  1. Elmer seems to indicate that they are targetting at least 82% of copper recovery, which would enhance the base case value around 25%.

    There's another graph about IRR, but not quite sure how to interpret that.

    MoneyK

    1. The base case is 68% so it's a 14% gain to get to the 82% target. The NPV improvement would be more than 50%, however the Van Dyke project is on "care and maintenance" with no activity planned this year until a surface rights issue is resolved. The IRR slide 5 appears to show the incentive price required to add incremental production to fill the 4.6Mt supply gap forecast for 2027(left side figure in slide 5) with a target IRR of 15%. Teck used the left side figure in their latest presentation but not an incentive, or trigger, price. They use the C1 cash cost curve and supply/demand curves. In this slide a price of 340 cents/lb would be required to provide the required incentive. The only use I see from the slide is that it confirms the 15% IRR I use as a rule of thumb for good project economics. The desktop studies need to show an improvement over the FS IRR numbers of 10.1 % pre-tax and 8.3 % post tax. I don't know what Teck would consider good enough but they described the Zafranal 15.9 % post tax IRR as robust economics.

      1. "The desktop studies need to show an improvement over the FS IRR numbers of 10.1 % pre-tax and 8.3 % post tax. I don't know what Teck would consider good enough but they described the Zafranal 15.9 % post tax IRR as robust economics."

        Thanks for taking the time to go through the release and your thoughts EG.

        What would be the way or ways to show an almost double percentage increase in IRR from 8.3% post tax to the required or robust 15%? Is it even possible? I might be old school or maybe just old but how do you take 80 or 90 million dollars worth of drilling expenses and work that finally transform into a BFS and then expect to almost double that BFS with a "desktop study"?

        1. There's a sensitivity graph for the NPV and IRR in the FS. The exchange rate alone can add up to 5% more IRR depending on what rate you select. Copper prices are now almost back to the base price of $3.25. Then it's CAPEX and OPEX which have the most impact on IRR. It appears Teck is looking at a smaller scale project size targeting the Liard zone. Capital costs will certainly be lower and the strip ratio will be much better since you don't have to remove the side/top of Mount LaCasse. There will be a penalty on the fixed costs like roads, power etc. which must be amortized on a smaller project. There's a possibility they could add 5 - 10 % IRR. Teck will use conservative numbers for exchange rate and copper prices so we'll see how it works out. We didn't get any numbers from the remodel so I doubt we'll get any numbers from the desktop studies. They will likely move on with a technical report if they like the numbers.