Absurdity

I was reading through Copper Fox's Corporate Presentation and I was struck by how much Teck money has put into Schaft Creek over the last number of years - into improving the project. 

Using the 2021 PEA AND updated metal pricing (Copper $4.25/lb; Gold $2,200/oz; Molybdenum $23/lb) and update Exchange Rate (US$ > Cnd$ @ $1.37) - the NPV 8% for 25% is $720.5m US or $987.0 Cdn.  For fun, take some multiplier (0.5X or 0.86X) of that number to get what might be monetize $493.5m Cdn; or $848m Cdn which is a $0.87/share or $1.49/share.  This is crazy when the share price closed at $0.22 on Friday.  


But it gets Absurd in my Opinion - when you consider that the $720.5m US value was done back in the 2021 and lot of work has been done or will be done since then.  How much will the following activities add to this value?  it has be significant when you look at the big picture.



Teck has budgeted (actual amounts when I have it) since our PEA was done in 2021.

Budget 2021 C$3.4M

Budget 2022 C$6.6M

Actual 2023 expenditures C$19.8M

Actual 2024 expenditures C$24.7M

Budget 2025 C$15.8M

This is a total of $70.3M 



These were Teck's Objectives in those years:

  • The 2021 program aimed to reduce capital costs, improve project valuation,
  • In 2022, Teck Resources and Copper Fox Metals focused on advancing the Schaft Creek project, a large-scale copper-gold-molybdenum-silver deposit. 
  • 2023 Objective – Advance the project with focus on key areas including safety, geoscience and engineering, environmental, communities, and permitting
  • 2024 Objective – Advance the key project parameters to transition the project from Scoping to PFS stage
  • 2025 Objective – transitioning the project to the prefeasibility study (PFS) stage



Drilling - In those years Teck has drilled (planned):

  • 2021 - 835 metres were completed and logged for lithological, mineralogical, alteration and geotechnical data.
  • 2022 - Eleven drillholes – - 4,688 meters ("m") with the objective of collecting samples to complement historical metallurgical test work.
    • Five drill holes intersected copper-gold-molybdenum-silver mineralization across a range of grades representative of the project life of mine for metallurgical test work
  • 2023 - Ten drillholes – 3,288 m drill program focused on geotechnical data collection
    • Five drillholes completed along the highwall portion of the Paramount zone intersected significant intervals of porphyry style copper-molybdenum-gold-silver mineralization
  • 2024 - Six drillholes – 2,472 m geotechnical drill program focused on key areas of the highwall
    • Three of the six holes intersected significant intervals of porphyry style mineralization and extended the Paramount zone approximately 250 m to the north
  • 2025 - ? m (didn't say how much) but did say
    • The field portion of the 2025 program is scheduled to start in June. The program anticipates utilizing a combination of diamond and sonic drilling as well as geophysical surveys to characterize the bedrock and overburden in the areas of the proposed TMF and RSF
  • To me the drilling is very important as the 2021 PEA only utilized approximately 60% of the mineral resource leaving opportunity for the remaining to be included in a Prefeasibility Study (PFS) by way of upgrading the Inferred resource to the Indicated resource category.


Meturigical results

And of course we have been waiting for the Meturigical results for such a long time.

I understood that we are looking for improvements in the Recoveries: (I see copper is already at 100% so perhaps I misunderstood)

Cu 100.0%,  (or 97.7%)

Mo 60.1%,

Au 71.0%,

Ag 40.3%,



Other improvements

There are other improvements but which I don't understand how it affects the economics such as the Pit Slope. 

Capital Costs (Initial US$2.65B) - but with inflation I would expect this number to go up.

It is quite possible that there are others that I am missing.  Your are welcome to educate me.



It is Absurd to think of a number with all of these improvements when the current valuaation is already an absurb increase over current share price.

I have been buying some more shares over the past month or so.


Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. NSQ,


    "LOM metal recoveries to copper concentrate containing 28% copper are expected to be 83.1% for copper, 71.0% for gold and 40.3% for silver. The molybdenum recovery to the molybdenum concentrate (containing >50% Molybdenum) is estimated to be 60.1%."


    The metallurgical tests will impact many things.


    1) the milling throughput 

    2) the recoveries


    The PEA assumes 133k tons per day at 92% availability.  Make that 95%-97% and you process a lot more pounds every day.


    A boost in recoveries and grades is almost "free" metals.


