Re: I just can't see SC jumping from 800 plus million to over 3 billion to match our 25% with that per share number. The $1.43 share number.
NSQ...We are actually already over that on a npv value basis.
From corporate presentation....
At Schaft Creek after-tax NPV is US$842M using US$3.25/lb Cu, US$1,500/oz Au, US$10/lb Mo
A $0.25/lb increase in Cu results in a $240M increase in after-tax NPV. At $4.25/lb Cu the implied after-tax NPV would increase to $1.8B ($842 + $960 = $1.8B) based on Cu alone
A $100/oz increase in Au results in a $80M increase in after-tax NPV. At $2,200/oz Au the implied after-tax NPV would increase to $1.4B ($842 + $560 = $1.4B) based on Au alone
A $1.00/lb increase in Mo results in a $40M increase in after-tax NPV. At $25.00/lb Mo the implied
after-tax NPV would increase to $1.4B ($842 + $600 = $1.4B) based on Mo alone
Calculating metal pricing increases together results in an after-tax NPV of $3.0B
The $3.0 billion above is in us$ which at 1.37 exchange rate is $4.1 B. cdn or over $1 b for our 25%.
In addition there are additional improvements that are hopefully can be done.
"LOM metal recoveries to copper concentrate containing 28% copper are expected to be 83.1% for copper, 71.0% for gold and 40.3% for silver. The molybdenum recovery to the molybdenum concentrate (containing 50% Molybdenum) is estimated to be 60.1%."
These can hopefully be improved after several years of studies.
The PEA assumes 133k tons per day at 92% availability. Make that 95%-97% and you process a lot more pounds every day.
The JV agreement with it's carried financing to production clause is very unique and has to be worth something.
- Copper Fox is not required to contribute any cash to the joint venture, as Teck funds all the work.
Long term Exploration potential... Shaft Creek, as I said, that's the responsibility of Teck, and it is already a multi-billion ton deposit. And we don't really know how big it is. That has to be worth something.
Short term exploration potential.... Elmer talked about a drill hole that was intersected in 2024. That was a 250-meter step out to the north, a very significant step out with a very significant higher grade, much higher grade than the life of mine average grade, and a very near surface. So that shows you the exploration potential to add more to the resource.
. We only used 60% of the resource that was identified in the mineral resource estimate. And so using 60%, the other 40% essentially is in the pit walls.
So clearly you can see the potential longevity of that project should it go into production. That has to be worth something.
On the other hand...
Buyouts are not usually at 100% of NPV so that will offset some of the potential improvements.
So I think we can easily achieve $1.43 for just SC alone but the burning question would be on how long we would have to wait for the JV to achieve that.