Crystallex maintains communication with Senior Government Officials in the Venezuelan Administration and/or Agencies involved in the oversight of mining activities in Venezuela.

To date, no one has approached Crystallex regarding the terms of the Mine Operating Contract and no one has advised the Company of any deficiencies in the contract. Thus there have been no negotiations regarding the Contract or terms of the Contract.

As per the Crystallex news release dated November 28, 2008 “It is Crystallex's intention to settle the dispute amicably within six months. If the dispute has not been settled amicably within six months, Crystallex has the option of submitting the dispute to international arbitration.”

The Company will update investors upon any material news or changes through news releases and/or regulatory filings.

Regards,

Richard Marshall

Join the conversation about Crystallex International.

Reply

Replies

  1. This response from Marshall is a bit conflicting in itself, maybe is just a warding problem but on one side he tells us that there is no change in the understanding of the contract with the VZ officials and secondly he tells us that we have a dispute in place and an option to go to arbitration.

    Now if there is a dispute that means that we have a contrariness in the VZ side but at the start of the response from RM there is no change in the original set up of the contract .

    So where is the impediment and why we are not allowed to know about it.

    We are being margined by VZ official as a brainless investors and i hope not from our own BOD as well.

    1. oiramoric

      Venezuela has denied the final environmental permit. They said they would consider a revised plan from KRY, dually presented, accepted and then still no response. Written requests for clarification refused.

      KRY is working at keeping their only two options open: the arbitration route or the permit. I would suggest you avoid reading into RM's comments because he can't and will not communicate anything of substance unless via a press release.

      It is my opinion that KRY will not embark upon the arbitration process because it won't come to that. Likewise a permit will not be issued either. The solution sadly will be a reverse merger by RML into KRY, thereby avoiding the KRY bondholder(s) issue and giving RML the TSX listing. This won't happen till RML closes their Can.Cap underwriting in March. I would suggest some movement after that juncture around the time that the Venezuelan community projects are completed.

      Once RML reverses into KRY, look then towards Venezuela granting the permit, bondholder(s) are then silenced, RML has some cash on hand and gets the KRY equipment and permit. At that stage I would think some consolidation in the number of shares outstanding for the combined company would be in order!

      What does KRY get - a lifeline avoiding arbitration.

      How many shares or % ownership of the combined entity do KRY shareholders get is tough to answer. Likewise it's hard to know what the new co. structure (something Endeavour refers to) will be worth post permit.

      To think now that arbitration is going to happen seems further and further away. Perhaps that's why KRY refers to it as as option?

      Anyway, just my opnion.

      Cheers


      Teutracker

      1. Your opinion makes sense Teutracker but i am just wondering if with a reverse merger there would be also a reverse shares split for price solidification because the enormous amount of outstanding shares.

      2. Teuk-- Why would any KRY stock holder want to have anything to do with RML ?????? What ,other than a lot of bluster, do they have to offer???? Don't say the permit without some proof. You have none . We sure as hell don't need more shares so what else do they have NOTHING !!!!

        We are moving into the drivers seat with each passing day. Hugo is painting Vz. into a corner with his spending. Unless he wants to tie up the mine for years he will need to let the deal stand.

        Do we need to get our light out from under a basket with some good general PRs ??? You bet your bippie we do !!!!! How many people in Vz. know how much KRY has done for them??? For that matter, how much do you know ???

        Lets all stop with the damn " hat in hand "crap and start acting like business people with something to offer a nation that needs our help as much as we need theirs. That is my opnion !!!!! OLD FOOL

        1. If RML is going to make an offer I think it will be a serious one. This could be their last shot at being a big player in VZ. They must feel they have the upper hand with the politics as it is and to see it slip away, first with GRZ and then possibly KRY?? No, if they come to the table I think it will be a good offer that makes us seriously think about it. I think they need KRY ALMOST as badly as VZ needs to start mining the gold! VZ cannot afford to delay!

