Skip to content
Sign in

Post

Copper Fox Metals Inc.

You’re reading koala’s reply in this thread.Jump to it

VEEP3.0 rating from 72 members2K ptsRate

Drill Results

I would of expected a few core results prior to the AGM, it has been about 8 weeks. I am sure a co. like tck gets special treatment. [if they want?]

Wouldn't the turn around time for drilling samples be about 8 weeks?

I sure hope they are not waiting for all to come back. before we hear anything. We should be seeing a few any day?

R

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. remedy you are right imo...."problem is" (if it is a problem), we may never get to see the results. Does TCK want the 21+% Liard shares+ our 25% of SC, and do they want to have a range/ bidding war over them? i tend to think not.

    a fair price or a stoked price - shud the cores be as previous or better?

    sb

    1. I dont believe they or CUU can hold this back. This is relevant info if they decide to make an offer. even though our votes wouldnt matter because of insider holdings, If they did not receive them that might be a different story, but i doubt that, so why a drill program?

      R

      1. imho, to justify/ (or not) to their tck sh, the price EE etc. wants & has likely stated during the recent negotiations.

        sb

        1. Syd, i agree. I think there are take out numbers in place depending on the drill cores and maybe further drilling or other milestones may be needed to satisfy EE's expectations.

          EE will not pass on his expectations even if he has to wait longer. He is not under any financial pressure to do a quick deal and give this away.

          R

    2. The drill results will be reported when phase 1 is complete. You won't see a regular trickle of results like you do with Juniors in some effort to bolster the SP. This drilling is not designed to prove up some amazing "pie in the sky results" on the east side, rather to define the mineralization lateral borders/depths north and east under the mountain in an effort to rework the pit and it's slope on the east/north sides.

      Like a few here, I too think that these soon to come results should not only help our SP but potentially open the doors for a few good offers. The big companies can extrapolate rough new reserve potential for the deposit just by knowing the what and where of current drilling and the spacing, location, depth, and grades of these new cores to come. They don't need to wait for an updated resource estimate, pit shell and FS to rework just how long this deposit will be mined and how profitable it will prove to be. Elmer already did that. I have a feeling it may be 4-8 weeks yet for the results, but that's JMHO.

      1. Happy Thanksgiving all :)

        I've been in lurk mode for quite some time now, not much to comment on but I too suspect we will see/hear something in the next 4-8 weeks. Here's what I think will happen:

        SP will slowly increase on drilling results data, behind the doors negotiations with EE to haggle the buy-out price will continue, all longs will eventually have an opportunity to be able to get out of this play with hopefully a modest gain depending on your own ACB.

        Wrt. potential gain, if Stifel bought this stock over two and a half years ago with an ACB of $2.40 I don't see them wanting to take a loss on over a $15 million investment.

        CUU employee stock options @ $1.69 back in March 2011, pretty sure the company expects their people to do well out of these, and with an expiry date of March 2, 2016 they were issued with a long haul approach anticipated. Perhaps not as long as where we are now, but a lot has changed since those stock options were issued IMO for the better, we have more pounds in the ground, so much so that we have had to re-evaluate the starter pit.

        We reached the point where it didn't make any more sense to burn up money and dilute our stock, Teck had seen enough to make them want to take over, Elmer and co handed over what they were asked to do, and we sit and wait for the next move by Teck, which I would guess to be once they have verified/re-sized the starter pit they can then fine tune their current financial model and work out the IRR plus put forward the EA etc. to get the official green light for building SC. That will be the point IMO when the revised buy-out offer for SC will be given to the CUU Board and all shareholders will get to vote yay or nay, with EE's voting power making it his call on whether we get bought by Teck or not.

        We own 25% of SC, and it's only going to get bigger and better with the drill results.

        I wish we had our payout a long time ago, but the timing is now IMO good as the mining sector starts its recovery, macro economics have stalled a lot of growth in this market but now we are slowly emerging. Our day to day SP is as always disappointing, but the value of the in situ resources, the turn key handover from CUU to Teck make this all still a good mid to long term investment. Our project milestone was always going to be the NTL as without power developing SC is just a pipe dream. With the construction completion of NTL expected to be by Spring 2014 (yes, next year) we just need the additional line from Bob Quinn substation to SC built and Teck can switch off those diesel generators.

        All the above JMHO.

        Max

        1. What is our official position concerning the NTL?

          If we are expecting hookup, Teck /CUU have made commitments with BC Hydo that we will go into production. If that committment has not been made are we at the bottom of the list and Hydro will have no expectations of a Shaft Creek mine.

          I think Tech may have made committments to Hydro but not to us, as our 2nd 20m payment has not been made. Teck is in a tricky position wanting to keep all the options open but seemingly not wanting to commit.

          1. We are engaged in a facilities study agreement with BCHydro, that is similar to a feasibility study, for which we are committed to paying at least $1 million. This is not connected to a production decision at this point--they are looking at costs and timing and then locking up the option with BCHydro will come after the FSA is complete. We already know we are in line to get connected to the NTL should we opt to go into production.

