bedroom door around 12:01am.

                I can wait as long as we see progress and a reasonable timeframe for me is as long as it takes to get my $4.19 a share.

                1. Replying to @CanadaGrant

                  You don't drop the BFS off at the door and not leave, or expect to leave with the Liard shares in hand. It just doesn't work that way.

                  Is that what we did?

                  Teck wasn't involved with every bit of data and the preparation of every report up to and including closely working with Tetra Tech and then Merit on the FS?

                  They were suddenly confronted with this massive report, that was new to them and now they must take months to decide it is fits the contract minimum that has been flashing like a neon light above everybodies head for years?

                  And then, after months of review of a report that they had as much involvement with as CUU, they may deign to accept that CUU has earned their contract interest

                  ...and endorse over the interests that were cleraly earned from the get go

                  You folkks are a heck of alot more trusting and patient than I

                  Teck does not want to release the shares because that might trigger a bidding war as it is validation of the project

                  As long as they can avoid that , they can control the dialogue and the CUU share price

                  Good luck folks, you will need it being this naive

                  1. Replying to @Metacomet

                    Teck does not want to release the shares because that might trigger a bidding war as it is validation of the project

                    As long as they can avoid that , they can control the dialogue and the CUU share price

                    Exactly, management needs to bring our stock price up, not let it wallow in the basement. It isn't helping anyone but Teck to leave the price where it is. I know, it is the pounds in the ground and all, but do you really think when it comes to negotiating a deal Teck won't use the "its too high of a premium on share price" argument? Everything that comes out of the company is very low key, and seems engineered to not generate any excitement.

                    A bidding war would benefit us, and once we get past their review period and the BFS is certified I hope the company steps up to the plate and generates some excitement. Nothing will force Teck's hand faster than worry of a price escalation / or another major jumping in.

                    If they are playing possum until March 6th, fine - great strategy! I just am not as confident in management as I once was as there have been several items I think they have really dropped the ball on...

                    Another thing I struggle with is the requirement of all our news releases to get approval from Teck? Maybe it is in the agreement somewhere? I would love to have someone point it out. It doesn't make sense that another company can dictate what another company releases when they have zero ownership in that company. Or maybe this Teck approval requirement is just another speculation that has become a truth here on the board?

                  2. Replying to @Metacomet

                    Meta, with all due respect, there is really no need to insult people here. Clearly, Teck and CUU have not met your personal needs in terms of completing their deal on the schedule you were expecting. While I am sure almost everyone here wanted this done sooner, it didn't happen so we are here now....waiting together. I sense your tone is somewhat condescending and even sarcastic to both posters here as well as to CUU management. I believe you even referred to management as clowns in one of your recent posts. That is most unfortunate. Please correct me if I am mistaken. Both myself and others have alluded to our belief that we are an important piece of the Mining District puzzle....a part of Teck's grand plan for the area if they are to be our suitor. If this is truly the case, there must be others irons in the fire for Teck to be considering simultaneously, perhaps even at the discussion stage or even negotiation phase, and this will take whatever time it needs unfortunately. I suspect CUU management understands this to be the case and will cooperate with Teck's requests....within reason of course. Discussions, which may even progress as far as negotiations, usually begin with a feeling out process then a concensus on the key, main components in an agreement before final items are hammered out, the legal language written in binding contract format and finally....a deal! And as always when you have two willing parties, a deal more or less in the middle between the two opening positions is the standard outcome. If we can't agree on buy out terms, or a buy out following a Teck back in, then it's on to Plan B! And we know that honey usually works better than vinegar....at least in the beginning....so we continue to wait and trust Elmer and Ernesto to get us a fair deal if there is one there to be made with Teck. Or it is time to put up the for sale sign and bring in the new offers. The alternative is to sell your/our shares and move on to other opportunities. The choice is yours of course.
              3. Replying to @chunkytoast

                I finally read the whole agreement. For whatever it's worth, here's how I interprete it. It's similar to Chunky's reading I think. However, the contract is not what I would call a model of clarity and other interpretations are certainly possible.

                The obligation to tranfer the Laird interests is triggered by the Feasiblity Notice under Section 5.4. The Feasibility Notice is notice of completing a Positive Bankable Feasibility Study. That term is defined in Section 5.5. If the study meets the requirements of Section 5.5(b)(i) (the 12% discount), it qualifies as a Positive Bankable Feasibility Study. If it meets the requirements of Section 5.5(b)(ii) (the 8 % discount) but not Section 5.5(b)(i), Teck "may elect . . . , in its sole discretion, to deem the report to be a positive feasiblity study." Teck has 30 days to make this determination.

                CUU did not purport to give notice of a report that meets the requirements of Section 5.5(b)(i). Accordingly, the report will be considered a Positive Bankable Feasibility Study only if Teck elects to do so "in its sole discretion" as a Section 5.5(b)(ii) report. Two conclusions: First, the notice CUU gave to Teck is not a Feasibility Notice (at least not yet) because it's not a notice of Positive Bankable Feasibility Study since Teck has not "in its sole discretion" deemed it to be one. This seems to mean that the obligation to transfer the Laird interest is not yet perfected. Stated otherwise, CUU has no right to the Laird interets until it has given notice of a Positive Bankable Feasibility Study and that has not yet occured.

                Second, the "in its sole discretion" language appears to give Teck complete freedom to consider the study not to be a Positive Bankable Feasibility Study for whatever reason it wants. I don't think it matters how well the study was prepared. Since the study did not meet the requirements of Section 5.5(b)(i), Teck can decide not to treat it as a Positive Bankable Feasibility Study. Chunky makes the interesting observation that maybe we could agrue Teck "implicitly" accepted it through their conduct but, as he notes, that would be difficult. In fact, unless Teck somehow lead CUU astray regarding the contract, I think Teck would be on pretty solid ground in just advising CUU that it did not consider the study to be a Positive Bankable Feasibility Study and would not need to provide reason.

                Read in this way, it's really up to Teck to decide whether they want to back in now or whether they would rather hit the ball back into CUU's court. If Teck decides not to treat the study as a Positive Bankable Feasibility Study, CUU would appear to have two basic options. It could go back to drawing board and come up with a study that meets Section 5.5(b)(i) and submit that to Teck at a later date or it could exercise its rights under Section 6.3 to give notice of termination of the option for the Laird interests and just keep what it has now (the 70% direct participating interest). If CUU terminated the option for the Laird interests, under Section 5.4, Teck would no longer have a back in right at that point and under Section 8.2 could elect to recieve a net smelter royalty or some CUU shares. CUU could apparently then make a production decision without Teck under Section 5.4 but this would be subject to Laird carried interests held by Teck or otherwise outstanding.