    Capex certainly would need a refresh.  Considering the mine could perhaps be built much faster now due to the infrastructure now in place in the area (e.g. highway, bridges) and also that contingency on a PFS should lower by 5% to 10%, I'm hoping this helps to mitigate inflation.


    Always good to see you post some numbers!


    MoneyK

    1. NSQ,


      Assuming we get anywhere close to $3B US in after-tax NPV valuation, $400M to $450 US would be my lowest valuation for our 25% of SC.


      This assumes using 0.50x NAV at PFS and a little premium for the milestone paiements and carried-interest.


      Alternatively, using an EBITDA ratio of 1x to 1.5x at most would be my assumption at PFS, based on other transactions.


      Looking how Teck is "moving fast" on their other projects (Galore, San Nicolas),  I think we are still at least 5 years away from a FS and production decision, where something closer to 75% to 85% NAV could be expected.  Therefore, I don't think Teck would pay anything close to 100% NAV today, specially with the risk remaining.


      I know some here will disagree, but that's where I stand these days.


      MoneyK

      1. My understanding from pit slope is that if they can go down with more angle, they can dig more ore over the life of the mine.  Therefore, more mine life and maybe a slight improvement on opex?  but can't say for sure.


        MoneyK

      2. Elmer seems to differ from your value which is a positive. SC is not a typical mining project. It's a national interest development in Canada with Teck funding 100% of the capex, saving a partner 1 billion dollars. The time this mine produces, copper $6-8, so today they can steal the asset using only $4.25 pricing to determine a value which is severely discounted already at 8%.

        $750 million our share today without the new data over 4 years is likely closer to $1.50 billion with enhancements. 

        SC is not a buyout play using a 50% npv approach when we have First Nation support, huge exploration potential, minerals not used in the study outside the pit, contract terms favouring a new partner, and government fast tracking.
        Factor all this plus Elmer saying at an agm that 100% of nav is preferred and doable I think you need to revalue our SP.

        1. SC is not more special than any other project out there.  We might get a small premium for the SCJV terms.  If you can find some recent transactions where 100% NAV was given to a junior for their minority interest at PEA or PFS stage, I might reconsider.


          For now, I'll use 50% NAV and hope that CF is able to negociate additional payments in the future if there's any upside when this goes into production (e.g. higher copper prices, more improvements, etc.)


          MoneyK

      3. Point 1 Re: Assuming we get anywhere close to $3B US in after-tax NPV valuation, $400M to $450 US would be my lowest valuation for our 25% of SC.  This assumes using 0.50x NAV at PFS and a little premium for the milestone payments and carried-interest.


        NSQ:  MoneyK, I am not sure that I am understanding your numbers correctly. 

        - We are already at $3B NPV – From the latest Corporate Presentation “In Summary” page - Calculating metal pricing increases together results in an after-tax NPV of $3.0B.

        - The main point of my post was that the $3.0B NPV amount will certainly be even better with all the work they have done over the past 5 years.   I have no speculation on what that amount might be – just that it is significant.

        However, your comment about the 0.50x NAV makes me wonder if you are stating that $6B US is possible - to give the $3B US value.

         

        Point 2 Re: Looking how Teck is "moving fast" on their other projects (Galore, San Nicolas),  I think we are still at least 5 years away from a FS and production decision, where something closer to 75% to 85% NAV could be expected.  Therefore, I don't think Teck would pay anything close to 100% NAV today, specially with the risk remaining.

         

        NSQ: I agree with your thoughts on timing – 5 years for a FS.  I think that we could be looking at 3 years for just the PFS report.  They are getting data together for the PFS in 2025.  Add in the 12-18 months that Elmer stated that it takes to do the PFS.  Add in Teck's slowness.  Then I can see that this will take until 2028 before we see a PFS report.  

        1. NSQ,


          Yes, we are already at around $2.8B US I believe.


          Not sure how much the improvements will bring, but if capex is now $3.6B US, $1B of improvements would only make it a wash unfortunately.


          We have metal prices and exchange rate working in our favor right now, but capex is the big unknown for me at this point.


          MoneyK

    2. Re:  "LOM metal recoveries to copper concentrate containing 28% copper are expected to be 83.1% for copper, 71.0% for gold and 40.3% for silver. The molybdenum recovery to the molybdenum concentrate (containing >50% Molybdenum) is estimated to be 60.1%."


      Thanks MoneyK for correcting the recovery %. that I had on my post  

      I had used the % on the Mineral Resource Growth page on Corporate Presentation.  I can see now that these are not the same thing.


      I like your other comments regarding mill availability at 92%.

