Skip to content
Sign in

Post

Copper Fox Metals Inc.

You’re reading babybreeze’s reply in this thread.Jump to it

Prez3.6 rating from 153 members14.1K ptsRate

Slow day hypothetical...

Here's a hypothetical scenario for the longs who feel like divulging their mindset:

Let's say Teck releases drill results in January, as expected. The grades are good, many in the range of .50 to .80 copper equivalent and even exceeding 1% copper equivalent in some holes, including the deeper cores.

The macro evironment is mildly positive at the time, not red hot, but reasonably upbeat.

In the weeks leading up to the drill results, CUU's share price picks up in anticipation, hitting 66 cents. Following the news release, the stock gets a really nice boost, reaching the $1 mark.

But Teck continues to play their cards close to their chest. They make no mention of phase II of drilling in their news release. Their next move and timeline is unclear.

So, based on those factors, who here would be unloading some of their position at $1, and approximately how much would you be willing to part with?

It's been a long haul for us "long and strong" types. Many of us have lamented not selling at $2.74, or thereabouts. So are you prepared to cash out to some degree as we recover, or are you planning to hold tightly to every share no matter if we run the risk of tapering back into the 50 or 60 cent range due to a lack of momentum after the drill results are made public?

FWIW, under the aforementioned circumstances, I'd probably be prepared to sell about 10% of my shares. I've suffered this long. I plan to hold the majority of what I own until the buyout is finally announced.

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. So, based on those factors, who here would be unloading some of their position at $1, and approximately how much would you be willing to part with?

    My honest response is: all of it.

    If someone wants to take my shares at a buck and see what happens, fine. I've averaged all but one small acount down under $1/share, so unloading them at that price represents a profit I am willing to accept, and a host of lessons learned about junior mining companies.

      1. The sad part is at $0.40 >> a 25% gain only brings us to $0.50. So I picked up a few shares that I'm hoping to sell if we can gain the 10 cents. But the majority I'm hanging on to the end.

  2. "Let's say Teck releases drill results in January, as expected. The grades are good, many in the range of .50 to .80 copper equivalent and even exceeding 1% copper equivalent in some holes, including the deeper cores"

    That is my belief....the Paramount zone is a high-grade deposit of large-scale. Also as the article states jurisdiction and infrastructure. "Imagine two geologically identical projects. One is next to a highway with power lines and a port facility".

    CUU has powerlines (NTL Transmission), and the agreement: Port of Stewart. We are in a geo-politically stable country (Canada).

    Taken from Vette's Blog regarding grades

    Diamond drill hole (DDH) CF419-2011 located in the Liard zone intersected 0.46% copper, 0.41g/t gold, 0.043% molybdenum and 2.15g/t silver (0.96% copper equivalent) over an interval of 110.8m starting at a core length of 10.2m.

    DDH CF419-2011 also intersected 0.55% copper, 0.20g/t gold, 0.013% molybdenum and 1.88g/t silver (0.76% copper equivalent) over an interval of 136.7m starting at a core length of 121.0m,

    Diamond drill hole (DDH) CF415-2011 located 284 metres (m) north and 81m east of DDH CF409-2011, intersected 0.49% copper, 0.55g/t gold, 0.04% molybdenum and 8.79g/t silver (1.10% copper equivalent) over an interval of 65.53m starting at a core length of 99.00m

    DDH CF413-2011 located 119m north and 86m west of DDH CF411-2011, intersected 0.34% copper, 0.21g/t gold, 0.03% molybdenum and 2.25g/t silver (0.65% copper equivalent) over an interval of 130.65m starting at a core length of 161.00m

    Diamond drill hole (DDH) CF411-2011 located 140 metres (m) north of DDH CF410B-2011, intersected 0.49% copper, 0.30 g/t gold, 0.04% molybdenum and 2.43 g/t silver (0.91% copper equivalent (CuEq) over an interval of 387.8m starting at a core length of 287.0m.