                Just my thoughts,

                regards,

                Volpino

                1. Replying to @Volpino

                  Volpino - with Teck being involved throughout the entire process I would find it difficult that the document that has been drafted doesn't meet their minimum requirement. Thanks for joining on Valentine's day.

                2. Replying to @Volpino

                  Welcome aboard Volpino. Well stated. So, let's hear NOTHING from Teck from now to, what is it ? --> March 6th ? If we hear nothing THEN it's "go time" and we are some number of days into the 120 day countdown ! Otherwise, unless what we hear is a hallelujah buyout, we're screwed. That's my simple view of the world. Nighty-night all.

                  1. Replying to @darpa1

                    I've been staying away from putting my 2 cents on the board today because I promised myself a no Negativity Day. So, to stay on tract with staying positive today, I read the History of Schaft Creek and the following is a somewhat detailed summary of it.

                    IMO, since the first mention of Teck's involvement with SC was in 1980 to date, I see no reason why they would not approve the BFS as "bankable". Their long term interest (33 years), especially Dr. Keevil (sp?), as mentioned in previous articles and posts, and all the time and money Teck has spent on SC, only establishes their continued interest to own this mine, which has now been proven to be a DISTRICT. If Teck was interested before in SC, they should be salivating and drooling now, like Gollum, in J. R. Tolkiens novel, "The Hobbit" and Schaft Creek now is: "My Precious" District! LOL

                    Schaft Creek discovered in 1957 by prospector Nick Bird, who was employed by BIK Syndicate, a consortium of Silver Standard Mines Ltd., McIntyre Porcupine Mines Limited, Kerr Addison Mines Ltd. (now Noranda Inc) and Dalhousie Oil Ltd. under the direct supervision of William St. Clair Dunn.

                    BIK Syndicate was reorganized in 1966 into Liard Copper Mines Ltd. (Silver Standard Mines) with 66% interest, the manager (operator), hired ASARCO in 1966 to explore the Liard Copper Mines properties. Unfortunately, the project was not well maintained and in 1968, Hecla Mining Co. of Canada Ltd, a subsidiary of Hecla Mining Co. of Wallace, Idaho. entered into an option agreement for 75% property interest from Liard Copper Mines and commenced drilling and exploration work through 1975/76.

                    Note: There were no mention in between, how Teck's name or Schaft Creek got involved from this point forward. I assume the mention of Teck and Schaft Creek were probably changed from a Liard Mines acquisition. Guessing here...

                    In 1980, Teck continued drilling and exploration from Hecla's work and completed the project in 1981, followed up with engineering study to determine feasibility of a mine development. Further data reviews were performed by Western Copper Holdings in 1988 and Teck in 1993. The property had been on hold till 2002, when Salazar obtained an Option Agreement to acquire 100% of Teck's interest.

                    There has been no production of minteral products from Schaft Creek properties to date.

                    I feel our present concerns about the bankability of the BFS, stems from our past experiences of anticipating everything as good and positive and later learned otherwise, and now our minds are preparing for the worse and hoping for the best. Not negative thinking, just cautious and playing with different "what if" scenarios.

                    I hope knowing the history of Schaft Creek and Teck and their continued interest to date, helps to calm everyone's nerves. Furthermore, do not forget, Don Lindsay, in his past few articles, and interviews, plus annual meeting, had expressed their interest in juniors, considering, their mine life in copper mines are dwindling. Teck has an urgency for a mine with good mine life and great mineralization, i.e. CUU.

                    1. Replying to @Liddy77

                      That is something Liddy. 57 years to bring it to where it is now. That's a long time in the discovery stage. But heres to it finally making it into the lime light. :)

                3. Replying to @Volpino

                  Volpino, thank you for your insight to the agreement. its obvious you have read it in detail. some sections are ambiguous, but the gist is, to me , fairy straight forward.

                  All questions will be answered on March 6th. can't wait for that date to occur without a Teck objection.

                  Then we'll all prosper, thanks for your effort.......chunky

                  1. Replying to @chunkytoast

                    Thanks Chunky. And just to be clear and responding to some of the other posts, I am only commenting on my interpretation of the parties' rights under the contract. From a commercial standpoint, the study may show a much more robust project than the one described under Section 5.5(b)(i) but the study did not purport to meet the specifc parameters of that section.

                    Agree that March 6th is key.

                    Regards,

                    Volpino

                  2. Replying to @chunkytoast

                    "All questions will be answered on March 6th. can't wait for that date to occur without a Teck objection.

                    Then we'll all prosper, thanks for your effort.......chunky"

                    I still don't understand what everyone is worried about. It has been stated by CUU management many times that they have worked closely with Teck throughout this entire process. Teck even gets to approve our news releases. They have downloaded all CUU's data. Why do people think Teck would go through all this and then 30 days later tell CUU the BFS is wrong? It would equate to getting kicked in the balls by your own mother. Teck has just as much at stake here as we do and you can bet your bottom dollar that if there was a problem, they would still be working on it instead of releasing it and making everyone, including Teck look like clowns. It would be just as counterproductive to the Teck image as it would be to ours.

                    I would sure like to see the money now but a deal this size takes time and I think it's going to be worth it so I guess "soon" is ok with me.

                    By the way Chunky, thanks for the invite! If I have to bring Boobie you might want to stock up on the booze...

                4. Replying to @Volpino

                  Hey Volpino - I'm glad you read it but I think you missed a few key things in your reading which I feel has given you a misleading interpretation. My full interpretation is here:

                  Key points you've missed I think are " The report will be considered to be positive if it generates a positive NPV in either of following two cases:" That is, one or the other. It doesn't have to satisfy both. We aren't going for (b)(i) - the 12% case, we're going for (b)(ii) the 8% case. (b)(i) has no bearing on us or any of its conditions. Key word is either.

