  1. Had time for a first look this morning. Language on VD has totally changed, and is now consistent with the last NR.


    As golfyeti pointed out, the CUU stated objective at VD is now to "re-start copper production from
    historic Van Dyke deposit using responsible mining technologies, practices and utilizing ISCR methodology." Text on website also changed. 


    To me, this sounds like they are either turning into miners themselves at VD or are seeking partners to go all the way to a producing mine. The last NR said, "The results of the PEA could optimize the timeline, activities and estimated cost of the Execution Plan prepared to advance the project to the prefeasibility study (PFS) stage. We look forward to delivering on this next milestone and are exploring available options for non-dilutive funding prior to initiating the PFS level activities.”


    I can understand how taking a fresh snapshot at VD will update the economics, but I'm not clear on how that could optimize the timeline, activities and estimated cost of the Execution Plan. Unless there are synergies on that Execution Plan to be found with a neighbour like Taseko.....Thoughts?


    The non-dilutive funding path is tantalizing and sounds like a JV.


    K

    1. I sure feel like they are, and have been trying, to attract some attention.  We do have a few properties, just no funds to drill and explore.  any interest outside of teck could sure stir the pot but schaft creek is our main draw and some good news on that front is what will really move this dog.  The wind is at our back as far as copper goes.  tick tock.

    2. If CF's strategy changes and they now want to mine Van Dyke themselves (or in a joint venture), this would be a completely new strategy, proposition and a business model. At any other company, this kind of strategic change would be discussed and explained in detail with shareholders. The fact that the BOD didn't communicate this clearly implies, in my opinion, that this isn't their intention. If mining Van Dyke themselves is indeed their intention, the BOD is being incredibly negligent in their communication with shareholders. But hey, this is CF, so almost nothing surprises me anymore.

      1. No way current management sticks around until copper comes out of VD. That's at least 6-7 years away if things go well and money isn't a problem. I agree that CF will not be mining anything. In my humble opinion, the most logical path forward is to jv with a reliable partner, let them pay for the pea and  maybe pfs and then sell it to the jv partner. Frankly I think once the pea is done it gets sold along with, hopefully everything else. I also think the drill results will have an impact on a potential partner and it might be a case of shining up the asset sheet to get someone who wants at least 50% of Desert Fox; or CF wants to make that pitch and focus on EH over the next 2-3 years. Money from a DF venture and a SC sale would let them Swiss cheese EH and get a pea in a few years and sell it as well. 
        Yes some upside but things seem at least 6-12 months away unless in the interim there's activity with SC.

    3. Great post. I liked it!


      Only issue- TIMELINE.


      We know this team works at snail pace!

      Also, Elmer always states we aren't miners.


      I don't want to stay with Copper Fox anymore! They need to sell it all....OR, as stated, this new wording points to a sale if anything! The wording suggests VD will be a mine again and that's going to cost the buyer big money to us! Is the new wording a hint to Teck? Maybe! 
      Copper Fox might want Anglo Teck to buy our advanced assets, and we could spin- out our exploration portfolio into a new company. Best way.

      Updating the economics is important before announcing a sale.


      Higher npv = higher sale price

      1. I have no doubt they are just fishing for attention.  I can only think of one or two people on this chat board that would be excited to spend another five or ten years cheerleading this management.  And let's not forget that Elmer is 73 years of age now.  keeping up this dog and pony show can't be good for one's heart or conscience for that matter.

    4. Great post Kinte!  Taseko is putting the final touches on their Florence ISCR project with first copper production expected any day now.  They spent iirc about $330 M building the mine and completed it in just under 2 years, start to finish.  They project that they will produce 85 million pounds annually of high quality copper cathode.  The exact same production level is expected from the Van Dyke ISCR project.  

      So yeah Taseko is totally the best operator to joint venture with, hands down.  They have fresh experience with constructing this new type of mining opreation, and there are hundreds of mine construction workers that will be soon available to repeat their work on the next ISCR project, like Van Dyke.  I can't see why Taseko would not be very eager in developing a virtually identical and near-by ISCR mine like Van Dyke.  

      As for CF's pivot to a quick update to the PEA instead of an expensive and time-consuming PFS, it makes me suspect that they are getting serious interest who may not want to wait for, or even need,  a PFS to be completed by someone else. 

      Van Dyke looks pretty similar to Florence.  Does Taseko really need a detailed feasibility study?  They just finished managing a real-world build out, on time and on budget, on a virtually identical mine build.  That first-hand and very current experience is way more informing and telling on what to do and what to expect than they would get from "assumptions and projections" from someone else's study that comes out who knows when.

      Just some of my thoughts from reading between the lines.  




      1. Fun having AI play with numbers. Yeah I know it may not be entirely accurate.

        Radagast

        *************


        Here is the scenario analysis you requested, illustrating the potential post-tax NPV for the Van Dyke project at various sustained copper prices. The current copper spot price is approximately US$5.32/lb. 
        The project's 2020 Preliminary Economic Assessment (PEA) established that every US$0.25/lb increase in the copper price adds approximately US$90 million to the after-tax NPV. 

