From today’s INK Research Morning Report, September 25, 2014

Set for a rebound? Multiple buying at Teck Resources

. . . . . . . .

Overview: Sentiment and Stocks

Mining stocks are well into correction mode with the S&P/TSX Composite Metals & Mining Index off 12.9% over the past month. Much of the weakness has been driven by a soaring US dollar as traders bet that the Fed's approach to monetary policy will become more restrictive in the months ahead due to a firming economy. We may get a better sense today on how solid the assumption is regarding US economic growth on the back of data for weekly jobless claims and durable goods orders for August.

Regardless of today's economic news, a lot of optimism has already been priced into the greenback. It may be tough for the dollar to keep climbing without some period of consolidation or possibly even correction. That could help stabilize commodity prices at least for the short-term. Moreover, if the US economy is as strong as some believe, industrial mining stocks could eventually see some fundamental support with respect to a pick up in demand for their underlying commodities. On balance, the case for at least a short-term rebound in industrial commodity stocks is growing.

With that in mind, today we highlight insider activity at integrated senior miner Teck Resources (TCK.B). Overall, the stock has a mostly sunny INK Edge outlook thanks to relatively attractive insider and valuation characteristics. While price strength is weak, the recent move may be overdone as the stock's relative strength index (RSI) remained under 30 as of yesterday's close of $22.00. The combination of technically oversold conditions as indicated by the depressed RSI plus insider buying suggests the stock may be set for rebound.

. . . . . . .

On September 22nd, Teck Resources director Mayank Mulraj Ashar bought 5,000 shares in the public market at $21.41. On the same day, senior officer Robin Sheremeta bought 1,000 shares at $21.57.

Earlier on September 19, 10% holder Caisse de dépôt et placement du Québec bought 410,700 shares between the prices of $21.94 and $23.11.

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. given that Elmer is focused on tax efficient liquidity events there is a good likelyhood that a buyout will involve Tck.b shares. I would happily accept a somewhat discounted SC valuation in favor of super cheap tck.b shares.

    With due respect, can you tell me why you feel Teck needs to buy out Schaft Creek? I didn't think Teck needed to buyout Schaft Creek as they already have the port and the required lands. Am I missing something?


    1. With due respect, can you tell me why you feel Teck needs to buy out Schaft Creek? I didn't think Teck needed to buyout Schaft Creek as they already have the port and the required lands.

      They have 75% of the port and lands and, in Copper Fox, they have a partner who is not required to arrange any further funding. The next $57.5 million they spend is on their dime entirely, and they owe Copper Fox a further $40 million by the time the mine is built.

      I think Teck likes to have a partner in most of their projects to share the costs and mitigate their finances so that they aren't on the hook for 100% of the funding while owning 75% of the project.

      1. "They have 75% of the port and lands and, in Copper Fox, they have a partner who is not required to arrange any further funding. The next $57.5 million they spend is on their dime entirely, and they owe Copper Fox a further $40 million by the time the mine is built."

        Can you explain how they could own 75% of the port? The JV has the port secured and Teck is in control of the JV. Therefore, Teck controls the port. Zero need to buy out CUU because of the port access. Same goes for the land.

        1. The JV has the port secured and Teck is in control of the JV. Therefore, Teck controls the port. Zero need to buy out CUU because of the port access. Same goes for the land.

          That was my impression as well.

        2. "Can you explain how they could own 75% of the port? The JV has the port secured and Teck is in control of the JV. Therefore, Teck controls the port. Zero need to buy out CUU because of the port access. Same goes for the land."

          It's called a Joint Venture because Teck has 75% and CUU has 25% of

          The Stewart bulk terminal

          The Schaft creek mineral tenure acquisitions

          The shares respresenting the 78% interest in Liard Copper Mines

          Teck has 100% control over the B.C. Hydro Agreement.

          1. "Teck has 100% control over the B.C. Hydro Agreement."

            Is there a chance we/they could lose the hydro if Tech doesn't make a decision on the mine soon?

            1. Replying to @treborjim

              If that is the case, then Teck maybe forced to play it's hand soon

              . If Teck intends to develop SC there is no way it can let a deadline with BC Hydro pass ( assuming that there is some sort of deadline )

            2. Replying to @treborjim

              Is there a chance we/they could lose the hydro if Tech doesn't make a decision on the mine soon?

              Someone reportedly asked Elmer about this and he said that BCHydro will wait. Teck needed the information from BC Hydro on the costs associated with putting in the hydro for their optimization studies.