                  Secondly (b)(ii) is clearly defined as "(ii) secondly, the report will be considered positive if it indicates that production from the Property would, on a project basis, generate a NPV of at least $1.00 using a discount rate of 8% assuming a mine life of no less than 15 years andvcopper metal production of at least 50,000 tonnes per annum;"

                  We definitely achieve that, and all other conditions for section 5 c-l. They have no reason to decline it. It's is highly unlikely they will. Outside of the fact that we meet everything in the agreement themselves - we've had an internal review, an external review by Merit, have worked with Teck (who made recommendations which were simple in nature) and TT has also likely reviewed it after they finished it. 3 reviews by different sources and input from Teck - they completely kill their image of working with Juniors and would likely lose if we took it to court. There's no way in my mind that they can decline it as "positive" or "bankable". It's possible that they don't buy us out, that they take a lower percentage or take shares/NSR but I can't see them saying we don't have a legitimate study given what the agreement asks for.

                  JayJ

                  Copper Fox Metals Inc.

                  Forget Everything

                  Forget everything you've read on this board. I think there's a confusion between what's on this board, speculation and the source material. Let's go to the source material, that is the actual agreement. No misinterpretatins from management, no disinformation from one person to...

                  1. Replying to @JayJ

                    Key points you've missed I think are " The report will be considered to be positive if it generates a positive NPV in either of following two cases:" That is, one or the other. It doesn't have to satisfy both. We aren't going for (b)(i) - the 12% case, we're going for (b)(ii) the 8% case. (b)(i) has no bearing on us or any of its conditions. Key word is either.

                    Key word is bankable

                    If the report is positive under §5.5(b)(ii) but not under §5.5(b)(i), Teck Cominco may nevertheless elect, in its sole discretion, to deem the report to be a Positive Bankable Feasibility Study. If Teck Cominco does not give any notice as aforesaid, then any report that satisfies §5.5(b)(iiv will be deemed a Bankable feasible study.

                    1. Replying to @MES

                      Yes...and bankable is defined...Assuming that the FS isn't straight out lies (and there's no reason to believe that) we meet those definitions - no?

                      1. Replying to @JayJ

                        Yes...and bankable is defined...Assuming that the FS isn't straight out lies (and there's no reason to believe that) we meet those definitions - no?

                        I know one thing, if FS was bankable at 12% we would be sold I would be in Antigua right now...

                    2. Replying to @MES

                      ....any report that satisfies §5.5(b)ii will be deemed a Bankable feasible study.

                      Game, set, match

                      Where's our shares?

                  2. Replying to @JayJ

                    JayJ,

                    As I said, the contract is not a model of clarity. Maybe you are correct but let me point out a couple of things.

                    The first part of the clause, the part that you quote above with the "either", says the study is "positive" (lower case and not a defined term) under both subparagraphs "i" and "ii" but the later language defines when the the study is a "Bankable Positive Feasibility Study" (the capitalized defined term). That difference allows me to reconcile the first part and second part under my reading: both the Section 5.5(b)(i) and Section 5.5(b)(II) studies are "positive" but only a study that meets the 12% hurdle is a "Bankable Positive Feasibily Study" unless Teck "in its sole discretion" decides to accept the 8% study as a "Bankable Positive Feasibilty Study."

                    My interpretation also gives effect to the whole provision (a contract rule of constuction where possible) whereas I don't see how your interpretation gives effect to the "in its sole discretion" language. It seems to give precedence to the "either" clause and then does not give any effect to the "discretion" clause.

                    As to the last part of your post, my only response is that it's not a question of how robust the report may be in a commercial sense, if I am reading the agreement correctly. If it does not meet Section 5.5(b)(i) Teck does not have to accept it as a Bankable Feasibilty Study -- period. Hopefully, this will all become moot and Teck will want to move forward. In fact, it can exercise its back-in at any time regardless of whether a Bankable Positive Feasibility Study has been submitted (see Sections 7.1 and 8.1).

                    Regards,

                    Volpino

                    1. Replying to @Volpino

                      I'm reading the first "positive" in lowercase as defined in the same sentence that we're talking about, different bold than last time, "The report will be considered to be positive if it generates a positive NPV in either of following two cases" How is it not defined? It's even mentioned in the prior paragraph:

                      “Positive Bankable Feasibility Study” means a comprehensive report prepared in good faith that shows the feasibility of placing the Property or part thereof into commercial production and is positive as contemplated in this §55. The report will be considered positive in any of the following cases."

                      Notice the word ANY. Meaning This one, or that one, or the other one. Put together with "either" I don't see how if we're choosing (b)(ii) how anything else applies...Basically section (b)(i) just doesn't matter for us. All that said - they do still have the right to look it over for 30 days any verify everything, I see it as more of a formality than of anything to be concerned about. March 6th, we should find out we've been on the clock for 30 days (unless it's not a part of the 120 days - which I'm not totally clear on) as Teck doesn't object and many of those cautionary warnings should hopefully disappear.

                      I do understand that the "at their sole discretion" can cause worry, but when you look at why they might - it's difficult to come up with a reason they would.

                      It'd be funny (in the worst kind of way) if they objected and said that it wasn't complete as the inferred wasn't included and not representative of the actual deposit. (Don't think this will happen or that it's an actual possible reason.)

                      1. Replying to @JayJ

                        The report will be considered positive in any of the following cases." Notice the word ANY. Meaning This one, or that one, or the other one.

                        Yes, it would be considered "positive" in either case, but it won't be considered "positive bankable" which is another thing altogether and the trigger for transferring the Liard shares and moving on to the next step.

                        If it was "positive" in both (i) and (ii), then it would get a pass at being "positive bankable." But it wasn't. Because it was only positive under 5.5(b)(ii) then Teck has the right "at their sole discretion" to say whether they consider it "positive bankable." They don't seem to have to have a reason.

                        The longer it goes on though, the less likely they are going to object. They've been examing this for about half a year, or more and had ample time to say that they wouldn't find it acceptable. As time passes I would be more and more surprised to hear them reject it.

                        1. Replying to @Prospekt

                          Maybe I've missed it but I don't read it as Positive Bankable Feasibility Study having to include (b)(i). They define PBFS as "“Positive Bankable Feasibility Study” means a comprehensive report prepared in good faith that shows the feasibility of placing the Property or part thereof into commercial production and is positive as contemplated in this §55. "

                          As long as it is positive as contemplated under 5.5...Then it's a PBFS. If we agree it's positive, do we not agree ipso facto that it's a PBFS? And because we've (or at least I have) established that we need either or any, and we're going to use (b)(ii)...then (b)(i) doesn't matter. Again - they have 30 days to make sure it is, but isn't it just a formality?