          1. midas

            good one! You hit the nail on the head. Venezuela is a screwed-up place. hey, Hugo likes the Russians, KRY has been denied at every turn so what's it going to be...I still think a negotiated deal with KRY management to allow a reverse merge with RML to get the TSX listing and thereby avoiding the KRY bondholders. It's not a good lookin situation but hey they bring the CanCord stragglers, possibly EDV, the KRY equip and a permit a short while later. Why posters refuse to see this as even a possibility is beyond me. I have no love for Venezuela, even less for RML however faced with reality I have to consider RML as a possibility.

            Teutracker

            1. Replying to @Teutracker

              "KRY has been denied at every turn so what's it going to be"

              Really??? let take a look, some may be redundant but sometimes we tend to look short term, here is an old post need updating but youy statement KRY has been denied at every turn ...... this surely surpass RML accomplishment

              1: the big day for KRY



              Crystallex and Venezuela to Develop Las Cristinas - Company welcomes

              government announcement 9/8/2002

              Download this Press Release




              TORONTO - CRYSTALLEX INTERNATIONAL CORPORATION (symbol KRY on TSX and

              AMEX) President and CEO Marc J. Oppenheimer welcomed the selection of

              Crystallex by the Venezuelan government Friday to develop Las

              Cristinas, believed to be one of the largest undeveloped gold

              projects in Latin America and the world .As a result of this

              decision, all legal requirements including title, possession, and

              mining rights will be brought together so that development of the Las

              Cristinas ore-body can take place.



              "This is a historic moment for our Company and our shareholders,"

              said Mr. Oppenheimer. "We are pleased to have been selected and look

              forward to beginning work on the project. We also salute our

              shareholders who have steadfastly stood by our Company as we

              patiently sought to obtain possession of this property in a

              legitimate and lasting way."



              Late Friday in Caracas, Venezuela's state industrial holding company,

              Corporacion Venezolana de Guayana (CVG) announced that its Directors

              had "approved the signing of an operating contract with the Canadian

              company Crystallex for the development of the Las Cristinas gold

              deposit." In a statement released following the Board meeting, CVG

              President Francisco Rangel Gomez said Crystallex was chosen to

              operate the project because it offered the best prospect for a rapid

              development and start-up of the mine.



              "The selection of Crystallex to develop Las Cristinas acknowledges

              that the company has the experience, capability and the long-term

              commitment to Venezuela to build a sustainable project that will

              benefit the Venezuelan economy and in particular the people of

              Bolivar State where Las Cristinas is located," added Mr.

              Oppenheimer. "The CVG is a large and important Venezuelan government

              corporation. We are very proud to be developing this property with

              the CVG."



              Crystallex started mining operations in Venezuela's Kilometre 88 in

              1994 and is the only international company to have constructed and

              operated a producing industrial mine at Kilometre 88. Today, the

              Company has operations in all three of Venezuela's major gold

              producing districts and has invested more than US$120 million in

              Bolivar State where the Cristinas concessions are located. The

              Company is currently mining gold and, at the same time, developing

              two new mines in this region.



              About Crystallex:

              Crystallex International Corporation is an emerging intermediate gold

              mining company operating as well as developing new mines in Venezuela

              and Uruguay. Crystallex's strategy for growth is to develop its

              portfolio of producing properties as well as to diversify

              geographically by investing in producing or near-production projects

              and by exploring properties of merit in other areas.



              On Behalf of the Board:



              Marc J. Oppenheimer, President & CEO



              2: putting pen to paper







              Crystallex Signs Agreements to Develop Las Cristinas 9/17/2002

              Download this Press Release





              CARACAS, Venezuela - CRYSTALLEX INTERNATIONAL CORPORATION (Symbol KRY

              on the TSX and AMEX) reported today the formal signing of a

              definitive agreement with the Corporacion Venezolana de Guayana (CVG)

              for the development of Las Cristinas 4, 5, 6 and 7, believed to be

              one of the largest undeveloped gold projects in Latin America and the

              world. The formal agreement was signed at the CVG offices in Puerto

              Ordaz, Venezuela with General Francisco Rangel Gomez, the President

              of the CVG, signing on behalf of the CVG and Crystallex's Chairman,

              Robert Fung, and President and CEO, Marc J. Oppenheimer, executing

              the agreement on behalf of Crystallex.