      Below is restatement of my original post with the correction in the copper recoveries and MoneyK additional points - Just so that it is all in one place. 


      ---------repost of previous with updates --------------------------------------------

      I was reading through Copper Fox's Corporate Presentation, and I was struck by how much Teck money has put into Schaft Creek over the last number of years - into improving the project. 

      Using the 2021 PEA AND updated metal pricing (Copper $4.25/lb; Gold $2,200/oz; Molybdenum $23/lb) and update Exchange Rate (US$ > Cnd$ @ $1.37) - the NPV 8% for 25% is $720.5m US or $987.0 Cdn.  For fun, take some multiplier (0.5X or 0.86X) of that number to get what might be monetize $493.5m Cdn; or $848m Cdn which is a $0.87/share or $1.49/share.  This is crazy when the share price closed at $0.22 on Friday.  


      But it gets Absurd in my Opinion - when you consider that the $720.5m US value was done back in the 2021 and lot of work has been done or will be done since then.  How much will the following activities add to this value?  it has be significant when you look at the big picture.



      Teck has budgeted (actual amounts when I have it) since our PEA was done in 2021.

      Budget 2021 C$3.4M

      Budget 2022 C$6.6M

      Actual 2023 expenditures C$19.8M

      Actual 2024 expenditures C$24.7M

      Budget 2025 C$15.8M

      This is a total of $70.3M 



      These were Teck's Objectives in those years:

      • 2021 program aimed to reduce capital costs, improve project valuation,
      • 2022, Teck Resources and Copper Fox Metals focused on advancing the Schaft Creek project, a large-scale copper-gold-molybdenum-silver deposit. 
      • 2023 Objective – Advance the project with focus on key areas including safety, geoscience and engineering, environmental, communities, and permitting
      • 2024 Objective – Advance the key project parameters to transition the project from Scoping to PFS stage
      • 2025 Objective – transitioning the project to the prefeasibility study (PFS) stage



      Drilling - In those years Teck has drilled (planned):

      • 2021 - 835 metres were completed and logged for lithological, mineralogical, alteration and geotechnical data.
      • 2022 - Eleven drillholes – - 4,688 meters ("m") with the objective of collecting samples to complement historical metallurgical test work.
        • Five drill holes intersected copper-gold-molybdenum-silver mineralization across a range of grades representative of the project life of mine for metallurgical test work
      • 2023 - Ten drillholes – 3,288 m drill program focused on geotechnical data collection
        • Five drillholes completed along the highwall portion of the Paramount zone intersected significant intervals of porphyry style copper-molybdenum-gold-silver mineralization
      • 2024 - Six drillholes – 2,472 m geotechnical drill program focused on key areas of the highwall
        • Three of the six holes intersected significant intervals of porphyry style mineralization and extended the Paramount zone approximately 250 m to the north
      • 2025 - ? m (didn't say how much) but did say
        • The field portion of the 2025 program is scheduled to start in June. The program anticipates utilizing a combination of diamond and sonic drilling as well as geophysical surveys to characterize the bedrock and overburden in the areas of the proposed TMF and RSF
      • To me the drilling is very important as the "2021 PEA only utilized approximately 60% of the mineral resource leaving opportunity for the remaining to be included in a Prefeasibility Study (PFS) by way of upgrading the Inferred resource to the Indicated resource category."


      Meturigical results

      And of course we have been waiting for the Meturigical results for such a long time.

      We are looking for improvements in the Recoveries from these values:


      Cu 83.1%, 

      Mo 60.1%,

      Au 71.0%,

      Ag 40.3%,



      Other improvements - Considerations

      Pit Slope - Not sure how it affects the economics: 
      My understanding from pit slope is that if they can go down with more angle, they can dig more ore over the life of the mine.
      Therefore, more mine life and maybe a slight improvement on opex?  but can't say for sure.

      Capital Costs (Initial US$2.65B) - Capex certainly would need a refresh.  Considering the mine could perhaps be built much faster now due to the infrastructure now in place in the area (e.g. highway, bridges) and also that contingency on a PFS should lower by 5% to 10%, I'm hoping this helps to mitigate inflation.

      Production Capacity - The PEA assumes 133k tons per day at 92% availability.  Make that 95%-97% and you process a lot more pounds every day.

      Metallurgical tests will impact the recoveries, as well as the milling throughput.

       

      It is Absurd to think of a number with all of these improvements when the current $3B US valuation (100% SC with updated metal pricing) is already an absurd increase over current share price.  But we paying the price for taking years and years to monetize ANY asset.