              Elmer told me that they talk to the environmental people quite often, including at the federal level. He told me he's met with Christy Clark as well. Teck would have also met with all the people involved before backing into the project.

              The Hydro doesn't run along Mess Creek in the same area as the future roadway so I would imagine it gets done separately. I'm not sure if they do an environmental assessment for that alone but, if so, all the other projects would need the same permits.

              I don't think the Hydro is going to cause a delay if Teck decides to go ahead with the project now because there aren't any other projects all ready with their permits, and they must have taken this into account when they queued us up.

              I guess the Hydro costs are one more piece that Teck will reveal at that JV meeting in October.

            3. Replying to @treborjim

              According to this new release the timeline is 6 months to 3 years starting from May 31, 2014.

              Vancouver, British Columbia - March 25, 2013 - Copper Fox Metals Inc. ("Copper Fox" or the "Company") (TSX-V: CUU) is pleased to announce that it has entered into a facilities study agreement (the "Facilities Study Agreement") with the British Columbia Hydro and Power Authority ("BC Hydro") in connection with the proposed power supply to the Company's Schaft Creek project. The Facilities Study Agreement sets forth the terms and conditions for BC Hydro to perform a facilities study to assess the requirements to connect the Schaft Creek project to the forthcoming BC Hydro Bob Quinn substation and the associated system reinforcements.

              Pursuant to the Facilities Study Agreement, Copper Fox has requested transmission voltage service (69,000 kV and above) at the Schaft Creek project and BC Hydro will conduct a facilities study (the "Study") consisting of: (i) conducting preliminary engineering design to develop equipment specifications; (ii) developing a project plan that describes the Schaft Creek interconnection project and includes a schedule for implementation of detailed engineering, procurement, construction, testing and commissioning; (iii) developing a +/-30% cost estimate for implementation of the Schaft Creek interconnection project, and (iv) developing internal (BC Hydro) documentation for financial approvals to proceed with the Schaft Creek interconnection project. In order to conduct the Study, Copper Fox will pay a required deposit to BC Hydro. Copper Fox previously submitted a system impact study request to BC Hydro; an interconnection queue position was assigned to the Schaft Creek project and the system impact study was conducted. The queue position is used to prioritize study work and allocate interconnection costs. The Study is expected to be completed on or before May 31, 2014 and is estimated to cost in excess of $1 million to complete.

              Upon completion of the Study and following presentation, review and acceptance of the Study, Copper Fox expects to sign a facilities agreement whereby BC Hydro would then implement interconnection work, including detailed design and engineering, procurement for major equipment and construction and commissioning of the facilities. Upon entering a facilities agreement, Copper Fox would provide financial commitment to BC Hydro in the form of cash payment for the basic transmission extension and security for the system reinforcement portion. Part of the implementation for the interconnection work that BC Hydro would undergo includes installing revenue metering equipment. Prior to energization, BC Hydro and Copper Fox would execute an electricity supply agreement. The average timeline from execution of the facilities agreement to energization is six months to three years, depending on the complexity of the project and the resources available.

              About the Northwest Transmission Line

              The Northwest Transmission Line ("NTL") is an approximately 344-kilometre, 287 kV transmission line between Skeena Substation (near Terrace) and a new substation to be built near Bob Quinn Lake. The line and substation are scheduled for completion in the spring of 2014. The cost of the NTL is currently estimated at $561-617 million. The federal government has pledged $130 million and AltaGas (owner of Forrest Kerr IPP), is contributing $180 million. This leaves an unfunded portion of $251-307 million. There are several options to cover the unfunded portion. One option currently being considered is a capital contribution from the initial mines connecting to the NTL, on a pro-rata basis.

              http://copperfoxmetals.mwnewsroom.com/manual-releases/2013/03/Copper-Fox-Enters-Into-Facilities-Study-Agreement

              1. Replying to @Riskkee

                They haven't signed the facilities agreement yet, that we know about anyway. The timeline of 6 months to 3 years begins after they sign that agreement with BC Hydro.

                They should have completed the Facilities Study Agreement and presented it to Teck. We're now in the period of presentation, review and acceptance of the Study. You would think there would be a set period that the details from the Facilities Study Agreement remained valid in which Teck had to determine whether to move forward or not. I don't recall hearing anything about a timeline at this stage except for when Elmer told someone that BC Hydro would wait for us. It is kind of vague.

        3. Zero need to buy out CUU because of the port access. Same goes for the land.

          OK, Teck has 100% access to the port and land, but only 75% of the profit generated by working on the land and utilizing the port, which seems like a poor deal to me.

