Capstone purchased 30% of Santo Domingo for 120M US.
How much is that for pound in the ground? I'm at about 0.15$ US.
MoneyK
Join the conversation about Copper Fox Metals Inc.
ReplyYou’re reading chuckalau2’s reply in this thread.Jump to it
EG,
Capstone purchased 30% of Santo Domingo for 120M US.
How much is that for pound in the ground? I'm at about 0.15$ US.
MoneyK
Join the conversation about Copper Fox Metals Inc.
ReplyThe 2020 Capstone PEA lists a total M&I resource of 537 Mt with an average cueq grade of 0.52 %. They included cu, au and fe in the cueq. The Inferred number is quite small so I left t out. I get the following:
537,000,000 * 0.0052 * 2204= 6,154,449,600 lbs cueq.
6,154,449,600 *0.30 = 1,846,334,880 (30% of total was purchased)
$ 120,000,000/ 1,846,334,880 = $ 0.065/lb cueq or about 6.5 cents US a pound. What numbers did you use? I've shown my calcs in case I made a mistake. They list their NPV(8%) at $ 1 billion USD.
Capstone paid 36% of PEA. If we extrapolate to VD , we would get just over $230 million for VD or just over $.40 a share basis. Obviously other factors will change 36% to hopefully 100%, location, capex , permitting, resource potential etc etc
Thanks EG
Can you do that same calculation with SC and VD? Maybe a reality check for us. What would we get if we used Santo Domingo $/lb. and extrapolate to SC and VD. I know other factors may change results dramatically but I am curious. Thx
For VD I would use the 1.1 billion lbs cu recoverable in the PEA since I doubt a buyer would pay for more.
That gives 1,100,000,000 * 0.065= $ 71,500,000 USD
USe a conversion of 1.25 for CDN because that's what Teck used in the latest AIF and actually is close to current spot:
$ 71,500,000 * 1.25 = $ 89,375,000 CDN
For SC we don't have the recoverable yet from the PEA so we could get a high end estimate from the 11.9 billion lbs cueq listed on the latest presentation:
11,900,000,000 * 0.065 * 0.25= 193,375,000 USD for 25% of SC
Converting we get 193,375,000 * 1.25 = 241,718,750 CDN
Then we add the value left in the JV agreement:
241,718,750 + 50,000,000 = 291,718,750
Adding VD and SC, divide by share count:
(89,375,000 + 241,718,750)/500,000,000 = 76 cents per share
It requires Elmer to sell both properties which I believe will likely be separate transactions. He also has to convince buyers to use 6.5 cents per lb. Personally I would calculate a high, mid and low estimate and plan my investment strategy accordingly. As you mentioned there are a number of variables to consider. The current share price is too high for me to consider re-entering yet due to the risk I perceive. A personal choice, doesn't mean I'm right.
Thanks EG
I appreciate your calculations. Crazy things happen, especially now that this super cycle is being pumped. We somehow got to +$2.70 many years ago. Let's see where it goes today
I put $ 50 million in there to go from $ 241 to $291 million for the JV agreement. Is there another $ 50 million I left out?
Replying to @explorationguy
The calculation is correct but you made a typo in the formula
Replying to @accountant007
Yes I see the typo now and the reason for your question.
I also hope they sell both assets for maximum buyout value....
My opinion and guess is closer to $3 for all!
Let's go Elmer!
Release the Kraken (SC report)
Price per pound is an Interesting way to value a deposit. Exploration guys calculations show the downside of the method.... It doesn't consider the costs to actually get the copper out of the ground.
$90 million for VD verses $291 million for SC doesn't meet the sniff test when comparing their PEAs. Great example of the problem with the method...but there are problems with any method because we are dealing with estimate of the future.
From exploration guys post....
For VD I would use the 1.1 billion lbs cu recoverable in the PEA since I doubt a buyer would pay for more.
That gives 1,100,000,000 * 0.065= $ 71,500,000 USD
USe a conversion of 1.25 for CDN because that's what Teck used in the latest AIF and actually is close to current spot:
$ 71,500,000 * 1.25 = $ 89,375,000 CDN
For SC we don't have the recoverable yet from the PEA so we could get a high end estimate from the 11.9 billion lbs cueq listed on the latest presentation:
11,900,000,000 * 0.065 * 0.25= 193,375,000 USD for 25% of SC
Converting we get 193,375,000 * 1.25 = 241,718,750 CDN
Then we add the value left in the JV agreement:
241,718,750 + 50,000,000 = 291,718,750
I agree that VD is undervalued using pound method. The capex and cost to get copper out is relatively inexpensive imho
Replying to @accountant007
Interesting read for valuation techniques.
MoneyK
Replying to @moneyk
It seems Elmer and directors taking the nav approach! So this EV price per pound thing is not an issue for us. We have an advanced asset with technical reports establishing value on the project.
The only question left is, what percentage of nav will we get in a deal?
50%?
65%?
75%?
100%?
of NAV.
Replying to @youngmoney
So is we apply NAV what are the range of Stock Prices for the Various Percentages.
