What numbers are you guys expecting?

1 point increase in the exchange rate increases the NPV by 75M

1 point increase in copper price increases the NPV by around 50M.

1 point increase in gold price increases the NPV by around 25M

The base case gives us a NPV of 513M with an exchange rate of 0.97, copper price of 3.25$US & gold price of 1445USD.

The long term exchange rate is set at 0.83, copper price at 3.00USD & gold price 1200 USD.

Therefore:

Exchange rate is up 15% compared to base case.

Copper price is down 8% compared to base case.

Gold price is down 17% points compared to base case.

513M + (15 x 75M) - (8 x 50M) - (17 x 20M) = increase of 385M

513M + 385M = 898M + 20% for starter pit not being wasted = approx. 1.1B

Without even considering other parameters (e.g. cost savings), I think the numbers should at least double.

MoneyK

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. "An already de-risked multi-decade deposit with a positive sandbagged feasibility with loads and loads of optimization potential, and one hardly scratching the surface of a rich and potentially multi-generational mining district in a stable jurisdiction should get NPV5%, at a minimum, not NPV8.  HUGE difference in the valuation.The overly conservative sandbagged 2012 Feasibility Study provided a Real Options Value of $2.5 Billion Net Present Value.  From my point of view that's just a pre-optimization, pre-mine-right-sizing starting point.  Fix those, as any honest operator would, and then you adjust for current currency exchange and long term commodity assumptions. Convert 171MT waste not waste, expand pit, reserves and mine size, ring out better recoveries, automation, rail it out, etc etc etc and my desktop studies show no reasons why NPVs couldn't be doubled"

    Golf! Strongly agree with this. He is absolutely right on this post.

    Elmer has took us publicly and privately this is the case on value. The ROV case (Real Options Value) is the most relevant valuation to determine worth of the project. Those of us who are expecting a higher buyout will not base it on a 500 million 8% discount base case metric. Confirm with Elmer. Those shareholders who want that 800 million buyout will base our value on a 5% discount rate using the ROV case as Elmer has suggested. Remember, SC warrants a higher value metric as this property is a production ready-post feasibility, First Nations approved project. Also keep in mind with the below we have several options to improve economics including reducing OPEX and CAPEX to increase profitability.

    From 2012 report

    Summary of Economic Results

    Base Case pre-tax Net Present Value ('NPV') for the Schaft Creek deposit using long-term metal prices and exchange rates and an 8% discount rate is CDN $513 million. Internal Rate of Return ('IRR') is 10.13% and a payback period of 6.5 years. In addition to the base case, three alternative cases were presented. Alternate Cases (1) and (2) are using three years trailing average and spot metal prices (as of October 15, 2012), respectively, and are presented for comparative purposes. Of particular significance is the third alternate case using the sophisticated economic science referred to as Real Option Valuation ('ROV'). NPV at an 8% discount rate for the alternative cases 1, 2 and 3 are CDN $967 million, CDN $1,024 million and CDN $1,382 million, respectively. Details about the economic analysis are on page 11 below.

     

    Item Unit Base Case 3-Y Avg* Case Spot Price** Case Real Options Case

     

    NPV (at 5%) CDN$ M 1,694 2,348 2,419 2,665
    NPV (at 8%) CDN$ M 513 967 1,024 1,382

     

    After Tax Economic Results
    Description Base Case ROV Case
    Net Cash Flow (CDN$ million) 4,270 5,133
    Discounted Cash Flow NPV (CDN$ million) at 5% 956 1,260
    Discounted Cash Flow NPV (CDN$ million) at 8% 67 529
    Payback (years from start of mill operations) 6.8 5.7
    IRR (%) 8.3 12.7

    Also interesting:

    The proposed process plant would be a conventional double-line grinding-flotation concentrator. The plant site has sufficient mill pad area to install a third processing line to increase daily throughput to 180,000 tpd should expansion of the mine be required to optimize the economics of the project.

    There is potential to extend the mine life with additional infill drilling to upgrade the approximately 171.16 million tonnes of current inferred resource located within the proposed open pit. Additional exploration of the Schaft Creek deposit to the east and the north of the Paramount zone and north of the Liard zone as well as the recently discovered Discovery zone could extend the mine life of the Schaft Creek project.

    1. YM,  you are spot on.

      I pray I live as long as my mother did, and if so I have another (gulp) 20 yrs. We need this to come to fruition before the markets and economies take a crap !!!! Before the NWO comes out with a global currency. Its already started as China is backing the yuan with gold and paying foreign imports of oil with yuan instead of $dollars. The US$ as the worlds reserve currency is under attack. The USMCA might be good for the North American continent, but doesnt address EU & Sino Asian import/export problems of imbalance.

  2. I agree, but we never know what stunt they will pull to gain some time.

    If they reduce the size of the initial phase, would that affect the NPV negatively?

    It would cost less in infrastructure, mine life and IRR would probably increase, but it would also defer revenues in the future, which is not a good thing for the NPV.