                          I should go to law school.

                          1. Replying to @JayJ

                            As long as it is positive as contemplated under 5.5...Then it's a PBFS. If we agree it's positive, do we not agree ipso facto that it's a PBFS? And because we've (or at least I have) established that we need either or any, and we're going to use (b)(ii)...then (b)(i) doesn't matter. Again - they have 30 days to make sure it is, but isn't it just a formality?

                            It's not clear. It would be great if it were clear. Management could make it clear. Simply, the question is "Could Teck, as part of Jason's confirmed 30 day review period, still opt to reject (at their sole discretion) the notion that CUU has indeed officially delivered a PFS that triggers both i) the 120 day clock AND ii) the transfer of the Liard shares?"

                            1. Replying to @darpa1

                              Yes they can but then the rest of the body is enjoyed in full force. They would have to decide whether to make a production decision, % they want, or take the royalty. This can't be avoided. I've made certain that would not be the case. The last thing I want is a stock stuck in limbo. I did mention that Teck could request an extension and we'd give it. I don't think Teck can or will challenge any data because they've been behind that. I also think Teck had to agree on the numbers used in the report. Perhaps they could challenge those? ROV is a newer method so they can dismiss that but then under the % system it's still positive.

                              120 days would be enough to get a drill result from the cap. So we delay a bit longer then Teck says prove the waste and we get that done before the time's up. Then Teck buys. We don't need to wait much longer for the snow to drop enough that we can get a drill up there. I'll volunteer to run the cat in return for travel expenses. We don't want Teck to back out entirely. 20% would be just fine but we're better off with them at 40%. The project needs an operator.

                              Go look at the contract in detail and show what remedy we have to conclude the contract if Teck doesn't accept the BFS.

                          2. Replying to @JayJ

                            I agree with JayJ that CUU's BFS is "positive" and "bankable" because we have met "any" and "either" of 5.5(b)(ii) and (b)(i).

                            Below is an interesting article about: "The Use and Abuse of Feasibility Studies".

                            Any possibility that Teck is waiting 30 days to get approval from the bank? (Per below bolded and underlined info.)

                            "The definition of a "bankable" document is theoretically:

                            A document which outlines the technical risks inherent in a mining project, delineates methods of eliminating those risks, and quantifies the potential economic returns that can be attained at various commodity prices.

                            The bank itself will ultimately define what is required in a document that it will utilise to justify financing a mining project, so realistically, one could say that there is no such thing as a bankable document.


                            The term "bankable" feasibility study initially seems to have an added ring of veracity over the more mundane phrase "feasibility study". Adding "bankability", after all, seems to imply that the study is like money a party can take to the bank. Unfortunately, the term is misleading ... At the very least the knowledgeable lender, experienced in lending to mineral projects, will require that its own consultants and internal research departments review the study. The lender often then requires the parties to augment the study as support for the lending request. One can argue in good faith, then, that there really is no such thing as a "bankable feasibility study" except after the selected financing lender prepares or approves one. In short, it would be far less misleading if the term were "Bank-Approved" Feasibility Study."


                            http://www.cartaexploration.com/downloads/external%20pdfs/Use%20and%20Abuse%20of%20Feasibility%20Studies.pdf




                          3. Replying to @JayJ

                            As long as it is positive as contemplated under 5.5...Then it's a PBFS. If we agree it's positive, do we not agree ipso facto that it's a PBFS?

                            No, because it isn't positive in both (i) and (ii). If it were, then it would be a PBFS.

                            "If the report is positive under 5.5(b)(ii) but not under 5.5(b)(i), Teck Cominco may nevertheless elect, in its sole discretion, to deem the report to be a Positive Bankable Feasibility Study."

                            Then it says if they don't give any notice, then any report that satisfies 5.5(b)(ii) will be considered a PBFS. (It doesn't actually tie those 30-days in at this point, but I guess we have to assume that is how long they have.)

                            We should all go to law school to invest apparently, although I sort of suspect given the cannonball comments that even lawyers are having a tough time with this one.

                          4. Replying to @JayJ

                            You can't take on line of a section out and not compare it to the section for reference. Law language is structured like that. A perfect example is where they use Net Profits but describe it using a second term. That paragraph did not intend to imply that it was anything else.

                      2. Replying to @JayJ

                        If they found a flaw CUU would have 30 days to come up with a remedy. The remedy could take a couple of months to enact but that would satisfy the contract.

                        Since that's not going to happen Teck's only other options are back in or back out.

                        1. Replying to @webgogs

                          If they found a flaw CUU would have 30 days to come up with a remedy. The remedy could take a couple of months to enact but that would satisfy the contract.

                          Wouldn't they have forever to come up with a remedy? The contract just stays in effect until a PBFS is delivered.

                          1. Replying to @Prospekt

                            No, all contracts contain an execution requirement. The ones I'm most familiar with are from the oil and gas field and all of them contain performance requirements. In our case it's a specific performance milestone. The date part has been satisfied. We spent what was required before the stale date. The BFS has been dropped and now Teck's stale date comes into play.

                            The intention of the 30 day period is so Teck can satisfy themselves that the document is accurate. If it is then it is bankable. If not then we have to remedy it. Under all the descriptions of bankable this document does satisfy those requirements. The only way it's not bankable is if it is flawed. Remember, the bar was set very low for what is considered bankable. Positive has an accepted standard and that is anything on the plus side of the number line. For legal purposes it was set at 1 unit positive. So it has an exact definition. $1.

                            Of particular note:

                            Subsection A states what is positive if the document is done by way of agreed terms.

                            Subsection B defines what happens if we do it without prior agreement.

                            The definition of the paragraph states that if CUU aims for the lower tonnage they must also produce a report for the larger at the same time. So why this if the bar is set very high at 12% discount?

                            Then it sets out the 2 cases for what is positive.

                            Then it describes again what NPV and Net Cash Flow mean with respect to the PBFS

                            Then it subordinates ii to i.

                            Last it states that on no response it is still a BFS.

