This has been discussed a bit recently. I recall someone saying that they had spoke to a person who works at BC Hydro who said the NTL was behind schedule "but only by a couple of weeks".

The following link says its on schedule to be fully commissioned and in service by May 31st. https://www.bchydro.com/energy-in-bc/projects/ntl/construction_schedule.html

I recall that the results of the BC hydro study commissioned by CUU last year should be made public soon, which coincides nicely with the looming completion of the NTL and that the results of this study and what Teck decides to do next may tip its hand to its intentions. I think Prospekt mentioned that there would be an additional hydro study requested by Teck that would indicate, among other things, the size of the mine being planned.

Do I have this right? Am I missing something? Does anyone have further info on this next apparent step in our CUU odyssey? Thanks in advance for any info.

K

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. BigBuck said that he asked about the BC Hydro study at the AGM and was told that the study was in Teck's hands at the moment and it will lead to a more detailed study once the optimization studies are complete with a new mine plan.

    This is what they said comes next after the Agreement is approved, however, if they are going to change the size of the mine then they might need to rework the original study. Or, maybe it is a quick update once the basics are taken care of because I'm sure Elmer would have told them that it could be upsized.

    Upon completion of the Study and following presentation, review and acceptance of the Study, Copper Fox expects to sign a facilities agreement whereby BC Hydro would then implement interconnection work, including detailed design and engineering, procurement for major equipment and construction and commissioning of the facilities.

    BCHydro recently told the Press that they would not be able to meet the May 31st deadline. They weren't officially specific about how long the delay would be but someone did say they had called and were told it would only be a matter of weeks. The Hydro guy said about two weeks of checks on the line needed to be done before it was energized.

    I'm sure there will be a big photo op moment with the Premier when the switch is flipped.

    1. RED CHRIS CONSTRUCTION UPDATE

      Construction by BC Hydro of the 287kv Northwest Transmission Line (NTL) from Skeena substation to Bob Quinn continues, with the targeted completion date now the end of June 2014, a month later than the end of May 2014, as previously scheduled. Construction by the Company of the 93 kilometre Iskut extension of the NTL from Bob Quinn to Tatogga is now expected to be completed by the end of July 2014, also one month later than the end of June 2014, as previously scheduled.

      http://www.imperialmetals.com/s/News_2014.asp?ReportID=653443

      From Imperial Metals, they said NTL would be finished by end of June as the targeted completion date.

  2. Thanks golfyeti, i try to post but most of the time we have a lot of good posters that are the first at it and with our limited NR, it's even tougher to post.

    I've talked to Elmer occasionally and I can tell he wants this company to perform well, he wants to make money for the shareholders.

    That's how some of my DD is based on. A collective contribution to patch together pieces of puzzles.

    This is what we have as information so far from the top of my head.

    1. NTL is estimated to be completed by June.

    2. Teck and the BC Hydro report.

    3. Our current FS is what I would call a conservative look into SC. Until we get the opimtization studies back, we don't know what our full value is until we incorporate the study of the recoveries, lower CAD$, and the waste.

    4. What metrics can we use to value SC? The Agusta deal? How do we value the JV agreement with the financing by Teck?

    5. I think this is one of the more important parts of putting everything together is that the $1.65 options insiders and management owns has not be repriced when so many other juniors has repriced their options. This gives me a lot of confidence that they believe CUU shares should be worth at least that price.

    Feel free to join in!