          Copper Fox owns 25% of the land claims and Liard shares owned by the JV, and is entitled to 25% of the profit until the NPI kicks in.

          The question was: I didn't think Teck needed to buyout Schaft Creek as they already have the port and the required lands. Am I missing something?

          The missing point appears to be the profit. They don't just want to control the land and port, they want to use them to make money. Why would they want to do 100% of the work, and financing, without gaining 100% of the profit?

          That's why they might want to buy the rest of Schaft Creek.

          1. "Zero need to buy out CUU because of the port access. Same goes for the land.

            OK, Teck has 100% access to the port and land, but only 75% of the profit generated by working on the land and utilizing the port, which seems like a poor deal to me.

            Copper Fox owns 25% of the land claims and Liard shares owned by the JV, and is entitled to 25% of the profit until the NPI kicks in.

            The question was: I didn't think Teck needed to buyout Schaft Creek as they already have the port and the required land s . Am I missing something?

            The missing point appears to be the profit. They don't just want to control the land and port, they want to use them to make money. Why would they want to do 100% of the work, and financing, without gaining 100% of the profit?

            That's why they might want to buy the rest of Schaft Creek."


            Because what you said before was trying to state owning 75% of the port as a reason for Teck to buyout CUU (see below), when it is not at all. Teck has control of the port, and CUU doesn't really "own" part of the port, its JV controlled and Teck controls the JV. Teck could drop the port access tomorrow if they choose.

            "With due respect, can you tell me why you feel Teck needs to buy out Schaft Creek? I didn't think Teck needed to buyout Schaft Creek as they already have the port and the required land s .

            They have 75% of the port and lands and, in Copper Fox, they have a partner who is not required to arrange any further funding. The next $57.5 million they spend is on their dime entirely, and they owe Copper Fox a further $40 million by the time the mine is built.

            I think Teck likes to have a partner in most of their projects to share the costs and mitigate their finances so that they aren't on the hook for 100% of the funding while owning 75% of the project"

            1. Replying to @Linsickel

              I'm not sure what point you are making.

              My point is essentially that Teck has reasons for buying out the 25% owned by Copper Fox even though Teck has control of the port and lands.

            2. Replying to @Linsickel

              You wrote: I think Teck likes to have a partner in most of their projects to share the costs and mitigate their finances so that they aren't on the hook for 100% of the funding while owning 75% of the project"

              That is exactly WHY Teck would want to buy out Copper Fox. The Fox isn't such a company that will help Teck with the finances and mitigate the risk. In fact with having us as a partner, Teck would increase their risk because they not only need to come up with financing for their 75% but our 25%.

              Some will complain about the new agreement because the old one was better - but I think in the long term, the new one is much better for us.

              1. Replying to @notsoquick

                Teck is very concerned about their debt-to-equity ratio and I wondered if this would affect it negatively. Technically they are arranging financing on our behalf but they have to do that because nobody would lend us the money.

                I wondered if they had to make a committment to repay the loan 100% it would affect their debt-to-equity ratio. It makes sense that it would have some affect.

                I was also reading about the effect of having too much cash on the books which can be surprisingly negative. Apparently one measure of a company is the return on assets. With cash in the bank, that isn't making such a good return, it lowers their overall return on assets.

                It would be nice if something pressures Teck to move forward sooner rather than later.

        1. exactly.

          I think Teck likes to have a partner in most of their projects to share the costs and mitigate their finances so that they aren't on the hook for 100% of the funding while owning 75% of the project.

          THIS is why I think it's best for Teck to buy Copper Fox.

    2. In my opinion the Port thing is very over rated. The dock they have a deal with is very small and just across the bay from it Arctic Construction is building a huge deep sea dock. It is called Stewart World Port and they will be looking for customers so I really don't think shipping is any kind of an issue.

      http://stewartworldport.com/

  2. Question for the board. At what point does Copper Fox management need to publically address the decimated share price. The regulators will often force companies to issue NRs to expain any unusal movements in their stock. Wouldn't you think that a 95% drop, albeit steady declinces over a few years, would also require some public management assurances that nothing materially negative is going on.

    Good question Golf! here's my take on it, I'm not sure that Copper Fox management needs to do anything unless they want to, yes the regulators will step in (useually the Exchange) only if there's unusual price movement or extreme volume with no news, yes we have a 95% drop in share price but I think we can all agree that this price drop has been a new adventure in Pain time wise, this would not send up any red flags to the exchange, on another note, the Venture capital market sentiment is the worst I've seen in my 25 years of knocking around this market, it reminds of the early nineties just before Bre-X and various other salt mines of that era, we can point the finger all we want at management but Market Sentiment is key, the retail sector will never be able to move our hundred and twenty million share float to a sustainable level, so we need Market sentiment to change or a major announcement, either one could turn share price, I'll guess a major announcement would halt trading....one can only hope!