                            1. Replying to @webgogs

                              Thanks, WG. Have we heard if CUU has received any feedback on the BFS from TCK? Any questions, requests for additional information? Stockfriend

                            2. Replying to @webgogs

                              The only way it's not bankable is if it is flawed.

                              Succinctly put! Precisely how I see it as well. (Just hope we're right. Would love written confirmation from management.)

                          2. Replying to @Prospekt

                            I don't think so. Because if there was a flaw, or aproblem, the PBFS wouldn't get delivered. Not until Teck was satisfied with any correction. IMO

      1. in the cautionary note it says....

        Known risk factors include, among others: the results of the positive Feasibility Study may not lead to the development of a mine at Schaft Creek or commercial mining operations; the project development plans and timing for Schaft Creek as outlined in the Feasibility Study may not occur as currently anticipated, or at all; Teck may not accept that the delivery of the positive Feasibility Study constitutes delivery of a "Positive Bankable Feasibility Study" as defined pursuant to the terms of the Teck Option Agreement; the 120 day period that Teck has to exercise its earn back rights may not have commenced

        so, is this perhaps why the boys are keeping a low key in regards to committing to this time frame......we must wait, as they are awaiting for the thumbs up from Teck??

        1. Here we have a correlation between positive and positive bankable feasability study..So there is still a way to go. One would have thought this would have been worked out long ago.

    2. This says we spent $85.34M to Dec 31st 2012. Previous NR's said we spent $84.9M as of July 31st, 2012. We only spent $0.44M since July as eligible expenses???

      They also dodged stating that the FS was delivered to Teck.

      Additionally the Company holds, through wholly-owned subsidiaries, mineral tenures located in Pinal County, Arizona (the 'Sombrero Butte Copper Project') and in Miami, Arizona (the 'Van Dyke BLM Claims'). For further information on these mining projects please refer to the Company's web site at www.copperfoxmetals.com.

      Fustratingly, they say this in this NR but there isn't one bit of info outside of a NR on the USA properties - no maps, no pictures, nothing in the Jan corporate presentation.

      1. This says we spent $85.34M to Dec 31st 2012. Previous NR's said we spent $84.9M as of July 31st, 2012. We only spent $0.44M since July as eligible expenses???

        This is part of the discussions they would have been having. It was necessary for Teck to also sign off on the eligible expenditures portion of the Agreement before they could move forward because Teck needed to know how much they would have to spend.

        I would hope this NR is an indication that they have at least agreed on the $84.9M as final. It is a reduction from their last News Release where they said: ($85.34 million to December 31, 2012). So Teck must have disagreed on some of those expenditures.

        I suppose this means progress of some sort.

        1. or a typo... This NR looks well structured however , I take that as they had some guidance on it ... really strange they can submit something that looks flawless like this NR and 2 weeks before a notepad unclear N R on something that important...

        2. This indicates to me that they must be intending to back in. They would not get concerned over this if it was going to be a buyout. IMO :)

      2. They also dodged stating that the FS was delivered to Teck.

        Chappy, this was mentionned in the Feb4th NR however. my money is on the word BANKABLE.

        Copper Fox Metals Inc
        Symbol C : CUU
        Shares Issued 399,606,817
        Close 2013-02-01 C$ 0.85
        Recent Sedar Documents

        Copper Fox files Schaft Creek FS paperwork

        2013-02-04 08:18 ET - News Release

        Mr. Elmer Stewart reports

        COPPER FOX FILES POSITIVE FEASIBILITY STUDY ON SCHAFT CREEK PROJECT; FEASIBILITY STUDY FILED ON SEDAR

        Copper Fox Metals Inc. has filed a National Instrument 43-101 technical report on SEDAR, pertaining to the previously announced positive feasibility study on the Schaft Creek deposit. The technical report is also available on Copper Fox's website.

        For the highlights of the feasibility study, please see release of Dec. 21, 2012, Copper Fox Metals news releases.

        The company has delivered a copy of the completed positive feasibility study to Teck Resources Ltd. Teck is reviewing the feasibility study and is discussing with the company its earn-back options available under the Teck option agreement dated Jan. 1, 2002. There can be no assurance that these discussions will lead to Teck exercising any of its earn-back options nor that the company and Teck will enter into a definitive joint venture agreement as contemplated under the Teck option agreement.

        Elmer Stewart, president, stated: "The filing of the positive feasibility study and commencement of our discussions with Teck related to its earn-back rights are significant milestones for the Schaft Creek project. We look forward to these discussions regarding Teck's possible future involvement in the Schaft Creek project. In the meantime, the company will continue its work on the Schaft Creek project toward completion of the environmental assessment application and establishing the work programs to assess the economic benefit to the Schaft Creek project of additional drilling to upgrade the inferred resources located within the pit shell and additional metallurgical testwork to increase metal recoveries."

        Elmer B. Stewart, MSc, PGeol, president of Copper Fox, is the corporation's nominated qualified person pursuant to National Instrument 43-101, Standards for Disclosure for Mineral Projects, and has reviewed the technical information disclosed in this news release.

        We seek Safe Harbor.

          1. Teck does have the FS, but until they add the word "Bankable" in front of the FS, the Laird Shares will not transfer hands and the 120 day clock will not start.. Could they be making up the rules as we go, or did I misunderstand the contract (option agreement) right from the beginning

            1. Replying to @Nav2006

              It makes sense when you think about it that on receipt of such important document with huge financial impacts, they would take time to review and approve as is ... I guess we thought since they were involved in the process from the begining they would already know whats in there etc...

              1. Replying to @simc1

                Resource Estimate
                In May 2012 , Tetra Tech Wardrop ('Tetra Tech') completed the Updated Resource Estimate for the Schaft Creek deposit including the Paramount and Liard zones. For a more detailed review of the Updated Resource Estimate, please see Copper Fox's news release dated May 31, 2012

              2. Replying to @simc1

                I guess it's easy for us (myself anyway), to forget that this may well be a Billion +$ transaction so every little word in the agreement, and its proper meaning, is worth quite a bit.

                glta

            2. Replying to @Nav2006

              unless CUU is giving them a 30 day grace period in case Teck is lining up their ducks in order to present an offer on 100% of CUU minus Arizona....

                1. Replying to @Nav2006

                  unless the market knows it has time to do other trades before they get back to CUU. somehow MM's always know... maybe its beeing driven by software... either way at least we know!

