''Other Copper Projects

A small technical work program at Galore Creek is planned for 2014 to incorporate the results of recent drilling activity and engineering studies, with no significant field activity planned. No significant work was done in the fourth quarter at Schaft Creek. Some engineering studies will continue, but no drilling activities are planned for 2014.''

This is a typical Teck Q4 hush hush on spending, it's a forward statement on 2014 for their shareholders. Teck won't come out and say it out loud (not yet).

The official JV meeting is in March, that's when the actual program will be announced.

BTW Elmer has already met with Teck and SC is heading exactly where he wants it.

The Teck AGM is in April.

No drilling = they've seen enough. (we have 2 Billion tonnes)

Engineering studies = moving forward

I'm sure Hole 435 convinced Teck. Hole 435 hit 0.44%CuEq in the inferred block. Higher grades in the inferred block than in the average M&I block.

http://www.copperfoxmetals.com/i/maps/2013_X_sect_6360500.jpg

Schaft Creek is the only project Teck is spending money on. Engineering work is the next step toward a production decision, CUU won't be around for a production decision.

Elmer will probably have Teck squeeze in 3-4 very strategic drill holes as the engineering work is ongoing. You just won't see that in a Teck Q4 forward statement....

You want to see metallurgical work, bump up copper recoveries just 1%..how about 2% and WOW.

This was in the Feasibility enhancement and they are doing it:

Project Enhancements

The Feasibility Study makes recommendations for further development of the project that could enhance the economics of Schaft Creek including:

  1. Copper Fox undertakes a diamond drilling program at Schaft Creek with a goal to determine the extent to which the 171.16 million tonnes of inferred resource, that lie within the pit shell, can be upgraded to a Measured or Indicated Resource. To the degree such a program is successful it will remove the affected material from being categorized as a rock removal expense to an ore bearing material and as such, a revenue generator; and
  2. Additional metallurgical testwork to pursue opportunities to increase metal recoveries and reduce processing costs.
  3. Shorten the project development execution timeline.

Elmer is going to sell this, internal work is being done. Schaft Creek is moving forward.

Arizona looking very very promissing...make sure to sell me all your shares free shares the second Desert Fox is spun...

BTW, this is useful:

https://www.minewiki.org/index.php/The_stages_of_mine_design

Total project design sequence


Project studies and design fit into the total project design sequence as follows:

  1. Pre-evaluation study - Exploration drilling, preliminary orebody identification, and venture studies.
  2. Concept or Scoping study – This study will present a number of possible options (including “outside the box” options) and provide a very high level review of these options. A conventional (minimal risk) option will be outlined in more detail and an order-of-magnitude cost/schedule developed to a scoping study level of accuracy in order to determine if the site is or has the potential to become a viable project. A successful scoping study will lead to additional work in several areas, including additional diamond drilling for geological resource upgrade, initial geotechnical studies, initial hydrogeological studies, initial metallurgical studies, a start of environmental baseline data collection, and the start of a pre-feasibility study.
  3. Pre-feasibility study – Based on the possible options presented in the scoping study, a number of trade-offs will be completed and a preferred Base Case option will be identified. The preferred Base Case option will be developed to a pre-feasibility study level of accuracy to provide some level of confidence in the production capacity/ore grades/metal recovery, capital and operating costs, project schedule, and project risks/opportunities. A financial analysis will be completed in order to assess the economic viability of the project. A successful pre-feasibility study will lead to additional work including detailed geotechnical and hydrogeological studies, detailed metallurgical testwork and initial process studies (process flowsheet defined), the start of a formal community consultation process, the start of Environmental Impact Assessment and permitting processes, and the start of a feasibility study.
  4. Feasibility study – The pre-feasibility study selects a Base Case option and provides a mid-level accuracy capital/operating cost, schedule, etc. The feasibility study includes the collection of more detailed information, additional designs, collection of additional project-specific cost information (including vendor quotes for major items) in order to refine the project cost and schedule. The study will also address any information gaps, issues of concern, risks, and opportunities identified in the prefeasibility study. This document must provide the level of confidence for senior management to support the commitment of funds and other resources (often hundreds of millions of dollars) for the detailed project design, project construction, and operation/closure of the facility. A successful feasibility study will permit other parallel activities to continue, including procurement of major (long-lead) plant equipment and materials, finalization of permit applications and submissions for permits, and planning for construction, training programs, safety programs, etc.
  5. Detailed engineering – This stage includes completion of detailed designs based on the project scope and concept designs approved in the feasibility study, and the issuing of “for construction” designs, provision of construction and equipment specifications, scope of work packages for contract documents, definition of and procedures for construction quality control, etc. The purchase of key plant equipment often occurs prior to or in parallel with this stage of design, as vendor drawings for equipment are required in order to complete the detailed engineering designs.
  6. Site Construction – During the course of construction, “home office” and field engineering will address construction change and drawing/specification clarification issues which arise during the course of construction, carry out inspections to confirm that construction is as per the design, and confirm adherence to appropriate quality control practices. Site engineers may also be required to confirm appropriate as-built records are kept, assemble records of vendor documents (installation instructions, operating manuals, maintenance manuals), and other construction control activities.
  7. Commissioning and turn-over to operations – Vendor representatives and field engineering personnel take part in the formal completion of the project including proof of operability testing and acceptance by the Owner that the project construction and performance is as per the design and that it meets the required plant performance and safety requirements. In parallel, the final operating control programs are completed, installed, and tested. All final project information including final design packages, as-built drawings, contract packages and contract close-out documents, operations and maintenance manuals for equipment, quality assurance/quality control records, commissioning records, etc are assembled and formally turned over to the Owner.

