2012 Resource Estimate
Table-1: Mineral Resource Estimate - Schaft Creek Deposit
Robert Morrison - Ph.D., MAusIMM (CP), P.Geo., Effective Date: May 23rd, 2012
| | | | | | | | | | | |
| Resource | Cut-off | | Copper | Molybdenum | Gold | Silver | Contained Metal | |||
| Category | CuEq (%) | Tonnes | (%) | (%) | (g/t) | (g/t) | Cu (Lbs) | Mo (Lbs) | Au (ozs) | Ag ( ozs) |
| Measured | 0.15 | 146,615,300 | 0.31 | 0.017 | 0.24 | 1.78 | 1,001,824,600 | 55,624,000 | 1,149,100 | 8,402,700 |
| Indicated | 0.15 | 1,081,939,500 | 0.26 | 0.017 | 0.18 | 1.68 | 6,104,400,000 | 399,718,500 | 6,218,000 | 58,335,500 |
| Measured & Indicated | 0.15 | 1,228,554,800 | 0.26 | 0.017 | 0.19 | 1.69 | 7,106,224,600 | 455,342,500 | 7,368,000 | 66,738,200 |
| Inferred | 0.15 | 597,191,300 | 0.22 | 0.016 | 0.17 | 1.65 | 2,872,034,300 | 206,252,100 | 3,359,600 | 31,601,400 |
Essentially we've got in situ MI&I:
10 billion lbs of copper X $4.63 = $46,300,000,000 USD
10.7 million ozs of gold X $3,824 = $40,916,800,000 USD
661 million lbs of moly X $32.36 = $21,389,960,000 USD
98.3 million ozs of silver X $44.77 = $ 4,400,891,000 USD $113,007,651,000 USD
Note that with all other prices remaining the same, the price of gold is 13% away from making Schaft Creek a Gold mine with very substantial copper, moly and silver credits.
According to the old guard a gold mine locks in NPV5%. Heck, I would like to argue that a multi-generational gold mine that includes such lucrative and diverse by-products should get an even lower discounting.
Join the conversation about Copper Fox Metals Inc.
Reply