          2. Elmer returned my call yesterday afternoon and we spoke for some time.

            I should add that Elmer did almost all of the talking and I listened.

            This is only my opinion of my conversation will Elmer.

            Elmer said that Yes the feasibility study has been delivered to Teck and that yes, Copper Fox believes it to be bankable.

            He added. Does Teck think it is bankable? We are waiting to see if Teck agrees or disagrees with the feasibility.

            If they agree with the feasibility, then the Liard shares should be transfered.

            He does not know what decision Teck will make. Only that he thinks Teck will want this project.

            They have been in discussions with Teck providing any information or clarification.

            Elmer does not give definitive dates and timelines but I gathered that he expects Teck to respond before too long (within the 120 days)

            He intends to continue working closely with Teck and sees no need to pressure or annoy them.

            Nothing really new here but I can say that Elmer comes across as being very confident of what they have accomplished.

            After this conversation I feel good about continuing to hold.

            DYODD.

            Storacle

            1. Replying to @storacle

              Still does not explain why there is still a risk it will not be accepted if they have such good business relationship and working together. Was that all arse talking from cuu's part?

              Could all this be stalling tactics until the Env permits? Maybe Teck it's a no go until these are in-hands.

    3. Based on the fact that Teck signs off on all CUU NRs I enjoyed reading the following:

      Feasibility Study

      Subsequent to the year ended October 31, 2012, the Company announced the results of a positive Feasibility Study on the Schaft Creek project in December 2012, and subsequently filed on www.sedar.com in February 2013.

      and

      Based on recommendations in the Feasibility Study the Company is currently considering programs to enhance the economics of Schaft Creek including:

      i) a diamond drilling program at Schaft Creek to upgrade the 171.16 million tonnes of Inferred resource, that lie within the pit shell, to a Measured or Indicated Resource; and

      ii) additional metallurgical testwork to increase metal recoveries and reduce processing costs.

      I like that they've publicly put Teck on notice where the drill program is going and what it will accomplish. I find the use of the word "considering' interesting as well.

      Cheers.

    4. At a quick read through these are some comments that I find interesting:

      The 2012 exploration program was designed specifically to avoid any work (diamond drilling, metallurgical test work, etc.) on the Schaft Creek deposit which if successful would have dictated a suspension to update that portion of the Feasibility Study.

      I really find this hard to believe.

      On completion of the Feasibility Study, Copper Fox earns Teck's 78% interest in Liard. Teck's earn back option to acquire either, 20%, 40% or 75%, of Copper Fox's interest in the Schaft Creek Project is triggered upon delivery of a "Positive Bankable Feasibility Study" (as defined) to Teck after which they have 120 days to make a decision.

      So why haven't we had those Liard shares transferred then if we have earned them? They haven't really cleared up the matter of whether it is "bankable" or not.

      The financial requirements of Copper Fox related to the potential development of the Schaft Creek project are mitigated to some extent by the obligations of Teck should they exercise their earn back right on the Schaft Creek property. Additional funds will be required to complete the current planned activities and the Company may need to issue additional equity in connection with any development of the project (Refer to Teck Earn Back Option).

      1. This part answers the question why they didn't drill the 171 million tonnes of Inferred resource.

        2012 Exploration Program
        The 2012 exploration program was designed specifically to avoid any work (diamond drilling,metallurgical test work, etc.) on the Schaft Creek deposit which if successful would have dictated a suspension to update that portion of the Feasibility Study. The objective of the 2012 exploration program was to test the mineral potential of the Schaft Creek Mineral Trend to host additional copper deposits. This trend is located on the west side of Mount LaCasse and extends for a distance of approximately 7 kilometres north of the Schaft Creek deposit.


          1. 2012 Exploration Program
            The 2012 exploration program was designed specifically to avoid any work (diamond drilling, metallurgical test work, etc.) on the Schaft Creek deposit

            1. Replying to @Riskkee

              Yeah, I got what that NR said.

              Have a look at the 2012 exploration programme NR from May 2012. What did we achieve of that plan? We did the magnetics and we drilled 5 holes for phase 1 of which 3 failed. No Titan, no phase 2 drilling and we were out of camp at the end of August. So they avoided a bit more than just drilling the Schaft Creek deposits. All we achieved in 2012 is demonstrate a wee bit more mineralization in Discovery. Zip in Mike, and we didn't even try to drill GK. So they were right about "avoiding any work...on the Schaft Creek deposit" but they avoided a lot more.

              Now, we are talking up the 171M tonnes like it was some gift from heaven. It's been there since 2002 or at least since 2008 since our mine plan didn't change much at all. We should have drilled it at some point in the years since the 2008 mine plan.

              1. Have a look at the 2011 RE recommendations (pg 26-1). WBZ (equals the west side of Liard Zone) is where we have recommendations to drill in the 2012/3 FS - near DDHAS-16. They recommended drilling then:

              Drill additional holes to increase the level of confidence of the lithological interpretation and to explore the zone of higher-grade mineralization present within the WBZ associated with a high chargeability geophysical anomaly. An additional 10 holes (9,000 m) is suggested. Estimated cost: US$2.7 M to US$3 M

              Also, would we not have had a mine plan going into the 12th inning in spring 2012 expecting a FINAL BFS to be dropped? Had they not even achieved so much as a mine plan in March 2012? Right up to the big delay last spring, they were still talking about delivering BFS at the end of March - with no mine plan?? I would hope we had a mine plan and, if we did, it would have shown were there was some inferred that needed drilling.

              The latest NR's are saying that this 171M tonnes is where our upside is at (or a big part of it anyways). Why didn't we chase that upside in 2009, 2010, or 2011?? Why is it not a waste of money and time now when it was not persuing before? The excuse is that we didn't have a mine plan.

              The main theory is that Teck is a-okay with 'knowing' what that 171M tonnes means and will pay us handsomely for it. What if Teck decides to take a walk or play dumb about the 171M tonne potential; after all, drillling could move the grades and tonnage around from what we 'infer' it to be. That's why we can't consider it mill run ore.

              Say we do have a drilling programme this year. Much, if not all of it, will be tied up with this 171M tonnes while Discovery, Mike, ES and GK sit undrilled. So while we are playing with updating Schaft, we leave the other zones pretty much where we left them in 2012. 171M tonnes vrs adding whole, new, huge, confirmed zones of to the equation. What would you rather be drilling?