              The execution of the definitive agreement follows the announcement by

              General Rangel Gomez on September 6, 2002 of the selection of

              Crystallex to develop Las Cristinas.



              "We are pleased that we could move to a definitive agreement so

              quickly," commented Mr. Oppenheimer. "We now have all of the elements

              that we need to move forward. Crystallex, under the agreement, has

              the exclusive right to develop Las Cristinas 4, 5, 6 and 7 in all

              respects including exploration, the design and construction of

              facilities, the operation of those facilities for the processing of

              gold and the subsequent exploitation, commercialization and sale of

              gold," he added.



              "What we are signing today guarantees that the project will be

              completed exactly as set forth in the agreement. It is a solid and

              secure agreement that protects both of us in order to complete this

              project successfully." General Rangel Gomez said.



              Highlights of the agreement are:



              Crystallex will control 100% of the reserves and resources of the

              project and all production and proceeds are for the account of

              Crystallex subject only to the payment of royalties to the Venezuelan

              Ministry of Energy and Mines and to the CVG. The royalty to the

              Ministry is fixed at three per cent, and the royalty to the CVG will

              vary with the price of gold. Up to a price of US$280 the royalty will

              be 1%. From US$280 to US$350 the royalty will be 1.5%. From US$350 to

              US$400 the royalty will be 2% and above US$400, the royalty will be

              3%. Production will be measured against an annual production plan

              prepared by Crystallex and approved by the CVG.The agreement has an

              initial term of 20 years with two renewals each for a term of 10

              years.



              The CVG will assist Crystallex in obtaining all necessary permits,

              including explosive and operating permits, and will be responsible

              for obtaining environmental permits with the support of Crystallex.



              Throughout the term of the agreement Crystallex will have the

              exclusive use of National assets related to the project including

              digital drill data, drill cores, and existing studies in the

              possession of the CVG, and all infrastructure improvements on the

              property. Crystallex will pay US$15 million for the acquisition of

              these National assets including the use of the data, studies and

              infrastructure. Included in the infrastructure is access to the new

              hydroelectric substation located adjacent to the site.



              Crystallex will address immediately the needs of residents in the

              area through the creation of employment, training programs and

              improvements to the health care system. In the longer term Crystallex

              will address improvements to the water and sewage system and the

              local road network.



              "We have arrived at an agreement which clearly sets forth our

              exclusive access to the reserves and resources of Las Cristinas and

              grants to us our exclusive right to exploit the resource to its full

              potential," said Mr. Oppenheimer. "We are confident that the

              financial and investment community will quickly understand and

              support this agreement. We will immediately commence our review of

              the data in order that we might complete an in depth feasibility

              study to support our construction and production plans."



              "We look forward to working with the CVG and the Government to

              develop this long awaited project which will benefit not only our

              Company, but also the people of Bolivar State and the Kilometre 88

              region," added Mr. Oppenheimer.



              3: Cystallex Takes Possession of Las Cristinas Properties 9/30/2002

              Download this Press Release





              TORONTO - CRYSTALLEX INTERNATIONAL CORPORATION (TSX, AMEX: "KRY")

              today announced that transition arrangements have been substantially

              completed and it has taken possession of the Las Cristinas 4, 5, 6 &

              7 properties in Venezuela, in accordance with the mining operation

              agreement signed Sept. 17, 2002 with the Corporacion Venezolana de

              Guayana (CVG).