    The 387.8m interval in DDH CF411-2011 is included in a 590.4m interval that averaged 0.39% copper, 0.25 g/t gold, 0.031% molybdenum and 2.06 g/t silver (0.73% CuEq). This drill hole stopped in 0.72% CuEq mineralization at a vertical depth of 615m below surface

    DDH CF412B-2011 located 50m south and 75m east of DDH CF402-2010, intersected 0.48% copper, 0.27 g/t gold, 0.038% molybdenum and 3.61 g/t silver (
    0.89% CuEq) over an interval of 145.2m starting at a core length of 106.58m

    The 145.2m interval in DDH CF412B-2011 is included in a 529.5m interval that averaged 0.38% copper, 0.28 g/t gold, 0.023% molybdenum and 2.30 g/t silver (0.70% CuEq) over a core interval of 529.5m from 106.58m to the end of the hole.

    Diamond drill hole (DDH) CF410B-2011 located 104 metres (m) east of DDH CF407-2011, intersected 0.30% copper, 0.10 g/t gold, 0.02% molybdenum and 1.23 g/t silver (0.52% copper equivalent) over an interval of 250.75m starting

    DDH CF410B-2011 intersected a second interval of mineralization that averaged 0.51% copper, 0.18 g/t gold, 0.026% molybdenum and 1.42 g/t silver (0.78% copper equivalent) over a core interval of 24.68m from a down hole depth of 544.60m to a depth of 569.28m

    Diamond drill hole (DDH) CF409-2011 located 147 metres (m) east of DDH CF402-2010 (see News Release dated February 3, 2011), intersected 0.43% copper, 0.27 g/t gold, 0.04% molybdenum and 1.70 g/t silver (0.81% copper equivalent) over an interval of 154.30m starting at a core length of 319.13m.

    DDH CF408-2011 is located at the collar of DDHCF407B-2011 and was drilled to the west and intersected 0.42% copper, 0.07 g/t gold, 0.05% molybdenum and 2.45 g/t silver (0.74% copper equivalent) over a core interval of 76.98m from 114.78m to a depth of 191.76m

    Diamond drill hole (DDH) CF407-2011 located 140 metres (m) east of DDH CF399-2010, intersected 0.65% copper, 0.53 g/t gold, 0.034% molybdenum and 3.80 g/t silver (1.18% copper equivalent) over an interval of 160.36m starting at a core length of 264.2m.

    DDH CF407-2011 intersected 0.40% copper, 0.24 g/t gold, 0.025% molybdenum and 1.98 g/t silver (0.69% copper equivalent) over a core interval of 519.2m from 5.3m to a depth of 524.47m

    The higher grade mineralization intersected in DDH CF405 has significantly extended the mineralization intersected in DDH CF398, by 175m to the east, and 100m below the mineralized intersection reported in DDH CF398. The zone is open at depth, to the North and to the East. DDHCF405 intersected 0.473% copper, 0.344 g/t gold, 0.023% molybdenum and 2.22 g/t silver (0.82% copper equivalent) from 164.0m to the bottom of the hole at 648.31m a core interval of 484.31m

    DDH CF406 is located 250m south and 137m east of DDH CF399. Drilling was suspended in low-grade mineralization similar to that intersected in the upper 164m of DDH CF405. DDH CF406 intersected 0.54% copper, 0.10g/t gold, 0.023% molybdenum and 1.54g/t silver (0.73% copper equivalent) over 15.4m from 126.6m to 142.5m. The hole is cased and will be completed when drilling resumes in 2011

    The deeper portion of the higher grade mineralization located to the East and at depth below pre-2010 drill holes averages 0.447% copper, 0.327 g/t gold, 0.029% molybdenum and 2.51 g/t silver (0.81% copper equivalent)

    The high grade mineralization intersected in DDH CF402 has significantly extended the high grade mineralization intersected in DDH CF398, a distance of 154m north and 175m to the east. The mineralization in this hole is open at depth, to the North and to the East. This hole intersected 0.31% copper, 0.324 g/t gold and 0.033% molybdenum and 2.27 g/t silver (0.70% copper equivalent) from 4.57m at surface to 581.25m a core interval of 576.68m