        Van Dyke Project NPV Scenario Analysis

        Copper Price (US$/lb) Price Increase from Base Case (US$/lb)Incremental NPV Increase (US$ millions)Estimated Post-Tax NPV (US$ millions)
        $3.15 (PEA Base Case)$0.00$0.0$644.7
        $3.50+$0.35+$126.0$770.7
        $3.75+$0.60+$216.0$860.7
        $4.00+$0.85+$306.0$950.7
        $4.50+$1.35+$486.0$1,130.7
        $5.00+$1.85+$666.0$1,310.7
        $5.32 (Current Spot)+$2.17+$781.2~$1,425.9
        $6.00+$2.85+$1,026.0$1,670.7
        Note: The "Estimated Post-Tax NPV" is calculated by adding the incremental NPV increase to the 2020 PEA base case NPV of $644.7 million. The current spot price calculation is an approximation based on this linear relationship. 
        As the table shows, if the current market price or higher long-term price forecasts (many analysts predict prices near or above $6.00/lb in the coming years) were sustained over the project's life, the project's valuation would more than double from its 2020 estimate. 
        This analysis is purely based on the sensitivity data from the original PEA. Real-world NPV calculations would involve an updated, detailed financial model, new operating cost estimates, and specific long-term price decks used by the company.
        1. Nice one.

          "Fun having AI play with numbers. Yeah I know it may not be entirely accurate."

          In this case AI's answer is easily verifyable.  It is simply incrementing projected NPV by using the tornado chart values stated in the PEA.  IMO, if anything, the multi-incremented NPVs are being understated by using the PEA's tornado chart.   

          The tornado chart approach works accurately for the first increment or two.  But when you have to factor in 10 increments the NPV starts getting increasingly understated.   Why?  The increment's purpose is to demonstrate the increase in NPV from just a few modest increases to the value of commodity.  This increment is the "free" extra money, meaning no extra cost was incurred to get the extra revenue.   The entire increment goes straight to your bottom line.   As you increase the number of increments going straight to the bottom line then you have a bottom line that can becomes increasingly and even mostly this free extra money.  Profit margin increases each year.   So I believe you need a more sophisticated way to re-calculate NPV when prices have moved into a whole new world.   That's probably why an update to a report is required instead or using the tornado chart in a way it wasn't intended to be used.

          JMHO - I welcome any pushback

                    

            1. Replying to @golfyeti

              Updating the PEA at VD also assesses the value which a possible JV would then utilize to value the project and buy-in costs. So if Taseko wanted a chunk or an earn-in these calculations would all be based on the revised PEA.


              I hadn't thought of the timing of VD Execution Plan being accelerated by the completion of the adjacent Florence project, thus freeing up resources to optimize and even shorten the VD Execution Plan. Great point golf. I agree they are the most logical partner....they were even mentioned in the last NR. Hint?


              K

            1. Replying to @calvin123456789

              Can you expand on that? 

              I agree that payback would be less than 2 years.  That shouldn't disable you from calculating the net present value of future cash flows. 

              Taseko's 85 million pounds of copper will bring in $454,750,000 at current spot in the next 12 months.  Opex is estimated at $95 M per year so the capex ($330 M) payback is less than a year, lol.    Spot price remaining the same you simply have to discount 21 annual EBITDAs of $360 M.  AI says:


                

              The net present value of 21 annual payments of $360 million discounted at an 8% rate is approximately $3.58 billion. 
              The net present value of 21 annual payments of $360 million discounted at a 5% rate is approximately $4,528.8 million (or $4.53 billion).

              N.B.  Deduct from above values the capex ($330 Million) for a full NPV calc. 
              1. Replying to @golfyeti

                What i'm saying is yes $3.5 billion NPV but are we going to get close to 100% of it?


                $8.35 CAD per share lets call it. $3.580/600 x 1.4


                i believe ongoing market rate is .5-.6 NPV so $4.175 per share CAD - $5.01 per share CAD.


                would you rather get the lump sum or the 84 cents CAD per year? and ride the higher copper price.


                lol at the end of the day.  VD, Florence, and high copper price is a good problem to have as a CUU shareholder.

      2. Upon reflection I see a good chance VD advances ahead of SC for us. I dont see SC monetization ahead of regulatory approval of Anglo Teck merger, timeline uncertain. Then we'd need to see the infamous SC met data to update the PEA. Even if we accepted a TECK internal PEA or somehow a -gasp-PFS, we'd need to review, probably with external consultant.


        VD PEA update should be straightforward and not take long. The change in VD language sounds like CUU saying "All ahead flank!"with an "FU Teck" lobbed over the port side as we leave them in our wake.... with our 25% costing them more each day.


        K