              The Crystallex transition team, headed by Vice-President of

              Operations, Dr. Sadek El Alfy, and a team of consultants is reviewing

              the inventory of National assets including data, studies and

              information made available by the CVG under the terms of the mining

              operation agreement. Plans are underway to immediately commission a

              full feasibility study for the development of the Las Cristinas

              properties in Kilometer 88.



              Las Cristinas 4, 5, 6 and 7 are believed to form one of the largest

              undeveloped gold deposits in Latin America and the world. Under the

              agreement with the CVG, Crystallex has the exclusive right to develop

              Las Cristinas 4, 5, 6, and 7 in all respects including exploration,

              design and construction of facilities, operation of the facilities

              for the processing of gold and subsequent exploitation,

              commercialization and sale of gold. The Company will control 100% of

              the resources of the project. All revenue from the sale of gold will

              be for the benefit of Crystallex, subject to payment of royalties to

              the Venezuelan Ministry of Energy and Mines and to the CVG.



              4:

              Crystallex Welcomes Endorsement of the Republic of Venezuela

              4/11/2003

              Download this Press Release





              Caracas, Venezuela - Crystallex International Corporation (KRY: TSX,

              AMEX) welcomes the strong endorsement given by the Republic of

              Venezuela to the Company's Mining Operation Contract to develop and

              exploit the Las Cristinas gold properties.



              Senior representatives of the Executive of the Republic of Venezuela,

              including General Francisco Rangel Gómez, President of the

              Corporación Venezolana de Guayana ('CVG'), and representatives from

              the Legislative authorities including Mr. Luis Salas, President of

              the Energy and Mines Commission of the National Assembly, Luis

              Velásquez Alvaray, recently appointed Vice-President of the

              Comptroller´s Commission of the National Assembly, and Rafael Simón

              Jiménez, member of the Comptroller´s Commission and until December

              2002, Vice-President of the National Assembly of the Republic of

              Venezuela, clearly stated that the Republic of Venezuela fully

              supports the Las Cristinas Mining Operation Contract. They further

              stated that in the history of the Republic of Venezuela, there has

              never been a single case where the government failed to honour

              commitments to mining, petroleum or telecommunications companies.

              These assurances were made during public meetings this week in

              Venezuela with representatives of Crystallex and international

              financial institutions.



              Crystallex International Corporation dismissed as self-serving the

              allegations contained in Vannessa Ventures April 8, 2003 press

              release. Crystallex's Mining Operation Contract is a final and

              binding agreement based on the authority and the laws of the Republic

              of Venezuela and is not open to discussion.



              5: Feasibility Study approval CVG






              Crystallex Announces CVG Approval of Las Cristinas Feasibility Study -

              Company now anticipates the construction phase of the project

              3/8/2004

              Download this Press Release





              TORONTO - Crystallex International Corporation (KRY on TSX and Amex)

              announced today the approval by the Corporacion Venezolana de Guayana

              ("CVG") of Crystallex's full Feasibility Study for the development of

              the Las Cristinas mining properties in Bolivar State, Venezuela. On

              September 17, 2002, Crystallex entered into a mining operation

              agreement with the CVG which granted to Crystallex the exclusive

              right to fully develop and exploit the significant gold reserves and

              resources at Las Cristinas. Mine Development Associates of Reno,

              Nevada, estimated in the Feasibility Study that proven and probable

              reserves amounted to approximately 10.2 million ounces (246 million

              tonnes at 1.29 g/t) based on measured and indicated resources of some

              15.3 million ounces (439 million tonnes at 1.09 g/t) inclusive of the

              10.2 million ounces of reserves, while inferred resources were

              estimated at approximately 6.1 million ounces (208 million tonnes @

              0.91 g/t). The full Feasibility Study, prepared by SNC-Lavalin

              Engineers & Constructors, was delivered to the CVG on September 10,

              2003 by Crystallex, and since that time, Crystallex has worked

              closely with the CVG to obtain final approval. The Feasibility Study

              addresses and confirms the economic and technical viability of the

              Las Cristinas Project and provides the foundation for construction

              and operating plans.