This would prove some perspective on what is possible.
Replying to @nowara
549,000,000 shares fully diluted
VD PEA $647 million US - 100% $1.18
SC $?
Replying to @nowara
Good question! Simply put....using just 50% of nav (which is quite low to use)
VD npv Canadian was 1 billion
SC npv unknown currently
Lets assume around 4 billion Canadian (25% interest gives us 1 billion Canadian)
Also will the buyout be based on post tax metrics or pre tax metrics? Let's say post tax for safety net.
vd npv is 800 million CAD post tax
So minimum 400 million deal at 50% nav!
sc around 500 million deal at 50% nav!
both assets give you nearly 1 billion deal. This is only at 50% nav. Not factoring exploration potential and JV contract terms.
I figure copper fox looking closer to 75-100% of nav!!! There's your higher buyout valuation.
Replying to @youngmoney
I'd be very happy if SC is 4B post-tax, but see it more 4B pre-tax and maybe around 2.4B post-tax?
MoneyK
Replying to @moneyk
Re... see it more 4B pre-tax and maybe around 2.4B post-tax
What would the IRR be at those amounts?
Replying to @notsoquick
It seems crazy to me that there could be so much room in a valuation of Schaft and VD?? EG showing a method that would value CUU at 79 cents and then another valuation by YM showing conservative 50% npv (900k) as $1.63, some say 75% npv which would $2.45
The one method "conservative" is twice the value of the price per lb method....Which method is the industry norm? Surely there can't be this much variation of value in reality????
Replying to @spitfire191
I think the huge variation in estimations and biggest question mark we have is how much per pound is it going to cost to get the product out of the ground? That would be the deciding factor on how much I would want to pay.
Replying to @canadag
"I think the huge variation in estimations and biggest question mark we have is how much per pound is it going to cost to get the product out of the ground? That would be the deciding factor on how much I would want to pay."
There are different valuation approaches depending on the stage of the project. There's a reason why you spend $80 Million to achieve a Bankable Feasibility Study. It is so you don't have to use a severe disounting method like a "pennies per pound" approach. On an early stage and poorly defined project a pennies for pounds valuation approach naturally gives the buyer a really big cushion or margin because of so many unknowns in terms of size, grade, recoveries, capex, opex etc etc etc. Lots has to be spent to prove Feasibility/profitality and after all that it may not even be close to profitable so a seller can't ask for much.
However with a Bankable Feasibility Study there is so much more clarity and hence derisking done that you now naturally use a much more reliable and fair valuation method (NPV) that respects the derisking and feasibility proof at hand. Only 1 in 10,000 deposits becomes a mine. With a positive Bankable Feasibility Study your project is graduated to a completely different league.
Replying to @golfyeti
Capstone just bought 30% of Santo Domingo for $120 million US or 38% of PEA $1.03 million after tax. All permitting was completed but some issues with transporting product left.
This represents 38% of PEA. I do not know if the selling partner had to sell or if it was in duress.
With the super cycle being pumped and the locations of VD and SC, we can hope for 50%.
VD $800 million CAD and say SC $500 million CAD for our 25%, 50% would be $650 million total or $1.18 share equivalent. Round up to $1.25 -$1.35 for SCJV agreement bonus. IMHO
Now we all saw stock rise to over $2.70 many years ago but we don't have the momentum and excitement we did back then (not yet anyways). Let's keep it real imho
Replying to @accountant007
While 50% seems like the lowest management could go....I see them wanting closer to 75% or higher of nav.
We shall see!
SC report due any day now.
Replying to @youngmoney
ym, "SC report due any day now"
Is that why no activity today ???????????
Replying to @spitfire191
pounds in the ground valuation doesn't make sense to me. Like comparing selling price per sq foot of a condo. Unless you are looking at units in same building (and/or city) it is somewhat meaningless.
Replying to @accountant007
And as has been mentioned here before there are other factors than cost to get the metal out of the ground that should factor into the deal CUU can get for any of their properties. Here's a couple:
1. Indigenous folks on side
2. Environmental condition (a major factor for me getting into CUU in the first place)
3. Exploration potential
4. Permitting obstacles
K
There's no gold. Capstone streamed its gold to pay for the 30%. Your cueq is incorrect.
capstone bought this project for $700m back in 2011.
I believe the Santo Domingo PEA was valued at just over $1 billion after tax. 30% ownership would be over $300 million. They only paid $120 million. Good deal! That's why I have taken a 65,000 share position in Capstone.
I'm curious at this SD project capstone owns.
went through their sedar.
basically bought farwest for $790 million for 100% of the asset.
Sold 30% off for $190 million to korean company. all in 2011.
Did FS on it. Then held off until 2018, got permits and all shovel ready for production.
Korean company end up selling for less?
Korean company also had agreements to buy the copper and iron ore from SD. I am guessing this divestiture is more complicated than a simple $120 million for 30%. Or there are some hidden benefits to Korea.
Someone made me a president I didn't want to be. Capstone should be taken to another zone since this is CF. But VD is perfect for them since they are into leaching technology