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. This is a typical Teck Q4 hush hush on spending, it's a forward statement on 2014 for their shareholders. Teck won't come out and say it out loud (not yet).

    The official JV meeting is in March, that's when the actual program will be announced.

    BTW Elmer has already met with Teck and SC is heading exactly where he wants it.

    The Teck AGM is in April.

    No drilling = they've seen enough. (we have 2 Billion tonnes)

    Engineering studies = moving forward

    I'm sure Hole 435 convinced Teck. Hole 435 hit 0.44%CuEq in the inferred block. Higher grades in the inferred block than in the average M&I block.

    http://www.copperfoxmetals.com/i/maps/2013_X_sect_6360500.jpg

    Schaft Creek is the only project Teck is spending money on. Engineering work is the next step toward a production decision, CUU won't be around for a production decision.

    Elmer will probably have Teck squeeze in 3-4 very strategic drill holes as the engineering work is ongoing. You just won't see that in a Teck Q4 forward statement....

    You want to see metallurgical work, bump up copper recoveries just 1%..how about 2% and WOW.

    This was in the Feasibility enhancement and they are doing it:

    ---------------------------------------------------------------------------------------------------------------

    Vette nice to see you back. But, how is this (hush hush) for thier share holders. Is that s secret code? Not being funny but how do you know that?

    How do you know that Teck has seen enough?

    As for the engineering studies moving forward, I spoke to Elmer just a week or so ago. He (Elmer) told me that this is the information that he wanted Teck to come out and say. He (Elmer) wanted Teck to announce that they are moving into a engineering program, That means that they "WILL" take this into production.

    My information might be old. Did you Get this information latley?

    I want Teck of Elmer to place 3-4 holes too, but doesnt sound like Teck is spending money on Shaft Creek. Where did you hear this. "OR" can you back this up.

    Look, im not bashing anyone or putting anyone down. I just want to know how this info can come to light when I did not read any of this and Elmer did not tell me any of these,

    This is not speculation on your part is it?

    1. dogger my dad once told me you can lead a horse to water but you cant make him drink .

      this is not meant as a put down, just trying to convey vettes thoughts in a diffent light

      regards art

      1. dogger my dad once told me you can lead a horse to water but you cant make him drink .

        this is not meant as a put down, just trying to convey vettes thoughts in a diffent light

        regards art

        Hey Art, never at all took it as a put down.

        Look folks, im not putting no one down. Timelines have came and gone...lots of speculation has happened and I for one have done lots of that too, I got caught up in the hype many times.

        But we all have LOTs of money in this stock. we went from all time highs to close to our lows? We are just part of the market....the market sees this too.

        Why is it that only a few or should I say "ME" can not see this.

        I want to believe....trust me I really do, and everytime ive bought more to get my average down. The market goes down futher.

        I have spoke to managment many times and "YET" have they said any of this...Now they have speculated in times lines themselves and they have come and gone too, but that is business.

        Now I dont look for any hid`in message in statments. Elmer himself told me that he wanted Teck to go into engineering program. That means that they are taking Shaft Creek into production. But now Teck is not spending any money?

        So somewhere I`ve lost it.

        all I wanted to do is back it up because I did not get or was told this.

        1. Dogger, it's reading between the lines. It's a process and the next logical step toward a production decision are the engineering studies, which are now being undertaken.
          1. We have read between the lines before - and have always got it wrong.

            Why are Doggers questions stirring up everyone so much. They are fair questions. He isn't bashing...

            We all want to see this sell, but clarification on whether statements made are speculation or based on fact should be answers we all want to hear?

              1. Replying to @powersurge99

                Well, come on. Even Youngmoney took the Teck news as they have committed a lot to Fort Hills (~$3 billion committment) and not much left for us. This was his summary - see the last paragraph of his post.