    - DDH CF403 is located 152m south and 78m west of DDH CF 399. This hole intersected 0.46% copper, 0.29g/t gold, 0.02% molybdenum and 3.31 g/t silver (0.76% copper equivalent) from 38.42m to 89.00m a core interval of 50.58m,

    - DDH CF399 intersected 0.39% copper, 0.10 g/t gold and 0.05% molybdenum and 2.09 g/t silver (0.67% copper equivalent) from 9.14m to 517.24m a core interval of 508.1m,

    - DDH CF399 includes a higher grade interval of 0.45% copper, 0.33 g/t gold and 0.06% molybdenum and 3.01 g/t silver (0.94% copper equivalent) from 462.7m to 517.24m, a core interval of 54.5m at the bottom of the hole,


    - DDH CF401 intersected 0.43% copper, 0.25g/t gold, 0.04% molybdenum and 2.40 g/t silver (0.75% copper equivalent) from 5.66m to 495.9m a core interval of 489.5m,

    - DDH CF401 includes a higher grade interval of 0.66% copper, 0.50g/t gold, 0.04% molybdenum, 3.10 g/t silver (1.17% copper equivalent) from 345.4m to 429.2m, a core interval of 83.8m at the bottom of the hole, and


    Diamond drill hole (DDH) CF398 has intersected 0.70% copper, 0.42 g/t gold, 2.80 g/t silver and 0.04% molybdenum (1.13% copper equivalent) over an interval of 54.3 metres (m) of copper mineralization starting at 7.1 m below surface confirming the potential to outline a higher-grade "starter pit

    DDH CF398 intersected a higher grade of mineralization that assayed 0.47% copper, 0.37g/t gold, 3.00 g/t silver and 0.02% molybdenum (0.78% copper equivalent) over a 213.7 m interval from 325 m to the bottom of the hole at a depth of 538.7 m.

    1. Here are the Proven and Probable mineral reserves from the Feasibility Study:

      Highlights of the Feasibility Study (all amounts are stated in Canadian dollars):

      • Nominal 130,000 tpd open pit mine feeding a concentrator with two Semi Autogenous Grinding ('SAG') mills;
      • Initial Capital Cost ('Capex') totals $3.256 billion, which includes contingencies of $374 million;
      • Sustaining Capex totals $1.240 billion over the proposed mine life, including $200 million for BC Hydro tariff;
      • Life-of-Mine ('LOM') metal production contained in concentrates totals 4.88 billion pounds ('lbs') of copper, 4.21 million ounces ('oz.') of gold, 214.92 million lbs of molybdenum and 25.10 million oz. of silver;
      • 5 years pre-production period followed with a productive mine life of 21 years;
      • Proven and Probable Mineral Reserves total 940.8 million tonnes containing 5.6 billion lbs of copper; 5.7 million oz. of gold 363.5 million lbs of molybdenum and 51.7 million oz. of silver on the basis of drill data up to May 23, 2012;
      • Within the pit shell there is a total of 171.16 million tonnes of inferred resource grading 0.25% copper, 0.018% molybdenum, 0.164 grams per tonne ('gpt') gold and 1.58 gpt silver which for purposes of this study must be treated as waste rock;
      • LOM average mill feed grades 0.271% copper, 0.191 gpt gold, 1.716 gpt silver, 0.018% molybdenum and a copper equivalent ('CuEq') of 0.441%. The CuEq is back calculated based on how much in situ copper is required to provide the same after recovery value to equal the combined metals value after recovery. The formula is: CuEq = NSR / (CURec*NSPcu*22.046) NSR=RecCU*Cu grade*NSPcu*22.046+RecMO*Mo grade*NSPmo*22.046+RecAU* Au grade*NSPau+RecAG*AG grade*NSPag , where "Rec" is the recovery based on the recovery formula and grade is in situ with no loss or dilution applied.
  3. YourNadir, if your scenario plays out, I will not be selling any shares. I'll be much happier, but no selling.

    As for the rest of you who decided to take YourNadir's post OFF TOPIC and throw out the usual complaint that have been repeated time and time again, do you care to share your opinion on his scenario.

    If not, start your own thread. Geez.