              6: Land Occupation Permit



              TORONTO, ONTARIO, August 4, 2004 – Crystallex International

              Corporation (TSX: KRY) (Amex: KRY) today advised that the Land

              Occupation Permit (often referred to as the "land use permit") has

              been confirmed for the Las Cristinas gold properties. The Land

              Occupation Permit authorizes the use of the Las Cristinas properties

              for the purpose of mining, and is a critical element of final

              permitting for the project. Crystallex and the Corporacion Venezolana

              de Guayana ("CVG") are fully engaged in the permitting process,

              following the guidelines prescribed by the Ministry of the

              Environment and Natural Resources ("MARN"), to obtain the final

              permit, i.e. the "Permit to Impact Renewable Natural Resources",

              during the fall of 2004, when full scale construction would commence.

              As previously announced, detailed engineering and environmental works

              are continuing, and purchase orders/contracts are being awarded under

              the Engineering Procurement and Construction Management contract with

              SNC Lavalin Engineers & Constructors.







              Crystallex President and CEO, Todd Bruce, commented, "The Land

              Occupation Permit is a critical step in the process of getting Las

              Cristinas permitted and its confirmation is a prerequisite to

              securing the final "Permit to Impact Renewable Natural Resources"

              which will complete the permitting process. Given the level of CVG

              and Crystallex involvement in the permitting process and the positive

              response of MARN to date, we remain confident that Las Cristinas will

              be fully permitted this fall which will see full scale construction

              commencing as scheduled. As we speak our site activities continue to

              accelerate as we complete refurbishment of the existing construction

              camp while extending and tarring the airstrip to accommodate the

              increased demands that will be imposed by the project."



              7: quarry right



              TORONTO, ONTARIO, February 15, 2006 – Crystallex International

              Corporation (TSX: KRY) (Amex: KRY) confirmed today that it has been

              granted the rights to explore and develop a quarry for aggregate by

              the Mining Institute (IAMIB) of Bolivar State, Venezuela. Aggregate

              is required for the construction of the Las Cristinas Project and the

              concession is located approximately 1 kilometre from the Las

              Cristinas Project site.



              Todd Bruce, President and CEO of Crystallex commented, "The issuing

              of the quarry permit is an important step in widening our options to

              secure aggregate for the Las Cristinas project. Crystallex looks

              forward to the receipt of the final environmental permit so that

              construction of the Las Cristinas mine can commence."



              8: Permit (not the big one)



              (TSX: KRY) (Amex: KRY) reported today that the Ministry of the

              Environment and Natural Resources ("MARN") in Venezuela has notified

              Crystallex of the Ministry's approval of the "Permit to Impact

              Natural Resources" for a quarry on the Albino property to provide

              aggregate for the adjacent Las Cristinas project, and of the

              initiation of the normal administrative process by the Ministry.



              Previously, on February 15, 2006, Crystallex announced that it had

              been granted the rights to explore and develop a quarry on the Albino

              property as a source of aggregate for the Las Cristinas project by

              the Mining Institute (IAMIB) of Bolivar State, Venezuela. Aggregate

              is required for the construction and operating phase of the Las

              Cristinas Project which currently contains gold reserves of some 13.6

              million ounces at a gold price of US$400 per ounce. The Albino

              concession is located approximately 1 kilometre from the Las

              Cristinas Project site.



              Todd Bruce, Crystallex President and CEO commented, "MARN's approval

              of the Permit to Impact Natural Resources for the Albino aggregate

              quarry that will service the Las Cristinas project is a key

              development as it brings us closer to the issuance of the Permit to

              Impact Natural Resources for the Las Cristinas project itself. We

              look forward with great anticipation to receiving this final permit

              for Las Cristinas which will enable the company to commence the

              construction process."