                All we got from the release was that essentially no work was done on us 4th quarter, no drilling for 2014, and some engineering work will be done. To me when "some" is used as a modifier for a statement it says to me that there will be only a limited amount of work not a both feet in full commitment.

                From reading the release without 'interpretation', it doesn't seem like we are a high priority. I'm just being honest about how I see it. Everyone is welcome to share the popular opinion, though, I just can't.

                  1. Replying to @CuuVenturer

                    Read the PDF file page 31 New mine develep. Copper. 120 million Qb2. 100 million No mention of who gets the remaking 20 million Just curios because our next check from Teck should be this amount Trying to connect the dots. IMHO Good luck to all. Fast fox
            1. Replying to @hoghead

              Who is getting stirred up? Of course it's speculative on Vette's part. He is just putting the pieces together. Nothing is certain. The probability just gets closer with each step.
          2. Dogger, it's reading between the lines. It's a process and the next logical step toward a production decision are the engineering studies, which are now being undertaken.

            GOD, I hope you`s are right.

            I have herd read between the lines in 2011,2012 and 2014.

            Ive seen where my investment has gone.

            I have averaged down just to find that the SP went lower. So I suck at trying to determine how low this will go.

            I understand that this is the next logical step, but with getting rid of the Salizar agreement, tranfer the port.etc....now they are spending money on Galore Creek which we all thought that Shaft Creek was the better choice?

            I might be reading to far between the lines.

            I just can not get it out of my head that Elmer told me " we want Teck to announce an egineering program"

            I did not get that, sorry.

            I will also add, I have no intentions of selling my shares. gonna hold out for the long haul I guess.

        2. But now Teck is not spending any money?

          Did Teck say they wouldn't be spending any money? I can't see that section.

          They said some engineering studies are planned, but no drilling. That doesn't mean no money will be spent.

          For instance what about the new camp I've been hearing about, or the work on the roads. They could be looking at the recoveries to improve them. There is a lot of work that can be done pre-production and on the mine pit plan.

          1. But now Teck is not spending any money?

            Did Teck say they wouldn't be spending any money? I can't see that section.

            They said some engineering studies are planned, but no drilling. That doesn't mean no money will be spent.

            For instance what about the new camp I've been hearing about, or the work on the roads. They could be looking at the recoveries to improve them. There is a lot of work that can be done pre-production and on the mine pit plan.

            Your right Prospekt

            I guess the next step for me is to phone Elmer again and see if "Any" work will be done on Shaft Creek?

            When I posted just a week or so ago when I spoke to Cathy. I asked "If any work will be done on moving the waste material" she told me, they "think" they will be looking into it.

            So I just would love to get 100% confirmtion . THen I might be asking for too much?

            1. Replying to @Dogger 12

              make your questions broader to Elmer. Instead of asking "are you looking to move the waste material". Ask instead "Whats happening at Schaft creek over the next couple months, is there a possibility of a road being developed?, has anyone started building a camp at schaft creek?" etc... Questions to direct make it really tough to answer in case some of the answers require breaking compliance...

      1. pdac.ca

        The PDAC Investors Exchange is a "must attend" annual event!

        Taking place at the Metro Toronto Convention Centre from March 2-5, 2014, PDAC is the leading investment show dedicated solely to the mineral industry.

        Register for a free Investors & Select Presentations Pass and access the Investors Exchange showcasing over 600 exhibitors, the Letter Writer Presentations for Investors featuring your favourite industry commentators, and the Corporate Presentation Forum for Investors showcasing presentations from a select group of mining and exploration companies.

        With the Investors & Select Presentations Pass, you will also have access to Core Shack exhibits, Presentation Rooms, the Prospectors Tent and the Innovation Forum.

        • Over 30,000 industry representatives attend.
        • Comprised of over 600 exhibitors including junior exploration companies, major mining companies, mid-sized producers, prospectors and stock exchanges.
        • Great opportunity for face-to-face conversations with exhibitors about their current activities and investment potential.

        Exhibitor list by name:

        In Toranto

  2. That's exactly what Teck wants the world to assume, that is, until they have all their ducks in a row for the big reveal. Then, perhaps all the dots that we try to connect here might draw a picture for skeptics that some of us have being seeing for a while.

    ===========================

    I sincerely hope you are right Golf, but Teck was so up front with all its other projects, why is ours the only secret one?

    Back when they were considering getting into iron ore they talked about it in interviews and such. It was openly discussed wasn't it?

    I can't personally let a dot-connected picture overshadow what I am reading in plain english. I have lost faith in trying to connect dots and base my personal opinion on what is factually stated. I am not putting anyone down for trying to connect dots, and everyone is welcome to their opinions.

    I still haven't sold a share. I just can't get excited till I see something actually happen. Too many dashed hopes in the past. I am not adding or selling off so when something good happens I will be happy then.