    1. Agree completely Teck is the future driver for CUU shareprice in hte short and medium term.

      Other projects are down the road and will add long term value (although on share price Copper Fox has made almost a double on the Carmax Investment). Other projects will require cash to develope and cash in hand right now is worth more then you can get for developing minerals. It is cheaper to buy pounds in the ground then develope them. Stupid but true. It won't be this way forever. This phantom surplus in copper is going to evaporate and new production is non existant but that a couple years down the road.

      Copper Fox is stuck with Teck as a partner. Normally this is a great situation as Teck really is a choice partner. Unfortunately thier forray into Coal is not working out all that well right now. As a corporation, strategically Teck (like all majors) is in consolidation mode to conserve cash. Basically a corporate care and maintenace program waiting to see what happens in the world. The development money they have has gone to Fort Hills (Which shows that senior managment still is leaning toward energy over metals for future cash flows). So long as they are spending large sums at Fort Hills I would say it is less likely Schaft Creek will be moved ahead significantly. The deposit isn't going anywhere and Teck can start moving the project forward when it suits Teck. That could be next year or in 5 years. Long and short of it is that Teck will be moving the project forward at some point but that sure doesn't help CUU shareholders today.

      I sold off most of my CUU this spring becasue I didn't believe there was any news to drive the stock upwards (The Carmax deal has been an excellent development but didn't give CUU any love). I gambled that I would be able to pick it up later a lower prices and so far that gamble looks to be working out. With a spin the wheels program going on at Schaft, a getting to know you program at Van Dyke there just was going to be nothing exciting this year.

      Now that this year is over however I believe there are positives coming for CUU. A new work program will be made for Schaft Creek in about 6 months which could materially move the project forward, the getting to know you phase of Van Dyke is done and a plan to create a mine plan and economic assessment can begin, and an updated resource is in the works for Eaglehead allowing for the economic assessments to begin.

      Finally we are one year closer to the turning of the copper markets back towards recognized deficits.

      I am back on the accumulation trail now. I will be looking to end up with more shares than I held at the end of 2013 by mid 2015.

      1. Do you really think Teck will be spending wads of money on Fort Hills if the price of oil keeps spiralling downwards? The oil sands development projects come to a halt with a thud if oil goes below $85. Then TcK will have to adjust their development plans and budgetary focus no doubt.
        1. Do some Googling and you will see how anxious Mr Lindsay is about getting the delayed Fort Hills oil sands mine up and running. He mentions Teck is looking forward five to ten years, and see energy being the biggest producer for them, and they are diversifying accordingly.

        2. Well, well...STATOIL just announced a 3 year moratorium on Oilsands project development...Teck will take notice to be sure.
          1. Teck is in the passenger seat at Fort Hills, Suncor holds the majority and is the operator. Total Joslyn is on hold, all eggs in the Fort Hills basket. Suncor would gladly pick up Teck's piece if they don't want to spend.

            Suncor is being smart this time, go ahead while others sit on the sidelines and don't pay stupid labour costs. I do work for them and never seen them be so fiscally aware before. They won't let the costs get out of control this time.

      2. A new work program will be made for Schaft Creek in about 6 months which could materially move the project forward, the getting to know you phase of Van Dyke is done and a plan to create a mine plan and economic assessment can begin, and an updated resource is in the works for Eaglehead allowing for the economic assessments to begin.

        What kind of work program were you thinking?

        1. As for Fort Hills, you would have thought Teck would have figured out the grass isn't always greener on the other side of the fence from their coal play. You can bet there are lots within Teck wondering what they are doing messing around with energy when they are good at minerals. Still, diversification isn't a bad thing and I don't know the returns from investment on Fort Hills.

          As for the work program, I would expect that after reviewing the core and the mine plan for a year they would spend the winter doing trade-offs based on thier in-house knowledge to create a more profitable mining scenario. Copper Fox made an economic plan and Teck now has the chance to make a more profitable plan. This would lead into some geo-technical drilling and possibly some confirmation drilling next year as the mine plan is tweeked. I expect Teck did some district level exploration and this could lead to a minor drill program to confirm the future direction (way in the future) in which the project will be developed.