              9: one of the most important approval



              TORONTO, ONTARIO, March 26, 2006 – Crystallex International

              Corporation (TSX: KRY) (Amex: KRY) reported today that at meetings

              convened by the Corporacion Venezolana de Guayana ("CVG"), Crystallex

              was informed by the CVG it has received official notice from the

              Ministry of Basic Industry and Mining ("MIBAM") advising that MIBAM

              has formally approved the technical, economic and financial

              Feasibility Study for the Las Cristinas gold exploitation project. In

              addition, Crystallex has received formal confirmation of this

              approval directly from MIBAM itself.



              The official approval of the project by MIBAM is based on the

              original terms and conditions of the underlying Mine Operating

              Agreement ("MOA") signed between the CVG and Crystallex in September

              2002. Approval by MIBAM of the Las Cristinas gold project is a

              critical milestone as it brings final resolution to the technical,

              economic and financial parameters of the Las Cristinas gold project

              as established in the Crystallex Feasibility Study. Through the MIBAM

              approval, the Government of Venezuela has officially sanctioned the

              Las Cristinas gold project from the technical, economic and financial

              perspective. The project will be of significant importance to the

              State of Bolivar and the Republic of Venezuela.



              Todd Bruce, Crystallex President and Chief Executive Officer

              said, "This formal approval by MIBAM represents the crucial

              cornerstone for the development of the Las Cristinas gold project and

              also represents the final external input required by the Ministry of

              the Environment and Natural Resources ("MARN") to complete the

              permitting process. We anticipate receiving this MARN permit in the

              near term which will allow us to immediately begin construction of

              the Las Cristinas Gold Project."



              Detailed engineering and design for the Las Cristinas project is

              essentially complete and approximately US$179 million has been

              committed, including US$94 million already spent, under contract for

              equipment purchase orders comprising all long lead items such as the

              mining fleet, crushers and grinding mills, as well as various

              construction and service contracts. The mining fleet is ready and in

              storage on the docks in Houston, USA and Antwerp, Belgium and all the

              other major equipment items are also on schedule in terms of

              fabrication and delivery.



              Upon receipt of the final permit from MARN, Crystallex will commence

              construction of the base case 20,000 tonnes per day ("tpd") operation

              which should see initial production commence in early 2008 at an

              average level of approximately 300,000 ounces of gold annually over

              the first five years. With 13.6 million ounces of proven and probable

              gold reserves, in excess of 17.7 million ounces of measured and

              indicated gold resources and an additional 4.5 million ounces of

              inferred gold resources (Crystallex News Release dated February 13,

              2006), Crystallex plans to assess opportunities to double the scale

              of operations to 40,000 tpd based on the previously completed 40,000

              tpd expansion pre-feasibility study which would see annual gold

              production average approximately 500,000 ounces.



              10: not applicable to the Crystallex Las Cristinas operating

              contract, Article 11, read on



              TORONTO, ONTARIO, June 13, 2006 – Crystallex International

              Corporation (TSX: KRY) (Amex: KRY) - commented today that there has

              been considerable confusion resulting from yesterday's press coverage

              on possible revisions to the Venezuelan mining law, namely the

              incorporation of mixed companies as an exploitation structure in the

              mining sector. The Government stake in such mixed companies would be

              at least 51%.



              The Crystallex share price has been negatively impacted as the market

              seems to have interpreted the comments about mixed companies in the

              mining sector to mean that this structure has now become the only

              model under which mining will be allowed in Venezuela.



              It is important therefore to stress that the mixed company model

              under discussion is not applicable to the Crystallex Las Cristinas

              operating contract as the draft mining law provides express

              recognition of existing contracts which are in proper execution and

              good legal standing.



