Teck Reserves

I just wanted to get back to a comment made earlier by someone that Teck is not showing Schaft Creek on its table of Resources and Reserves for 2014.

If you look at their Annual Information Form they describe Schaft Creek as an exploration property rather than a project. Galore Creek is referred to as a project and has its reserves listed.

Most of the projects that Teck works with have their own employees listed as the QP on their 43-101. My opinion is that when Teck updates the 43-101 information in some way, with their own QP, they will then list the reserves on their website. That is, until they finish reviewing all the data through these optimization studies they won't count the reserves.

When they make the production decision it will cease to be an exploration property.

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. Someone was me, in this post: http://agoracom.com/ir/CopperFoxMetals/forums/discussion/topics/628511-optimization-studies/messages/1971149#message

    It will be a milestone event for CUU when Teck books reserves for SC. Did you know Teck booked reserves for Galore Creek on the basis of a PFS, which is a lower level analysis than a FS? Booking reserves followed by an announcement of filing the EA would be significant events we could expect in the near term. Teck is still waiting (2 years) for the QB1 permits to be approved before submitting the SEIA on QB2. They need to see that there are no significant environmental objections before committing capital to a project. I expect the same approach for developing SC.

    explorationguy

    Copper Fox Metals Inc.

    Optimization studies

    The optimization work includes "resource modeling" and a review of the " size and location" of a number of site facilities. Any significant changes to these areas would require an update to the feasibility study before filing an EA. An example can be found here where YMI carri...

    1. Did you know Teck booked reserves for Galore Creek on the basis of a PFS, which is a lower level analysis than a FS?

      I thought it was you, but I didn't take the time to go back through all the posts.

      I didn't know when Teck booked the reserves for GC, but I assume the PFS was done under their own QP, or at least their own authority? I'm guessing that they are taking their time with SC until they have confirmed the numbers themselves. They've obviously not moved it out of the exploration category anyway, and that must be connection to booking the reserves.

        1. There are only two things coming in the rest of the year, that I'm aware of, that might be interesting.

          One is the Van Dyke Resource Estimate which I think is proceeding from these last test results. Although it is tentatively due about mid-December nobody seems to want to put that in writing anymore.

          Second, I am hoping we get word on the JV 2015 work plan. My understanding is that Teck has been setting their overall budget for next year and once that is done we'll get to see what has been approved. This past year I was pleased there was no drilling because I thought that meant we left the exploration stage, but now they need more samples. I hope there is something in their plans that points towards early works projects rather than exploration.

          I don't quite see how the annual reserve report will get updated until they leave the exploration phase and at that point they have to make a formal announcement and pay us $20 million. It seems somehow tactical to delay that moment until they are ready.

          1. I don't quite see how the annual reserve report will get updated until they leave the exploration phase and at that point they have to make a formal announcement and pay us $20 million

            Is that your understanding of what constitutes a production decision? It's not defined in that manner in section 14.2 of the JV. Teck will cover up to $ 60 million of costs prior to a production decision, so it suggests some amount of work is expected beforehand. I'm not expecting a PD until the regulatory permits are in place, at which point Teck will review the project economics and copper/gold fundamentals, and then make a call on proceeding with the project or not. Do you have another source of information that raises the possibility of a PD sooner than my expectation?

            1. Replying to @explorationguy

              Scotiabank Mining Conference 2014 on Teck's investor homepage is a good listen if you have a chance. Nothing regarding SC but good info on Teck and how they look at things going forward. Not bad 2billion in cash and 3 billion in US$ line of credit, give it a listen.
              1. Replying to @Underhill69

                I had reviewed it over the weekend. Ron Millos mentioned Fort Hills is committed for funding until completion, then they expect QB2 and Quintette to follow although both projects have issues. He repeated the comment that Don Lindsay has said before about possible acquisitions and the disconnect with seller's price expectations.

                1. Replying to @explorationguy

                  I believe the disconnect with seller's price expectations in both men's answers was in regards to Iron Ore projects they we looking at the time to coincide with their coking coal operation. Cannot remember the company they were interested in and then backed down, I believe it was last year.
                2. Replying to @explorationguy

                  Re: He repeated the comment that Don Lindsay has said before about possible acquisitions and the disconnect with seller's price expectations.

                  And really Teck does not have to buy us out. There is no reason that they can't make a production decision without having to buy us out. If Teck feels that CUU is asking too much then they already have 75% so they can continue with the project under the JV terms. So it is not an all or nothing as it would be some other acquisitionss. Having said that, I do believe that Teck will want a partner to help share the cost and risks. So in the end, I don't believe that it will be Teck who actually will be buying us out.

                  Interesting discussion this morning regarding the resource estimates. It does show that this project is not as far along in Teck's project queue as I had thought. However, it is good in that they haven't "locked" in what they consider the resource value of the project is. I wonder how good the optimizations results would be for them to consider reshuffling their priorities?

  2. ...why is it taking Teck two years to ("not yet") complete an optimization?

    It hasn't been two years to complete the optimization studies, it only feels like two years.

    The optimization studies were announced on March 19, 2014. The work in 2013 of the JV was a drilling program to enhance the value. Drill results came back in December 2013. Strictly speaking then Teck has been working on the optimization studies for 9 months.

    I don't think insiders can purchase at this point because they would have material information if only because of the RE on Van Dyke, and the plans for SC next year.

  3. How does a couple of geotech holes in a half-hearted and half-abandoned "drilling program" supposed to enhance the value? Or for that matter not represent optimization work?

    This is probably a question that was best asked in 2013, but this is what they said at the time:

    The Schaft Creek Joint Venture intends to approve a Phase I, 2013 summer program aimed at increasing the value of the Schaft Creek project. The objective of the drill program is to test the extension to the east of the mineralization in the Paramount Zone and to collect additional geotechnical information for ongoing pit slope stability studies.

    Optimization work is a term that appears to be used specifically for the work this year:

    Teck Resources Limited ("Teck") as operator of the Schaft Creek Joint Venture has recommended a comprehensive series of studies to review all aspects (including metallurgical, pit slope design, geological modelling and environmental) of the Schaft Creek project. The objective is to review all data collected on the Schaft Creek project to the end of 2013 to update and optimize various parameters of the project.

  4. Great question Golf. And one that must be answered now that it appears the optimization work is taking longer than expected. I certainly don't want to be optimized into "oblivion", and had been counting on it as the final step in that graphic depiction of the liftime of a junior miner...just before the stock price jumped upwards dramatically.

    K

    1. Can't believe in Oct we where at I think .23/.24 and now wow in little over a month,I hope we get something that will gives a little bit of a lift but I doubt it the way you guys are talking,it seems we are in for a long painful winter. Just can't imagine going lower but have said that before. And no insider purchases down here does not instil confidence at all.As much as I hate to admit it the ones with alternative views got his one right up to now. Apologies to both Hoghead And Golfyeti.