          I would say however the most valuable thing Teck could do for the project would be to begin construction of a road to the property. It isn't that far and the design is complete. It is a big cost up front but would save 10s of millions of dollars having road access. It is quite a leap though for a large mining company to look past 1 year of budget to realize who much money they are bleeding over 5.

          The road isn't cheap as there is a major bridge at the start on the Galore Road and I expect given the terrain in the area there would be a lot of rock cut. Guessing it would cost $250,000 to $300,000 per kilometer.

          No matter what I don't see an official production decision by Teck in 2015 but I can see them working towards that decision. I can see a production decision in 2016.

          Of course this is all conjecture on my part. It is based on my instincts more then any real information (which is in short supply right now).

  3. Question for the board. At what point does Copper Fox management need to publically address the decimated share price. The regulators will often force companies to issue NRs to expain any unusal movements in their stock. Wouldn't you think that a 95% drop, albeit steady declinces over a few years, would also require some public management assurances that nothing materially negative is going on.


    Here is the essence of the response I'd expect to see:

    Copper Fox management acknowledges a steady decline in the CUU shareprice but assures shareholders there has been no material developments to warrant the downward trend. Management remains confident that the value of CUU shares will rebound 'soon.'"


  4. Good posts venturevestor and golfyeti. I agree with both of your thoughts.

    The other thing that I'm expecting is that Teck will not build this mine alone. Yes, I expect that Copper Fox will be bought out becuase we don't help in derisking the project for Teck. So I'm expecting CUU to be bought out AND at the same time they will announce a JV wiht a "major" partner to buy in anywhere from 25% to 45% of the project. This partner will then be responsible for paying the majority of the capex costs to be involved.

    In this scenario, the optimization studies are critical for Teck to be able to attract another major in a JV deal.

  5. maybe this would be a perfect time to have our CUU shares 'bought out' in lieu of Tck shares.

    Bids Time of OrderBroker NameSizePrice
    10:11:34 Questrade Inc. 22,500 0.1850
    12:00:00 Merrill Lynch Canada Inc. 2,000 0.1850
    03:29:03 TD Securities Inc. 1,000 0.1800
    03:29:03 TD Securities Inc. 22,000 0.1800
    09:30:15 Merrill Lynch Canada Inc. 2,000 0.1800
    10:43:12 BMO Nesbitt Burns Inc. 2,500 0.1800
    03:29:03 TD Securities Inc. 7,000 0.1750
    03:29:03 TD Securities Inc. 10,000 0.1750
    03:29:03 Dundee Securities Corp. 10,000 0.1750
    03:29:03 Scotia Capital Inc. 15,000 0.1750
    07:16:37 TD Securities Inc. 22,000 0.1750
    07:47:16 Credential Securities Inc. 5,000 0.1750
    09:30:07 Scotia Capital Inc. 32,000 0.1700
    03:29:03 TD Securities Inc. 10,000 0.1600
    03:29:03 Fidelity Clearing Canada ULC 2,000 0.1600
    03:29:03 Scotia Capital Inc. 20,000 0.1500
    Asks PriceSizeBroker NameTime of Order
    0.1900 5,000 TD Securities Inc. 10:48:19
    0.1950 7,000 TD Securities Inc. 03:29:06
    0.1950 9,000 TD Securities Inc. 10:47:43
    0.1950 17,500 National Bank Financial Inc. 03:29:06
    0.1950 2,000 Merrill Lynch Canada Inc. 09:42:32
    0.2000 2,000 TD Securities Inc. 03:29:06
    0.2000 20,000 TD Securities Inc. 03:29:06
    0.2000 2,000 Merrill Lynch Canada Inc. 09:30:15
    0.2100 40,000 BMO Nesbitt Burns Inc. 03:29:06
    0.2100 20,000 BMO Nesbitt Burns Inc. 03:29:06
    0.2100 20,000 CIBC World Markets Inc. 03:29:06
    0.2100 15,000 Scotia Capital Inc. 03:29:06
    0.2100 7,000 Credential Securities Inc. 03:29:06
    0.2150 25,000 RBC Capital Markets 03:29:06
    0.2150 15,000 CIBC World Markets Inc. 03:29:06
    0.2200 30,000 TD Securities Inc. 03:29:06
    0.2200 15,000 CIBC World Markets Inc. 03:29:06
    0.2200 11,000 Scotia Capital Inc. 03:29:06
    0.2200 1,500 Scotia Capital Inc. 09:30:07
  6. i dont know about that... usually when someone says to me that everything is okay it usually isnt... i would rather have Elmer say nothing ...