              Furthermore Article 11 of the draft mining law specifically provides

              for exploitation by way of operating contract, in a manner separate

              and distinct from the mixed company structure contemplated elsewhere

              in the draft. A translation of Article 11 is provided as follows:



              "Article 11: For the purposes of this Law, operation contracts shall

              be understood as those legal arrangements entered into between

              National Social Mining Production Corporation and private legal

              entities, for the rendering of services within the work frame of

              exploration activities and rational and sustainable exploitation of

              mineral resources."



              Crystallex holds a valid and binding operating contract issued by the

              state through the Corporacion Venezolana de Guayana ("CVG"), its

              regional natural resource development arm, that was officially

              approved and endorsed by the Ministry of Basic Industries and Mining

              ("MIBAM") in March of this year. As noted in the Venezuelan press

              yesterday, MIBAM was the entity responsible for preparing the mining

              law reform working paper and providing it to the National Assembly.



              11:



              need I say more (needed a fill in for duplicated no.10 lazy to go

              back and change the No.)



              12: shareholder rights plan, protection from low hostile buyout,

              don't always work but we all get a vote



              TORONTO, ONTARIO, October 30, 2006 – Crystallex International

              Corporation (TSX: KRY) (Amex: KRY) - announced that the shareholders

              of the company have voted at a special meeting held earlier today to

              ratify, confirm and approve a new shareholder rights plan

              (the "Rights Plan") which was originally approved by the Board of

              Directors of Crystallex on June 22, 2006 following the Corporation's

              2006 annual and special meeting of shareholders.



              The Rights Plan has not been adopted in response to any proposal to

              acquire control of the Corporation and is not intended to prevent

              take-over bids. Under the Rights Plan, take-over bids which meet

              certain requirements intended to protect the interests of all

              shareholders are deemed to be "Permitted Bids". Permitted Bids must

              be made by way of a take-over bid circular prepared in compliance

              with applicable securities laws and, among other conditions, must

              remain open for sixty days.



              The Rights Plan is similar to other shareholder rights plans recently

              adopted by other Canadian corporations. Until the occurrence of

              certain specific events, rights issued pursuant to the Rights Plan

              will trade with the common shares of the Corporation and be

              represented by the share certificates for such shares. The rights

              become exercisable only when a person, including any party related to

              or acting jointly or in concert with such person, acquires or

              announces its intention to acquire 20% or more of the outstanding

              common shares common shares of the Corporation without complying with

              the "Permitted Bid" provisions of the Rights Plan. Should a non-

              permitted acquisition occur, each right would entitle each holder of

              common shares (other than the offeror or certain parties related to

              it or acting jointly or in concert with it) to purchase additional

              common shares of the Corporation at a 50% discount to the market

              price of the shares at that time.



              The Rights Plan is subject to reconfirmation at every third annual

              meeting of shareholders until its expiry on June 22, 2016.



              13: approval of the Environmental Impact Study



              TORONTO, ONTARIO -- (MARKETWIRE) -- 06/14/07 -- Crystallex

              International Corporation (TSX: KRY)(AMEX: KRY) reported today it has

              received notice from the Corporacion Venezolana de Guayana ("CVG"),

              that the requirements of the Ministry of the Environment and Natural

              Resources of Venezuela ("MinAmb" formerly referred to as "MARN") for

              the issuance of the Environmental permit to commence construction of

              the Las Cristinas Project have been fulfilled.



              MinAmb, based on its approval of the Environmental Impact Study

              ("EIS") for the Las Cristinas gold project, requested the CVG to post

              a Compliance Guarantee Bond and pay certain taxes for the issuance of

              the Environmental permit. Crystallex has posted the bond and paid the

              taxes.



              The CVG confirmed that the approval of the EIS, the posting of the

              bond and the payment of the taxes represent the final and conclusive

              step in the procedure for the issuance of the Environmental permit to

              construct the Las Cristinas Project. Crystallex as the builder and

              operator of Las Cristinas will have use of this permit in order to

              construct the project on the basis of the approved feasibility study.



