"Results of the lock cycle testing is expected to better inform potential changes to the proposed milling flow sheet set out in the 2021 Schaft Creek PEA with potential implications to the mill design, capital expenditures and throughput."
Didn't Elmer drop previous insinuations that anticipated studies might positively impact, amoungst other things, "throughput". Is "throughput" not just code for "size of mining operations"?
With this NR Teck did allow Elmer to publicly state that potentially big changes are in fact being reviewed.
Corrections welcome if I am misinterpreting the term throughput.
He lost all credibility in my eyes a very long time ago. I cannot bring myself to even listen to him, just in case he says something like "We've created great shareholder value" or some other insane and/or intelligence-insulting statement.
133k tpd is projected at 92% availability. What could change is confirmation that the mine could operate at 95%+ availability,which would directly increase the daily throughput.