Solid strategy SC
Our First Nations group ready to mine SC!
;)
Buyout Price just jumped another 300 million Teck!
Join the conversation about Copper Fox Metals Inc.
ReplyYou’re reading ducks’s reply in this thread.Jump to it
Our First Nations group ready to mine SC!
;)
Buyout Price just jumped another 300 million Teck!
Join the conversation about Copper Fox Metals Inc.
Reply"I'm surprised they didn't implement this at Galore since its much more advanced,lol, "
Outstanding observation! This is a very "hand-tipping" announcement by Teck, imo.
Schaft Creek somehow suddenly "exists" with the very first public comment on Schaft Creek escaping Jonathan Price's lips.
Can anyone here try to find out from the TNDC how big of a solar panel installation is contemplated? It would be confirming that a sanction decision is coming if the installation size far exceeds the camp's current power needs.
We are a post feasibility project.
most data still current from those reports used in todays economic studies.
More Teck games. Ways to slow our progress.
MK, come on! Are you a Teck employee? You have been promoting numbers that favour a Teck win outcome....far less than reasonable in a sale value that Cuu investors expect!
Get on board!
Teck doesn't fool me. Schaft Creek is at the completed Bankable Feasibility stage with the 2013 43-101-compliant Feasibility Study.
Of the very little work that Teck as operator has done on the project since its 2013 option for 75%, none of this work has "unvalidated" the Feasibility Study, imo, and this very little work has only exposed much more positive economics and even more jaw-dropping unsurfaced value.
Besides, Teck doesn't even need a 3rd-party prepared Feasibility Study, or an update on one, to make a sanction decision. IIRC, QB2 did not get to the Feasibility Stage before being sanctioned.
"Can anyone here try to find out from the TNDC how big of a solar panel installation is contemplated? It would be confirming that a sanction decision is coming if the installation size far exceeds the camp's current power needs."
Here's a photo of the array at SC. Doesn't look huge but I'm no expert on such things.
K
From Teck CEO:
"Implementing solar and battery technology at the Schaft Creek Project will reduce both our greenhouse gas emissions and our reliance on diesel fuel. Through this partnership, Schaft Creek will work with a Tahltan company to implement this project while also building capacity with our community partners. Using battery storage with the solar panels means that we can obtain 24-hour power even in a remote location and learn more about the potential for this approach to reduce emissions at other sites,” said Jonathan Price, CEO, Teck.
From TNDC-
"We are excited to collaborate with Solvest to accelerate our goal to develop and adopt clean energy technologies within Tahltan Territory. This partnership will leverage the collective expertise and resources of both organizations to develop and implement renewable solar power solutions that will benefit the Tahltan Nation and advance our vision of sustainable development. This partnership not only aligns with our commitment to environmental stewardship but also presents significant economic opportunities. We look forward to working together to create a cleaner and more prosperous future,” said Paul Gruner, CEO, TNDC.
The article-
Under the partnership, TNDC and Solvest will work together to identify and develop renewable solar power solutions that reduce diesel consumption and carbon emissions, with the aim to achieve carbon neutrality in Tahltan Territory in the future.
TNDC will invest in and own redeployable long life solar power assets and lease them to mining companies under a short-term lease. This creates greater economic benefits for TNDC while removing the capital investment and lowering the cost of fuel and carbon emissions for mining companies – reducing risks for all parties.
The first power project installation is at the Schaft Creek copper-gold-molybdenum-silver project, which is managed through the SCJV by Teck who is the Operator of the SCJV. TNDC has entered into a 3-year leasing arrangement with Teck for the power equipment, where Teck has the option to buy-out the lease after 3-years, and where Solvest has co-invested with TNDC for 25% of the project.
The Schaft Creek project includes a remote seasonal 85-person camp currently powered by diesel generators. It is estimated this solar array and battery installation will achieve more than an 80% reduction in carbon emissions directly for camp power, resulting in a significant cost savings for the SCJV over the next 3 years and beyond. Additional benefits include a significant reduction in camp noise compared to generators, lower cost of power, the ability to extend the life of the system and/or redeploy the power system, and additional reductions in fuel consumption related to the delivery of fuel and materials to the site.
"In preparation for a mining decision" this is good but Teck is still not saying what we want to hear
The good thing is the TNDC are economically on side, maybe just subcontracting these services but this is the payment for non protested unceded land use. Teck knows how to do this. Wonder if Elmer gets to make a green press release too?
TNDC’s services have expanded to heavy construction, earthworks, camp services, air support, aviation, forestry, transportation, and fibre-optic communications services. To learn more, visit www.tndc.ca