          2. Was it really missed chappy? I think you may have answered your own question in your post that you provided the link to.....let's say it was there and known about previously as you suggest. Perhaps Elmer was considering drilling to move it into the Measured category but consulted with Teck first who then said no....we already know about it and it makes no sense to spend either your money or ours. Once he had that assurance, it made little sense to proceed obviously if he truly believed Teck is our partner and future owner of SC and surrounding area. He must also feel there is enough evidence that he could get it considered by another suitor if Tcks best offer is refused and he has to put Plan B into play. Therein lies some calculated risk however he must have run it up the flagpole with the BOD and his advisors before confirming no plan to drill it. The key was to get Teck's agreement to recognize it in an offer and without incurring additional cost nor causing any delay whatsoever in getting he positive BFS nailed down and put to bed.
            1. Replying to @Foxyroller

              Foxy, all we've ever had to work with is clues. the big one was when Elmer said, to many posters, that Teck is happy and we don't have to prove up any more in that area.

              I'm convinced Teck has a better understanding of the deposit and surrounding area than we do.

              We just have to make it thru March 6th., then away to the races......chunky

            2. Replying to @Foxyroller

              It's in everyone's best interest to put forth the strongest feasibility numbers possible. Copper Fox wants good numbers to sell to Teck. Teck wants good numbers to sell to their shareholders.

              1. Replying to @RabidTiger

                No. You are getting the feasibility study confused with the project financing and development phases. The feasibility just has to be net positive. In other words, yes, a mine can be built. Teck's B level shareholders won't be consulted or "sold" on Teck's decision to back in.
            3. Replying to @Foxyroller

              How is that working in the CUU shareholder's interest? What if we have to shop around the remaining portion after an earn-in is declared?

              If there was so much "assurance" communicated from Teck, why haven't they taken us out by now? Why doesn't CUU management know what is the status of our FS or at least a consistent story on where it is at? It's a slam dunk right? Read that mile long disclaimer in our NR today. Compare it to the disclaimer from the previous NR and the one before that.

              I asked Elmer early last month about who decides the drilling. His answer: CUU. Teck just reviews the NR's.

            4. Replying to @Foxyroller

              Perhaps Elmer was considering drilling to move it into the Measured category but consulted with Teck first who then said no....we already know about it and it makes no sense to spend either your money or ours. Once he had that assurance, it made little sense to proceed obviously if he truly believed Teck is our partner and future owner of SC and surrounding area...

              I don't think your theory holds water, if anything along the lines of your theory happened Teck would not be taking 30 days to decide if the PFS is bankable. What a kick in the teeth that would be! Teck telling us not to drill it and then saying we are not sure if this is bankable - you didn't hit the mark at 12%...

              If we did drill it, we would have hit the 12% mark and it would have been unassailable, and also bring us shareholders more value - what their primary purpose is supposed to be.

              If Teck accepts it great, but our share price is in the toilet because they didn't drill it. And if Teck really did what you propose, why not throw your shareholders a bone and tell us in a news release that Teck signed off on not drilling it?

                1. Replying to @RabidTiger

                  Drilling the "waste" would have cost another $3M approximately. For 10 holes??? hmmm. If Teck bought in at 75% that would cost them an additional $12M. Why spend that money when we know it fell "within the copper grade shell" requirement.

                  " Blocks that were not classified as Measured or Indicated categories, but falling within the copper grade shell were classified as Inferred. The copper grade shells represent the limit at which grade continuity can reasonably be assumed. Remaining blocks were not classified. AMEC used a semi-automated process to smooth the initial classification and avoid islands or isolated blocks of different categories."


                  " Drill additional holes to increase the level of confidence of the lithological
                  interpretation and to explore the zone of higher-grade mineralization present within the WBZ associated with a high chargeability geophysical anomaly. An additional 10 holes (9,000 m) is suggested. Estimated cost: US$2.7 M to US$3 M".

          3. Yes Chappy, they must know whats there, ( both parties ) no need for further drilling, funding/dilution for Big E, dilution for us. And hopefully a fair value. Cheers. Moguely.
  2. Finally we seem to be forming a concensus, the contract allows Teck 30 days to determine if the FS conforms to the letter of the contract. We're playing nice guy because if we got pushy, Teck could say no, it's not bankable under 5.5,11 of the contract, and we'd be back exploring, making a new RE and a new FS.

    Count on another year, at least, for that to happen and some of us would have to sell a lot of our holdings.

    Because Feb. is a short month, the 30 days occurs on March 6th.

    It is obviously smart for us to work with Teck during such a critical period otherwise, we'd be shooting ourselves in the wallet...not good.......chunky

    1. No to another year but maybe a couple months. I dont think teck wants CUU to drill and uncover any more value as all the big miners would end up like dogs in a meat packing plant.

    2. I also want to add, if Teck allows the 30 days to expire without an objection, the clock has started on Feb 4th. then we will have earned the Liard shares, and we then hold the strong hand re. the contract.

      If the offer from Teck isn't acceptable, we can just say no, choose your backin and we're selling the remainder to the highest bidder.

      Our weakness, and some of the confusion here, should end on March 6th........chunky

        1. We can't sell now becaue we don't know how much we have.

          would you sell 25% when there's a small chance we could have 60%

          When March 6th. arrives, I'll breath a huge sigh of relief.......chunky

        2. "question... Can we sell our 25% at anytime... even now per say?"

          Technically, Cuu, the company, can be sold at any time, even now, by selling all the outstanding shares. The buyer simply assumes all the assets and liabilities of the company.

          In the same way, technically, Cuu can sell its 25% of SC, the asset, because the maixmum that Tck has an option to back in for is 75%.

          But in reality, none of the above transaction is going to happen. Cuu management is not going to sell until it has some idea what the offer is, if there is one, coming from TCK; and no buyer would know how much to offer, not knowing what they are really buying, if they buy all the shares, or who the partner may be. So "for better or for worse", we are stuck with TCK until they make up their mind one way or the other; let's hope soon! JMO

      1. ...and we then hold the strong hand re. the contract

        We may then hold a strong hand, but will management have the courage to play the cards or just fold? They seem to be a timid bunch when it comes to Teck.

