
Coppernico Metals Inc.
TSX:COPR
OTCQB:CPPMF
Coppernico Metals Inc. is a Vancouver-based mineral exploration company pursuing copper-gold deposits in the Americas.
Company facts
- Exchange
- TSX
- Symbol
- COPR
- Secondary symbol
- CPPMF
- Industry
- Metals & Minerals
- Website
- coppernicometals.com
Company overview
Coppernico Metals Inc.
Copper-gold exploration at Sombrero, Peru
57,000 ha land package in Peru.Final drill permit received.Phase 2: ~20,000 m drilling planned.
Coppernico Metals Inc. is a Vancouver-based mineral exploration company pursuing copper-gold deposits in the Americas. Its flagship Sombrero project in Ayacucho, Peru, covers about 57,000 hectares with targets including Fierrazo, Nioc, and Tipicancha. The company has received a final drill permit and is preparing a Phase 2 drill program.
- C$6.5M
- Financing
- 9.9%
- Teck stake
- 20,000m
- Planned drill
- 3,122ha
- Permit area
Copper-gold exploration in Peru
Copper-gold explorer focused on Peru
Company overview
- Vancouver-based mineral exploration company.
- Pursues copper-gold deposits in the Americas.
- Flagship Sombrero project in Ayacucho, Peru.
Coppernico holds the Sombrero project through wholly owned subsidiary Sombrero Minerales S.A.C. The company is at the exploration stage, having completed surface sampling and an initial drill program, and is preparing Phase 2 drilling.
Exploration targets within the Sombrero project
Project portfolio
Flagship
Sombrero project
Copper-gold skarn and porphyry exploration project in Andahuaylas-Yauri belt. Land package of about 57,000 hectares, located 340 km southeast of Lima.
Target
Fierrazo target
Brownfield skarn target, first in Phase 2 drilling. Access road and pad construction underway. Historical drilling showed copper mineralization open in multiple directions.
Target
Nioc target
Undrilled surface copper-gold skarn target. Channel sampling returned 70.1 m of 0.92% Cu, 0.25 g/t Au, 2.45 g/t Ag. Drilling planned 2027.
Target
Tipicancha target
Younger epithermal-porphyry system. Phase 2 plans first-ever drill tests of copper mineralization at surface and targets concealed beneath volcanic cover.
Key figures from recent financings and exploration plans
Financial and operational snapshot
The company raised C$6.5 million in 2026 and plans a 20,000-metre drill program.
C$6.5M
Total secured through two 2026 financings (C$5.5M LIFE placement and C$995,349.60 strategic placement).
9.9%
Teck Resources ownership after August 2026 placement (19,390,436 shares).
20,000m
Planned Phase 2 drill program across nine targets.
Data as of November 10, 2026, based on company news releases.
Company milestones from the past year
Recent developments
- Nov 2026
- Final drill permit. Received Start-of-Activities authorization from Peru's Ministry of Energy and Mines, final approval for expanded EIA-Sd permit covering 3,122 hectares and up to 300 holes.
Sep 2026
- Drill contract signed. Signed agreement with AK Drilling International for minimum 5,000 metres in Phase 2, and stated C$6.5 million secured through two financings.
Aug 2026
- Permit expansion. Received approval of EIA-Sd expanding permitted drill area from 904 to 3,122 hectares, platforms from 38 to 181, holes from 49 to 300.
Aug 2026
- Teck invests. Closed non-brokered private placement of 2,843,856 units at C$0.35 for C$995,349.60, with Teck participating to hold 9.9%.
Jun 2026
- C$5.5M raised. Closed upsized LIFE placement of 15,714,286 units at C$0.35 for C$5.5 million, with warrants at C$0.50 until Jun 2028.
May 2026
- Nioc sampling. Reported channel sampling at Nioc returning 70.1 m of 0.92% Cu, 0.25 g/t Au, 2.45 g/t Ag, nearly doubling width of surface mineralization.
Upcoming milestones and plans
Next steps
Planned
- Phase 2 drilling. Company plans to start Phase 2 drilling at Fierrazo, with pace and scale of 20,000-metre program subject to market conditions and funding.Planned
2027
- Nioc drilling. Company advancing community agreement and drill permit for Nioc, with initial drilling anticipated in 2027 subject to approvals.Planned
Ongoing
- Project review. Company regularly reviews additional projects for potential acquisition.Planned
Key considerations
- Drill timing depends on community coordination and logistics.
- Phase 2 scale subject to market conditions and funding.
- Financings issued units at C$0.35 with warrants.
Who runs the company
- Ivan Bebek, Founder, Chair and Chief Executive Officer
- Stacy Rowa, Chief Financial Officer
Unclaimed AGORACOM Hub. AGORACOM wrote this overview from the company’s public filings, news releases and website. The company is not an AGORACOM client and has not reviewed it. It is not investment advice.