Copper Fox Metals Inc.

You’re reading calvin123456789’s reply in this thread.Jump to it

Treasurer2.3 rating from 64 members9.5K ptsRate

What if...

Roughly, the SCJV was able to bring the project to these levels...

Capital cost: 2.5B (1.75B for 70%)

plus buyout for our 25%: 0.8M

minus sale for 30% to a partner: 1.2M

minus credit for tax incentive: 0.5M

This would cost Teck 850M to own 70% of the project.

When optimizing the revenus, I think they could recuperate their money in 2 years... maybe less..., giving the project a IRR close to 40%.

MoneyK

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. and all this only takes into account 50% of the ressources...

    If they can build QB2 for 2.5B, I suppose they can do the same here if not better.

    MoneyK

    1. Took another approach to calculate the value of Schaft Creek only.

      If our 25% generates 300M of Net Cash Flow per year and assuming people are willing to invest in a project that will give them a 15% IRR (double your money in 5 years)

      - 300M x 5 years = 1.5B / 2 = 750M

      - 750M / 475M shares = 1.58$ per share

      MoneyK

      1. For the Net Cash Flow, when looking at the 2013 FS, our 25% would generate 104M per year with an exchange rate of 0.97.

        When using 0.80, this roughly doubles all the numbers, therefore would bring to us 208M.

        Finally, I'm assuming that the recent improvements would offset current lower metal prices and still increases the cash flow (estimating 300M per year), because at the end, if the net cash flow is not better, we would not have said that we found better ways to do the economics right?

        MoneyK

        1. To compare, QB2 2016 FS estimates Free Cash Flow to be 610M.

          Sumitomo paid 1.2B for 30% of that (203M) and rights to QB3.

          In my opinion, both projets are very comparable.

          MoneyK

          1. QB2 capital cost was 4.7B.  They seem to be financing 2.5B and received 1.5B from Sumitomo, leaving them exposure for 700M.

            For Schaft Creek, capital cost was 3.2M in 2013 (now lower).  Financing 50% would bring the number down to 1.6B.  Finally, if they receive 1.5B from Sumitomo once again, this would leave them with exposure for 100M.

            For QB2 calculation, they are not considering how much they paid to acquire 90% of the project before selling a portion of it to Sumitomo.

            In my opinion, they could report crazy IRR's to shareholders if they don't need to consider how much they will pay for us.

            MoneyK

        2. Wait, how does 80 cents exchange rate double the cashflow?

          Also QB2 first 5 years cash flow is close to $1 billion with the optimization by Teck.

          1. I have a 2015 corporate presentation that has a nice table about forex sensitivity.

            That's 1B for 100% of the project right?

            I'm expecting Schaft Creek to be around 300M for our 25% only.

            MoneyK

            1. Replying to @moneyk

              Yes that table shows from a .97 to .85 forex is a plus ~50% net cash flow.

               

              still nowhere near a double. 

               

              Yes QB2 is 1 billion net cash flow for the first 5 years.

               

               

              1. Replying to @calvin123456789

                at 0.97, the net cash flow is 6.1B

                at 0.80, the net cash flow is 11.02B

                I'm not gonna argue too long for 10%...  just trying to put things into perspective and estimate our value by using a simple approach.

                MoneyK

  2. Some of your numbers are represented as "M" (millions), probably should be "B" billion.  Schaft Creek buyout number is way too low, regardless.   If that was acceptable to Ernesto, we wouldn't still be talking about it.

     

    Did you see the latest CUU press release?

    Copper Fox Announces 2019 Second Quarter Operating and Financial Results

    Q2 2019 Highlights

    • The 2018-2019 sizing and infrastructure alternatives study to reduce project capital and operating costs was completed, and the Schaft Creek Joint Venture ("SCJV") selected the 133ktpa case scenario for further study in the remainder of 2019.
    • The 2019 study will confirm the technical-engineering and economics of the identified engineering improvement options and the associated 133ktpa mine plan design.
    • A review of permitting and environmental requirements for the newly identified engineering improvements, together with continued engagement with the Tahltan Nation, will commence in Q3 2019.
    • In addition to the planned fieldwork to reinforce the project infrastructure's flood protection, a review of the site characteristics for the identified engineering improvement options (e.g., tailings storage, conveyance systems, ore and waste rock transport options, and mill location) will be completed in 2019.
    1. I'm aware of all this, but the fact is that they will sell when the offer reflects fair market value.

      Fair market value in the industry is usually 60% to 100% of the NPV (8%).

      If you want 3$ per share, that means our NPV needs to increase from 500M to 5.7B and Teck pays 100% of that value.

      If they are willing to pay 60%, that means NPV going from 500M to 9.5B...

      MoneyK

       

  3. Yes, should be "B"... and getting back your initial investment in 2 years is not 40% IRR.  Double your money in 2 years is 40% IRR.

    With optimization, I think it they could double their money in 2-3 years, which means an IRR anywhere between 25% and 40%.

    What are you trying to point out with the extract of the new release?

    MoneyK