            March 25, 2013 News Release:

            Vancouver, British Columbia - March 25, 2013 - Copper Fox Metals Inc. ("Copper Fox" or the "Company") (TSX-V: CUU) is pleased to announce that it has entered into a facilities study agreement (the "Facilities Study Agreement") with the British Columbia Hydro and Power Authority ("BC Hydro") in connection with the proposed power supply to the Company's Schaft Creek project. The Facilities Study Agreement sets forth the terms and conditions for BC Hydro to perform a facilities study to assess the requirements to connect the Schaft Creek project to the forthcoming BC Hydro Bob Quinn substation and the associated system reinforcements.

            Pursuant to the Facilities Study Agreement, Copper Fox has requested transmission voltage service (69,000 kV and above) at the Schaft Creek project and BC Hydro will conduct a facilities study (the "Study") consisting of: (i) conducting preliminary engineering design to develop equipment specifications; (ii) developing a project plan that describes the Schaft Creek interconnection project and includes a schedule for implementation of detailed engineering, procurement, construction, testing and commissioning; (iii) developing a +/-30% cost estimate for implementation of the Schaft Creek interconnection project, and (iv) developing internal (BC Hydro) documentation for financial approvals to proceed with the Schaft Creek interconnection project. In order to conduct the Study, Copper Fox will pay a required deposit to BC Hydro. Copper Fox previously submitted a system impact study request to BC Hydro; an interconnection queue position was assigned to the Schaft Creek project and the system impact study was conducted. The queue position is used to prioritize study work and allocate interconnection costs. The Study is expected to be completed on or before May 31, 2014 and is estimated to cost in excess of $1 million to complete.

            Upon completion of the Study and following presentation, review and acceptance of the Study, Copper Fox expects to sign a facilities agreement whereby BC Hydro would then implement interconnection work, including detailed design and engineering, procurement for major equipment and construction and commissioning of the facilities. Upon entering a facilities agreement, Copper Fox would provide financial commitment to BC Hydro in the form of cash payment for the basic transmission extension and security for the system reinforcement portion. Part of the implementation for the interconnection work that BC Hydro would undergo includes installing revenue metering equipment. Prior to energization, BC Hydro and Copper Fox would execute an electricity supply agreement. The average timeline from execution of the facilities agreement to energization is six months to three years, depending on the complexity of the project and the resources available.

            1. Replying to @Prospekt

              Thanks P

              The FSA is concerned with preliminary engineering, project plans and cost estimates. It may influence how much production but would Hydro be doing it if they had no assurances that Teck was going to proceed. That is my point.

              Is the second payment based on a specific production rate being announced or just going into production.? As usual it is a bit vague but positive.

              1. Replying to @endoftime

                Sure hope a news release drops Tuesday on drill results and therefore will make the AGM a bit interesting. If not I do not see any reason on attending the AGM as, based on history, you cannot believe much of what management has been saying. Whether drill results are good or bad it sure would be nice to get the news and then move on. Still believe there is good news on the horizon......just need to know for sure.

                1. Replying to @CEASAR51

                  Caesars, with respect, I think we all agree that things have taken longer than expected, but your remark about not believing much of what management says is uncalled for. If you have a specific criticism, I'd be happy to hear it. A sweeping generic swipe at management sounds a bit like bashing. SF
                  1. Replying to @stockfriend

                    Stockfriend. I believe it is an understatement to state that we have been led down the garden path. CG, and others, have expressed this in spades over the past number of months and, yes, I too "can't believe the results" Let's not sugar coat this. Trust in management is definately not at a high point and until we see the results we have been led to believe are there......no more needs to be said. I am hardly a basher. I just don't have the rose coloured glasses on that some may have.

                    Lets see what comes out of the AGM. I hope no more ascertions that all is well if there is nothing to back it up. The drill results will be proof in the pudding. I anxiously await these results as it will prove whether or not I have done the right thing in holding on as long as I have.

                    CEASAR51

                    1. Replying to @CEASAR51

                      Thank you. I still own all my shares and am optomistic but am not a happy camper. I am not looking for anything from the AGM except maybe Elmer moving to Arizona to be closer to the next new thing. At shareholder expense and full salary of course...

                      I posted the following elsewhere today and this is what I think:

                      I don't think we are going to see any results or numbers until Teck is finished all drilling. I also think the reason they are drilling is because there is a pending deal in the works based on those drill results.
                      Teck doesn't lay down 20 mil and then bring in drill crews just for something to do.
                      I think Ernesto wanted too much and told them to either prove it up and give him his money or pound sand.


              2. Replying to @endoftime

                As far as I was to believe the 2nd payment was to be paid upon a production decision, whether it was a decision to go into production, or a decision NOT to go into production. Either way another 20 million.