Discount rate
Galore's 2011 FS used NPV 7%.
Teck, why cant SC also get 7%? I would think that with half the capex, its even less risk?
MoneyK
Join the conversation about Copper Fox Metals Inc.
ReplyYou’re reading kinte’s reply in this thread.Jump to it
Galore's 2011 FS used NPV 7%.
Teck, why cant SC also get 7%? I would think that with half the capex, its even less risk?
MoneyK
Join the conversation about Copper Fox Metals Inc.
ReplyToo hot to do anything so I thought I would list the reasons why Schaft Creek is undeniably less risky than Galore Creek and should get a way lower discount rate than Galore Creek. Feel free to add anything you think I have missed.
1) Stage of study -- this is the biggie in terms of derisking:
SC has an eight-year-optimize FS vs Galore with a PEA and a PFS supposedly started. Just based on this relative stage of study SC should have a dramaticaly lower discount rate.
2) Super-low cost per pound. There is no better down-side protection than having the lowest costs in the world to mine something. SC Margins and IRR are huge! Lots of room for metal prices to go down without fear of losses and/or a shutdown for economic reasons.
3) Lower capex - another biggie
4) Shorter build time - this is important de-risking too
5) Geography for an operation: Gentle and accessible SC valley vs extremely challenging Galore location with its extremely rugged high elevation.
6) Accessibility
Remember that Galore abandoned the required multi-kilometer under-mountain tunnel after trying for just a few weeks
7) Diversification of revenue streams
SC has a broader range of metals being mined, this equals diversification and hence more revenue stability which means less risk
8) Cost Net of Credits
Not just more diversified but more total metal credits at SC than Galore
9) Optionality
Polymetalic deposits in a mining district with varying deposit mixes also equates to optionality of mining different deposits based on existing metal prices. Too many people undervalue optionality, but it is a huge de-risker
10) Expansion potential
This is a separate form of optionality. Production can be ramped up. LOM extended. Ability to capitalize on higher metals markets is a huge de-risker. Not all deposits have this. SC is far more expandable than Galore
11) Execution risks
Teck with 75% of SC it has unilateral control of the project's future (they can't be blocked by a partner) vs Teck not in control only with 50% vs/Newmont 50% - this aspect of SC vs Galore represents less execution risk.
12) Environmental issues are greater at Galore too because its watershed affects more sensitive waters -- the rock at SC is lower acid rock than at Galore and we have "no fishies" in the immediate vacinity
13) Community support
The Tahltan nation by all accounts appears to support a mine build at Schaft Creek. Admittedly, I have no idea how they feel about Galore Creek
The only thing I can see that Galore has better than SC is higher copper and gold grades. But sanctioning a mine is about top-to-bottom economics vs many risks. Its not just about grades.
ALL JMHO
Great post! That's a pretty exhaustive list.
What about Teck's capacity to fund at least 60% of the project via debt? That should transfer a lot of risk to a 3rd party!
Imagine the NPV and IRR improvements if the SCJV would only include the interest of the loan as true capex cost... why include something that's not even coming out of your pocket?
IMO.
MoneyK
Also, just like with Schaft Creek, with a mine the size contemplated for Galore you would require the flying-in of hundreds of workers beyond what the local workforce can fill.
Schaft Creek has a runway plan that will accomodate a 737 iirc for its daily/weekly import of labor. Where would you land a 737 at the mountain peaks where Galore is?
All of the risks and limitations at Galore Creek makes me wonder if mining Galore is even logistically feasible without relying on Schaft Creek infrastructure. Not 100% sure on this but just throwing that out there for discussion. Maybe someone has studied the Galore PEA and knows how they will import the required labor.
Replying to @kinte
Yes that is correct. I should have said "...without relying on some SC infrastructure."
The different geology does require its own processing. Its just that they barely have any room for that operation near the deposit, so they have to build it somewhere. This is a pie in the sky idea but I imagined once that rock from Galore would be transported very inexpensively by rail downhill to the Schaft Creek property where a separate processing plant would be in place for that rock. Then both concentratres are railed out from there.
This would require a common ownership structure to the two projects. Newmont and Teck aren't exactly rushing to develop a PFS at Galore. I wonder if it is actually dependent on a resolution to Schaft Creek... Possibly connected to this idea was the discovery one day on the site of either MM or AMEC (I forget which) that list of their on-going studies. They didn't list Galore and Schaft Creek separately. They referred to the study as the Galore Greek/Schaft Creek study. I saw this reference with my own two eyes. It was one study.
Prospekt IIRC inquired with them and the combined-study reference and it was promptly taken down from their site. That was an interesting response to an innocent inquiry about nomenclature.