Skip to content
Sign in

Post

Copper Fox Metals Inc.

You’re reading Long&Strong’s reply in this thread.Jump to it

Replies

  1. That's an interesting document that you dug up, but I'm unclear as to why those recommendations would make the stock go up. If anything, I would think it would do the opposite, as they now have to do more work for the environmental assessment. Is there something I'm missing?

    1. What does everyone think if Teck had almost had the permitting done, Then the tailings dam burst?

      Even tho I think it was terrible that it happened.

      It might have been good that it happened when it did. Teck just follows the rules of the province. Either way all miners must go by the regulations.

      Now that the province has been changing the reg's a bit. Teck can now easily change everything to conform to the reg's

      I think this will save money big time!!!!

      Instead of redoing it over.

      1. Teck can now easily change everything to conform to the reg's

        This is the letter I posted last week, but I don't believe it is a good thing or just a simple matter for Teck to change.

        The letter states that Teck has to re-do the AIR, or the Application Information Requirements. That is the document that the entire EA is based upon. It has been submitted already by Copper Fox but now will have to be re-done.

        As well, Teck will have to produce a complete report justifying why it is using wet tailings, if that is still the plan. They have to examine all the other options and show the costs and explain why their choice is best. This means a whole report that needs to be produced before they can re-do the AIR and before they can apply for the EA.

        Also, if you read the letter, the BC EA people are saying that it is going to take them another year to work through the results from the study of Mt. Polley and there might be further environmental amendments.

          1. So "everything" CUU did is now thrown off to the side?

            No, most of it is probably still good, but the parts that relate to the tailings have to be re-done. Plus they have to do a comprehensive report on all the tailings options, which they likely would not have done. For instance, stacked tailings that are dry (I can't remember the technical name) would not be used in a mine over 2,000 tpd, but they have to go through the process of doing the report anyway.

            The EA department has also reserved the right to add more conditions, so who knows what they might come up with over the course of the year.

            On the other hand, I've been of the opinion that Teck might scrap this application and submit a new one that would come under the new fast-track regulations so, in a way, it might not change things too much except for the extra report work.( That's just my opinion that they might try cancelling this application and starting again, it's not anything like fact.)

            1. Replying to @Prospekt

              I thought Teck was going to do a different Tailing pond anyway?

              I thought the whole point of seening the pit slope etc.... was going to change the tailings pond?

              Maybe the reason why the interest in plunking a few more holes at teh north end?

              Just might change everything?

              1. Replying to @Dogger 12

                I thought Teck was going to do a different Tailing pond anyway?

                I heard that Teck had optimized the tailings pond and already decided what to do with it. However, they are still required to produce a report showing all the possible options and cost them out, I guess, to prove that the option they chose was best.

                It's not so much the reality of what Teck is doing, but the work required to show the EA people, or really so that the BC government can show they are being thorough. They even acknowledge in the letter that they "...recognize that this will require proponents to undertake additional assessments and may be more work than you had expected for the EA."

                1. Replying to @Prospekt

                  I guess if the B.C. gov't has re-worded this.

                  I just might apply to everyone.

                  Those who are allready up and running. The B.C. gov't would have to show "everyone" thier proactive approach to enviroment safty.

                  Which is not a bad thing, Don't forget Mt Polly made international news, Im sure that the B.C. gov't got hell over that and now are making sure that ALL miners must conform, reguardless of the cost to make it right.

                  I would think that the miners that are up and running right now must be under the microscope with the B.C. gov't

                  1. Replying to @Dogger 12

                    I would think that the miners that are up and running right now must be under the microscope with the B.C. gov't

                    I think you are right. Everyone is going to go under the microscope now. We're just caught in this particular stage.

                    Alaska has been making a stink about this so I'm sure BC is putting on a show of being diligent. It's unfortunate for us because the problems at Mt. Polley don't exist at SC but we still have to go through the motions.

                    Anyway, it all comes down to money. If the optimizations show a project worth putting into production then it will happen. Don't forget that in South America they are moving whole villages to mine, and in that one case they planned on moving a glacier. We can surely manage some reports.

                    1. Replying to @Prospekt

                      I might be taking this out of context but the letter does say "I am requiring that proposed mining projects that have new proposed tailings dams provide the following information:"

                      So if it's under the old proposed tailing dams? does that do anything?

                2. Replying to @Prospekt

                  Christy Clark not doing so well in Provincial polls and May 2017 is coming fast. Teck must surly know that this Gov't would be their best case senecio to get SC EA passed. Unless the PC win but I doubt that very much. I don't think Teck and their partners want to take a chance of the NDP getting in.
        1. Our tailings won't effect the environment like it did with Polley. We have 3 options for tailing and revising the AIR won't take that long as we have moose mountain who did the work. They just have to amend the paperwork mostly. Teck is confirming this with the 2015 plan. What excites me more is that Teck is being proactive and pushing to get this done for 2015. Seems like urgency...

    1. Yes why would they send a letter to Teck if they don't think this will be a mine. Just the thought that Teck will be advancing SC is a positive for CF regardless of how much longer it might take. The wheels are set in motion and it looks like the market likes it :)
      1. I guess that makes sense, but I just figured Teck would receive all of the information that copper fox gets, as copper fox is really doing it on Teck's behalf. I see the logic now, but am skeptical that the letter is the impetus behind our stock going up. I don't have any better answers, just have a gut feeling that it's something much bigger that general shareholders aren't privy to.

      2. I'm assuming this letter went out to all the companies who have mine projects under review. Prospekt posted this letter last week. While this isn't negative, I don't think it reveals anything we didn't already know; that Teck has taken over Schaft operation and are the point of contact, and that they are at the Pre-Application stage of the Environmental Assessment. They are in this postion along with 5 other mines I seem to recall.

        This is the BC Environmental Assessment Office's way of implementing the changes recommended by their expert review panel following the Mount Polley incident. It looks like they will be adopting all of the recommendations of the panel into regulation. Changing regulations takes time. In the interim, those applications in the works get letters like this to inform them that the rules are changing and here is what you need to now do, prior to the new regs being formalized into law.

        Not trying to be a wet blanket, I work in this field and this is my read of the letter and process.

        K