Thanks sibiu2 for providing the AI comments! If AI is correct in its assessment, perhaps the ongoing Chinese and South African approval delays (and possible rejection of the Anglo Teck merger), could also be affecting the market price of CUU shares.
Correction Patter! The merger is planned to take 18 months and is ahead of schedule. There is no guidance whatsoever to date to indicate that there is a delay or rejection with China and South Africa. This forum works best when we share facts. Thank you!
Here is more AI assessment for you to wonder about and react to :)
If a significant meteorite were to hit the Schaft Creek area, the following impacts could be expected based on the project's nature:
Project Disruption:A direct hit would likely cause damage to the proposed open-pit mine site, including the proposed mine pit, waste rock storage facilities, or the planned infrastructure along the east bank of Schaft Creek.
Safety Hazards:As a remote site primarily accessible by air, any impact would pose risks to staff, particularly with the 2024-2026 studies focused on drilling and geotechnical investigations.
Geological Disturbance:The area is already characterized by heavily fractured and sheared rock, with brittle deformation at various scales. A meteorite impact would cause further, catastrophic fragmentation of the rock.