Skip to content
Sign in

Post

Copper Fox Metals Inc.

You’re reading youngmoney’s reply in this thread.Jump to it

Treasurer2.3 rating from 64 members9.5K ptsRate

Copper Fox vs. QB2

Trying to compare the selling price of QB2 based on ressources. 

Not sure if I'm doing it right but QB2 has:

14B (P&P) + 11.1B (M&I) + 17.5 (I)

30% sold for 1.2B / 42.6B = 0.028$/lbs

 

Copper Fox (all projets) has:

5.6B (P&P) +7.1 (M&I) + 4.3B (I)

Total: 17B x 0.028$/lbs = 476 Million

 

I think 476 million is pretty conservative at 0.028$/lbs... but still shows how underevaluated we are.

 

Please correct me if I'm wrong with my calculation.

MoneyK

 

 

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. My apologies, I didn't consider other metals for Schaft Creek.  See below the revised numbers.

     

    QB2 has (only considering Cu):

    14B (P&P) + 11.1B (M&I) + 17.5 (I)

    30% sold for 1.2B / 42.6B = 0.028$/lbs

     

    Copper Fox (all projets) has (using CuEq):

    10.2B (P&P) +12.9 (M&I) + 4.3B (I)

    Total: 27.4B x 0.028$/lbs = 767 Million

     

    Seems about right!

     

    Please correct me if I'm wrong with my calculation.

    MoneyK

    1. A couple of points:

      1) Teck reports reserves and resources differently from Copper Fox. Their resource numbers are reported separately and do not include the reserve numbers(see Teck Annual Information form page 55 https://www.teck.com/media/2017-Annual-Information-Form.pdf ). CUU includes both numbers so they have to be separated or they will be double counted (see slide 12 of the November presentation)

      2) It looks like you used the Schaft Creek total numbers, so you need to multiply by 0.25 to get CUU's portion and also avoid double counting the reserve and resource numbers. Also your Inferred number should be about 11.3 billion. As a check I did the following. Slide 12 has the CUeq values for Copper Fox's portion of Schaft Creek. The reserves are 2.568 billion lbs and the M&I resource number is 3.220 billion. Now you have to subtract the reserves from the M&I resource number because it's double counted, which is 3.220-2.568 = 0.652 billion incremental resource that was not included in the reserve number. Then add the Inferred ( 2.824) to get 6.044 billion lbs. Now apply your QB2 estimate of about $ 0.03/lb. 

      1. Still assuming we should we 100% of the reserve to compare with QB2, I now understand that (P&P) is also included in (M&I) for Copper Fox. 

        Therefore:

        QB2 has (only considering Cu):

        14B (P&P) + 11.1B (M&I) + 17.5 (I)

        30% sold for 1.2B / 42.6B = 0.028$/lbs

         

        Copper Fox (all projets) has (using CuEq):

        10.2B (P&P) + 2.7B (M&I) + 11.3B (I)

        Total: 24.2B x 0.028$/lbs = 678 Million x 1.3 (exchange rate) = 881.4 Million

         

        Does this make more sense?

        MoneyK

         

         

         

        1. Not quite sure about the Inferred numbers as most of it is coming from Van Dyke.

          My understanding of the Reserves and Resources Summary is we have about 1B in CuEq for (25%) of Schaft Creek, therefore 4B + 1.44B for Van Dyke.

          How do you calculate it?

          MoneyK

          1. The Van Dyke Inferred has to be removed so the 11.3 B I mentioned is wrong. From the tables on slides 12 and 13 I see a CUU Inferred of 2.824 B, less the Van Dyke amount of 1.442 B gives a SC amount of 1.382 B(25%). That becomes 5.528 B for the SC Inferred total. 

        2. Normally I reduce other deals to a straight $/lb and assumed you did as well for QB2. In order to avoid differences in % ownership( 30 vs 25) I would calculate a price per lb of 0.093 instead of 0.028 $/lb. Then I would apply to CUU's portion of the Schaft Creek numbers. That's the highest $/lb I've seen paid for a cu project. Note that it was paid to Teck and Teck has never paid that amount to a partner. That's why I want a third party involved with Teck acting as a partner willing to proceed with a project. In the end it will come down to what Elmer can negotiate. This is the best opportunity to close a deal in 6 years. First we need Teck to reveal a development plan along with the revised economics.

          1. Agree that teck never paid that, but if they want to sell 50% of the project, they will need to make our 25% look good to justify selling their 25%.

            MoneyK

          2. If we apply that logic, we have:

            Schaft Creek 100% = 23B CuEq (P&P + M&I) + approx 4B (I)

            Our 25% = 6.75B x 0.093$ = 628 Million x 1.3 = 816 Million

            That's for Schaft Creek only.  Sounds about right?

             

            Van Dyke would add 1.44B x 0.093$ = 134 Million x 1.3 = 175 Million

             

            MoneyK

             

            1. Replying to @moneyk

              Got to say, love the great discussion! The board was been dead for months. I assume more posts here as the meetings get closer with speculation.

              Anyways, you guys are calculating numbers based off old information for starters. Also you guys are not giving value to the agreement itself-

              A turn-key mine with a producer paying for the all costs (carried to production deal) but most likely Teck will want a new agreement in place with a well funded major.

              Also value from our district property and exploration of mineralized zones with no resource estimate yet. This has value too.

              So with new numbers, and scratching the surface of the metal tonnage. 500 million lowest price?

              1. Replying to @youngmoney

                Honnestly, if I would be Teck, I would probably pay a decent price for Schaft Creek.

                Afterwards, I would Swiss Cheese all the other zones at Schaft Creek that I got for free and sell them as extended phase 2 and phase 3 projects (same as QB).

                That would easily pay off for the initial purchase if the other zones are equivalent to the current zone.

                MoneyK

                 

                 

                1. Replying to @moneyk

                  Interesting idea!

                  SC deposit is huge! Our current resource counting metal tonnage only scratches the surface. This property is a golden egg that will be producing for 100 years. As Elmer once said, SC is still open to the south, north, east and west and at depth.....we dont know how far down it goes and how big this beast is.

                  I just saw we have a German presentation on our website now. Interesting. Thats new. Could be nothing or maybe an interested German buyer?

            2. Replying to @moneyk

              From your last set of numbers you had  "10.2B (P&P) + 2.7B (M&I) + 11.3B (I) " , which now would change to 10.2B (P&P) + 2.7B (M&I) + 5.5B (I)   = 18.4B. So 18.4 * .093 * .25 * 1.3 = 556 milllion CDN. Then there's another 50 million that resides in the JV agreement which is additive to the metal valuation. Then there's the challenge to convince a buyer to use the same value calculation when there are other acquisitions to choose from. We'll see what Elmer can do, or not. The market is not convinced we're close to making a deal. I've bought all the shares I want and have a low enough average to survive even a fire sale. 

              1. Replying to @explorationguy

                EG,

                There is a lack of good quality projects on the market. Very few that juniors hold at least. When looking for Tier 1 assets with post-feasibility and detailed engineering projects...there are few to none.

                SC will be a hot commodity.

                4 (by-credit) metals in a safe jurisdiction with amazing First Nations support with infrastructure and funding JV partner in Teck. Easy Sell.