Skip to content
Sign in

Post

Copper Fox Metals Inc.

You’re reading BurningRoF’s reply in this thread.Jump to it

Prez3.4 rating from 209 members16.2K ptsRate

Activity

It's 8:30 am in Vancouver..some are on Vacation. Let the news spread.

BNN today, conference tomorrow.

I'm sure many funds will want to set-up meetings with management.

I'm sure many majors will want to meet CUU.

Stifel can return, Teck could start buying our shares, Insiders can start buying more tomorrow and on...who knows.

Like I said before CUU is the blackswan, Teck just went against the current and the smart money will want to know why....give them time.

And while we wait Teck will make swiss cheese out of slide 16 and 17:

http://www.copperfoxmetals.com/i/pdf/CorpPresApril25-2013.pdf

And when they get the little proof they need, the world will soon know we don't have 2 Billion tonnes we have 4-5 Billion tonnes + on 2% of our property.

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. I would think that they would drill that deep to get to the very bottom of the chargeabilty signature and fully inventory what is really down there. We arent' racing for a FS anymore, we are working on the initial design for the whole District.

    The depth of the juicy chargeability must be twigging the Engineer's minds when it comes to imagining the final pit outcome. The deeper they mine, the wider the rim must be. The wider the rim, the more that rim climbs up and over the top of Mt LaCasse to the north as well as to the east. If we take the top of the mountain off, the pit slopes could be come more manageable. As we take the top of the mountain off, we start intersecting with Mike Zone and Discovery. A few drills to depth could provide valuable info on how the whole mountain will be developed. jmho.

  2. Paramount is a great place to start drilling. If CUU wants to sell sooner than later, why not explore the most valuable target outside of SC?

    This will result in the most value per dollar. I agree its too early to drill deep. Drill more often at less depth... unlock more value quicker.

    Its also interesting that this is only called "Phase I" drilling. So I assume there is another phase coming.

    Exciting news, this is finally going to move fast towards becoming a mine!

    1. IMO the drill program is part of the JV and Teck has a large say in where and how we go from here on in. The drill program is not intended to help CUU increase their value so they can sell, but to realize the mine potential and plan.
      1. IMO the drill program is part of the JV and Teck has a large say in where and how we go from here on in. The drill program is not intended to help CUU increase their value so they can sell, but to realize the mine potential and plan.

        Exactly, but it still increases our value. Im glad they are starting with Paramount rather than exploring new targets.

  3. The undrilled portion of Paramount is to the east and north of DDH 410 (678m) in this cross section. To drill further to the east, we need to climb higher on the mountain while the Chargeability we are after runs well off the page below and to the east.

    1. didn't finish that post...

      Okay, this is just guessing anyways. The undrilled portion of Paramount is to the east and north of DDH 410 (678m) in this cross section. To drill further to the east, we need to climb higher on the mountain while the Chargeability we are after runs well off the page to the east. A new drill pad to the east of 410 could easily be located 100m higher than 410's pad while the chargeability is largely at the same depth as that drilled by 410 at this eastern location. I think 700m holes and deeper could be rather common this year.

      Interpreted Cross Section 6360650mN November 2011
      Click on a percentage in the above legend to enlarge or reduce this picture

      1. I think another factor that may determine the depth of the drilling is the material they are drilling through.

        That whole area is considered to be a "rubble pile" from mountainous overhangs that have collapsed on top of the ground over the years. The variable density of the rubble pile makes it incredibly difficult to drill through. That's why they kept blowing out drill holes in previous years, and ultimately ended up with a couple of failed drill holes.

        Elmer and Cam both said at the Smithers presentation that they have worked out a viable method that will allow them to drill the area. What they did not indicate was whether the altered method of drilling will allow them to drill as deep as they'd like to go.

        It's conceivable that they may want to go to the bottom, but due to the nature of the material they're drilling through... the holes may be shallower than they'd like?

        I'm just conjecturing here. Time will tell. I can tell you that, whether they want to go deep or not, they were specific in saying that they now feel they can get the info they need with the modified drilling procedure.

        Hayz

    1. What do you make of the 10,000 meter drill program? Seems rather small IMO.<

      20-35 drill holes. Like I said, it's just enough to get the proof they want (or a third party wants) and we're gone, sold, see ya !

      They know exactly what to drill and where. It will be fast, we could have 5-6 drills up there.

      1. I think 10k metres of drilling would be closer to 10-15 holes. We need to go deep to reach the remaining Paramount anomally and the anomally runs very deep itself. Each hole could easily be 700-850m on average. I think camp limits out at about 4 drill crews but I havent' heard a firm number on that.

        1. My guess is 10,000 metres of drilling would be approx 12 drill holes east of the Paramount zone

          and 2 drill holes in the eastern extension of the Main/Liard zone.

  4. Before you start confusing me (actually too late). Teck is calling for a 10,000 meter drill program. When talking about the depth of the deep holes are we talking 800 meters or 800 ft?