Rick Mills, writing for Ahead of the Herd has written that a pound of copper in the ground is worth $.04 per pound in an acquisition. (That would be a pound in South America, not just anywhere.)

He then goes on to say,

On the flip side, the assets of a company such as operational experience, speed to production advantage and in place financial partners for production are the “intangibles” that ultimately create the most shareholder value.

Under these circumstances, he writes, most analysts would support a valuation that is 5X cashflow.

Teck, our SC partner, has the operational experience and financial abilities that provide these intangibles.

So, our share of the cashflow under production is $113M per year. That would give us a valuation of $565M as an acquisition, or $1.36 per share.

This valuation does not include the value remaining in our contract with Teck which is another $40 million cash. (I'll ignore the $60M Teck is spending that we won't owe back because that forms part of the "speed to production" value.)

What the heck...add that $40M in and it works out to $1.46 per share.

Cashflow is very important because all in-situ copper is not equal. Even at the current rate of $1.04 per pound Schaft Creek is a far better project than many others. (Take NCU, for instance, whose cash cost per pound is $1.58 for the first 5 years then $1.69 thereafter, well over the median price of about $1.50. Los Lambos has a whopping cash cost of $1.89 per pound.)

Taking a flat price per in-situ pound of copper is too simplistic and misleading a method for calculating value. Starting with the cashflow allows you to incorporate everything except geopolitical risk, and allows comparisons between projects on a more even footing.

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. Good point Prospekt. Double our production rate to over 200K tons/day and improve the recoveries and other cost reduction areas such as the 171M tons of waste to cash producing ore and what does that do to our net cash flow? I would say then we are valued more closely to $3-$4 per share. Also, since SC has a low geopolitical risk profile we can add a premium to those valuations too. We are extremely undervalued at these levels and I would not be surprised if we are taken out for well over $3.50 when all the optimization studies are completed and Teck makes a bid for us before year end.

    Teck would still be getting a bargain for SC since they have paid only $24M to us thus far and a take out at $3.50 would give them SC for the total cost of 24 + 3.5x 415m = 1.47B. For a district that could be worth closer to 5B in value they are getting it all for 1.47B or just roughly 30% of the entire cake. They could then turn around and sell 50% to a partner and still be miles ahead. That is why, imho, we will never hear of their decision to build a mine. We will just be taken out one day and this will surprise many analysts. My 2 cents.

    1. We will just be taken out one day and this will surprise many analysts.

      I heard that Eric Sprott was very surprised when told that Teck backed into the JV. I'm sure most everyone was based on the FS, but the fact remains they did and there has to be a reason. They wouldn't waste their time and money and personnel on the project if they didn't think it was possible to make it a profitable mine.

      Teck obviously is looking at different data. They ran their own parallel FS, and Mike said he thought they could show up to a 40% discount on the capex. I'm not sure about opex. Improving the recovery rates would help tremendously.

      I don't think they're going to bother trying to move the inferred into the reserve category. Last year their technical drills were the more important ones to see if they could open up the pit shell and those were good.

      The next thing we're going to hear about is the BCHydro study. That figure will be added into their calculations and then maybe the EA application will be submitted. At that point we might get a sense of how much they can improve this project--or, as you say, we'll just get taken out.

  2. I was intriqued by Rick Mills theory of 5 times cash flow valuation.

    I realize Prospekt got the $113million/year number from the presentation slideshow.

    But does anyone know if this figure is under the base case analysis?

    Reason I ask is that I was trying to look up the sensitivity analysis and in Figure 22.4 , NCF under ROV is much higher than NCF under the Base Case analysis.

    So without all the tweaking, just looking purely at a real option valution, our NCF should more than the $113 figure. If so, I feel the $113/year figure should be somewhat of a worst case scenario number.

    1. Yes, I think that $113Million is the annual Net Cash Flow of the CUU share at the base case of NPV 8%.

      That means that almost any other valuation would be higher.

      Incidentally, Rick Mills, was talking about projects that were not yet in production.

      We have often heard that we can use the NPV 5% once the environmental assessment is approved. The NCF at 8% is about 30% of the NPV at 5%. The ROV is sky-high.

      This is just one method of valuing projects suggested by someone with a lot of experience. We don't really know, of course, how this will relate to the realized value of our share of SC. We also have that 1.8% of Liard (?) that is not included in this JV with Teck.

      I guess the point is if you have a project that will pay you $113Million per year after payback, for 20 years--how much of a multiple do you pay for it? Do you pay five years earnings to get 15? That's all he's doing, is suggesting a standard assumption for the industry.

      In our case they probably assume that the mine life will be longer than 20 years. They can probably assume that the average cost per pound of copper could even be lower than the $1.04 it is today. Teck's average cost per pound of copper is around $1.79, which is much higher than the median of $1.50. Don Lindsay always talks about the cost per pound and how important it is in their decision-making.

      Another way of looking at it is if we were to keep the project and receive 27 cents per year for 15 years, or $4.10 per share in total. ($113M/413M shares = $.27) I think that is a deal I would take.

      1. Another way of looking at it is if we were to keep the project and receive 27 cents per year for 15 years, or $4.10 per share in total. ($113M/413M shares = $.27) I think that is a deal I would take.

        Bang On! This is why EE may decide to just ride out into production. Why not hold 25% of a producing mine? This is a great dividend option for EE, based on these numbers he would be making +$70M a year just holding his shares and entertain endless offers.

        The downside of improving the economics of SC, converting the "waste" rock, and increasing the size of the mine is that it makes the project even more expensive to purchase. In a climate where many companies are cutting spending this would make it less plausible for a buyout to occur in the near term.

        However, if Teck advances the project and the EA submitted. Prospekt's note about keeping the project going forward becomes a greater possibility.

      2. right on guys! and....while not easy to value the "add on" element of the other as yet under explored SC area properties, imo they are worth some extra consideration($) to TCK or other major. also 20+ years in-situ development is just for starters.

        glta,

        sb

      3. Another way of looking at it is if we were to keep the project and receive 27 cents per year for 15 years, or $4.10 per share in total. ($113M/413M shares = $.27) I think that is a deal I would take.

        I sure hope not........this is not at all why I invested into this company, to think this would be a 15 year investment, plus the 3 years I have already been waiting ......ugh! Unless Copper Fox's motto has changed, I can't think or hope this wouldn't happen. even in talking with Elmer, has said he doen't want to go this route.

  3. Golf......I must say, that thought process makes sense, 100%. Thank you for sharing. I knew I needed patience with this investment, just didn't forecast it to perhaps work out this way, that's all. Still in to the end....

    1. Elmer put out the question to the after session crowd at Smithers " would it be so bad if we didn't get bought out and just collected dividends".

      He was talking about "what if" at the time. Not something he was promoting.

      What would the share price climb to if investment funds knew they could collect $0.27 per share for 20 years?