Timelines

If you recall I had a discussion about timelines at the end of January where I said I wasn't expecting any drilling. My position still stands in view of the fact we haven't had any drilling announced. This is what I was hoping to see and as far as I'm concerned we're on schedule.

Here it is from that discussion:
If the 2014 drill program is weak, then I think we are closer to the end. If the program is strong, then I think they will need to incorporate that data once they get it and that's putting us through the end of this drilling season before they begin.

1. grey area where nothing happens, nothing is announced and nobody knows what is going on in SC, spring-summer 2014

2. Drill Results from AZ, spring-summer 2014

3. New PFS from AZ released to much fanfare, summer 2014

2. buyout SC, late summer 2014

3. Desert Fox spin-off, early fall 2014

--http://agoracom.com/ir/CopperFoxMetals/forums/discussion/topics/599692-timelines/messages/1881405#message

Prospekt

Reply in Copper Fox Metals Inc.

I like a good timeline. (Or a good attempt at a timeline.) I was going to look at it point by point, but I think you are wide of the mark in most of them because of your underlying assumptions. You assume that the drilling in 2013 was not stellar, but perhaps it was good enoug...

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

    1. My limited understanding is that in order to incorporate the inferred they needed to expand the pit walls so that they could dig deeper. The question of the inferred will not likely be settled for decades until they get down there.

      Vette has outlined the stages of mine development in the post below and the engineering to expand the pit and do a final design comes after the FS and after the exploratory drilling.

      That's why I think we are closer to the end without drilling, than with drilling.

      This should have been expected, not a surprise and it tells us they are getting closer to putting this into production.

      They need the engineering in order to submit the EA because the engineering will produce the final mine pit plan.

      This is good and I really do think my timeline is accurate.