    3. Because Feb. is a short month, the 30 days occurs on March 6th

      Since Teck has been signing off on the FS all this time and knows everything in it, plus the external and internal reviews have been completed I do not see them rejecting the FS. Therefore the Liard shares should be transferred on time; March 6th. But I can't see Teck wanting that to happen since we could turn around and sell them at anytime. This increases the chance of a formal offer prior to Mar 6th.

      But i'm not holding my breath.

      1. We can't sell the Liard shares after get them until, Teck decides on the backin.

        Teck gets back the same percentage of the Liard shares as they back in for.

        E.G. We earn 78%-- they back in for 75%--they get 78%x 75%=58.5%

        Cuu keeps the remainder= 19.5% plus the shares we already own- about 1.8%......chunky

        1. CT, I agree.

          However, even if you assume the 75%. If Teck plays hardball and we sell our portion of 25% of the project to another. Then thats a huge initial loss on a project going forward. When Teck has the chance to own everything outright now and control who to partner with. But I believe Teck has mitigated that chance of losing those shares early due to the fact that Elmer was placed on the board. Thus, Elmer is playing very NICE with them.

  3. Congratulations to those where time is of no consequence, but there are a lot of us watching the shareprice fall while putting off selling to meet financial obligations. Overinvested, frustrated? Whatever, but some of us thought it would have been done by now. I can wait, but GLTA that have decisions to make.

  4. Golfyeti, although I agree with your assertion about us providing a tpd that far surpasses the production rates outlined in the original agreement (and that's nice), I'm convinced that Teck thinks it has a 30-day period to review CUU's PFS. IF that's what Teck believes (and Jason has asserted that Teck is indeed doing a 30 day review in an email to a board member here) THEN I'm ALSO convinced that Teck believes that it can REJECT CUU's PFS. Why would they do that? IF Teck wants longer to think about this 'back in' option (to prove up the lands even more) and, more importantly, IF Teck wants to hold onto their Liard shares officially, THEN they may still be looking at and hoping for a case to be able to do just that -- REJECT our PFS as not meeting the requirements necessary to start the 120-day clock and/or give up the Liard shares. That's a real risk in my mind. There's a few here that may agree that this is still a risk but I'm not sure how many.

  5. So are you saying we can go well beyond 60 days without a comment from the company on a Joint Venture with Teck?

    The JV in this case is just a re-writing of the current Agreement that Teck has to submit to Copper Fox within 60-days post feasibility. Copper Fox then has an unlimited time to review it. It's not really signfiicant because it is mostly the same Agreement we have now.

  6. It's "bankable".

    Doesn't mean Teck won't take the full 30 days before making any such admission.

    Golfyeti, I'm 70/30 on your first statement. 100% on your second. Well stated. Perfectly summed up. Let's hear nothing from Teck until March 3rd (unless it's a huge buyout) and we'll have a confirmation on consensus of bankability AND confirmation that the clock has indeed started. That will be a good thing.

  7. golyeti - the 'delay agenda' makes sense to me as well especially if you put yourself in Teck's chair. Teck gets to old off on committing dollars (and Teck shares if and as necessary) especially if there's going to be a $2B+ buyout to get the 100% interest in Schaft (from us! or more to the point, Ernesto).

    There's also the relatively short-term, yet no-less-important considerations around the EA process (will it formally pass? why don't we wait and see?) and to a lesser extent, how the government winds are going to blow in the up coming election. Will that make the EA process even more of a risk, for example?

    Of course, proving up the Proven and Probable with additional drilling and an even further-updated Resource Estimate with a new NI-43101 also helps with risk mitigation and future 'splainin' to Teck shareholders as to WHY there was such a huge premium needed to buy out CF's remaining stake in Schaft Creek.

    So, delaying is fine for Teck - disastrous for us - especially if Teck's global macro economists are suggesting a continued boom doom outlook for the next 5-10 years (US, Euro, Russia - I don't buy China, but it could result if they are unable to have a genuine export driven economy - I digress).

    That's not to say that they'd actually go so far as to formally 'denounce' the acceptability of CUU's BFS. But, they would likely take the full number of days for everything before making a formal committment. Let's hope they make the offer and let's hope it's meets Ernesto's threshold. That ought to make us all satisfied.

  8. I think we will know a lot more by March 6th ie confirmation its bankable, transfer of liard shares. Then I think teck could act anytime between March 6th up to 90ish days after ...

    but I will expect worst case so 120 days

  9. Not only that, Today on BNN...they had a segment of a guy talking about long term mine life and the numbers it takes to figure out whats what.

    I found it very interesting that most big players are now using $1345.00 for gold price for long term....that sure blows our number away...long term was 20 years or better if memory serves me right

  10. Totally agree on the delay agenda.

    As for TCK and 30 days, I won't be surprised to see it drawn out to 40-45 days. Many people here once gave CUU a pass on the timely delivery of the BFS because, after all, it's a 10,000 pg document. TCK will get the same leeway, they'll take 40-45 days because, after all, it's 10,000 pgs. ya ya, TCK's had the info for months, but it's a lot of info, and this deal will involve billions, so they want to make sure all the t's are dotted and i's crossed........

    How they could stall out the 120 day clock is anyone's guess, but I see this taking more than 120 days to finsh. Personally, I don't think we get bought out until we get the EA approval.

    My theory is, they'll slooooowly start working on the JV, but these things take time.......so 120 days turns into 140......then some issue will come up and a review will be needed....

    Nothing we can do about it, we're just along for the ride. We'll get there....eventually....

    Like everyone, I want to be bought out tomorrow, but I'm preparing myself for (another) summer of this.......

  11. Golf,

    I agree with all your reasoning except on the 60 days to force JV. On the conference call you might remember someone asking a question about '' is this 60 days to JV or 120 days to backin ? '' and Elmer was like ...uhhh well if they backin no need for JV , etc... I m doubtful he would enforce that 60 days JV clause, since he already mentionned he would allow 121 days if necessary OR if negos are turning around a buyout ... no need to jv

  12. My choice is either they will back in with a partner. Or get a partner lined up and then buy this outright. I have believed for some time that Teck knows whats there. They are not worried about how much is there. They know as well and as much as Elmer does, it's good. But there may be reason for a partner as in a possible zone with high level of a mineral that Teck doesn't specialize in. I know that this point had been raised by a poster here last year when the delays were really getting going. JMO