              In the formal notice that MinAmb sent to the CVG, it was stated that

              the Environmental permit will be issued following the payment of

              taxes and posting of the bond. The CVG now awaits the permit required

              for the construction of the mine from MinAmb.



              Mr. Gordon Thompson, Crystallex President and CEO commented, "The

              request by the Venezuelan Government for the posting of the

              Compliance Guarantee Bond and taxes further confirms our

              understanding that we've complied with the very final stage of the

              procedure for receipt of the environmental permit."



              14:



              Resources: 20.76 million M&I $$$$$ 16.86 million ounces P&P $$$$ what

              will it be at $750.00 gold price, need much more fingers



              - Measured and Indicated Resources are estimated at 20.76 million

              ounces (629 million tonnes with an average gold grade of 1.03g/t,

              which comprises 146 million tonnes at a gold grade of 1.14g/t (5.38

              million ounces) in Measured Resources and 483 million tonnes at a

              grade of 0.99g/t (15.38 million ounces) in Indicated Resources). This

              represents a gain of 3.1 million ounces, or 18%, over the August 2005

              Measured and Indicated Resource estimate of 17.66 million ounces of

              gold (501 million tonnes grading 1.10g/t gold comprising 66 million

              tonnes at a grade of 1.21g/t containing 2.57 million ounces in

              Measured Resources and 435 million tonnes at a grade of 1.08g/t for

              15.09 million ounces in Indicated Resources).



              - The average grade of Measured and Indicated Resources decreased 6%

              from 1.10g/t to 1.03 g/t due to the inclusion of slightly lower grade

              mineralization in the current resource estimate.



              - The Inferred Resource estimate, which does not contribute towards

              Proven and Probable Reserves, increased to 6.28 million ounces (230

              million tonnes at an average gold grade of 0.85g/t) from 4.54 million

              ounces (163 million tonnes at an average grade of 0.87g/t gold). This

              represents an increase of 1.74 million ounces, or 38%, in the

              Inferred Resource.



              Reserves:



              - Proven and Probable Reserves are estimated at 16.86 million ounces

              of gold (464 million tonnes grading 1.13g/t). The updated reserve

              estimate comprises 113 million tonnes at a gold grade of 1.24g/t

              (4.48 million ounces) in Proven Reserves and 351 million tonnes at a

              grade of 1.10g/t (12.38 million ounces) in Probable Reserves. This

              represents an increase of 2.85 million ounces or 20% from the Proven

              and Probable Reserve of 14.01 million ounces (278 million tonnes

              grading 1.15g/t gold at a gold price of $450 per ounce) reported in

              February, 2007.



              15 :

              TORONTO, ONTARIO -- (MARKET WIRE) -- 10/26/07 -- Crystallex

              International Corporation (TSX: KRY)(AMEX: KRY) reported that the

              Venezuelan National Assembly's Commission of Economic Development has

              today published a report following its October 4th, 2007 Las

              Cristinas hearings. The Commission's Report noted that

              representatives from the Ministry of the Environment and Natural

              Resources of Venezuela (MinAmb), the Ministry of Basic Industries and

              Mining ("MIBAM"), the Corporacion Venezolana de Guayana ("CVG"), and

              Crystallex testified at the hearings.

              1. Replying to @mineonmoney

                "Crystallex will address immediately the needs of residents in the
                area through the creation of employment, training programs and
                improvements to the health care system. In the longer term Crystallex
                will address improvements to the water and sewage system and the
                local road network."



                In which the conclusion of this is coming shortly with the completion of the Medical center and the Sewage plant.


      3. teut, at the time "the permit was denied" it was actually an issue of "no mining in the imataca" was'nt it?...which has since been rescinded...the following PR is probably the best one imo...BUT, it does raise the question as to "why are we not already in arbitration?".....imo, the ven govt has tried every BS trick in the book to avoid litigation and deny both kry and grz operating thier mines...personally, i think the venz (hugo) are out of options now... either they issue the permits and go with what they have agreed to or we all go to court....please read the bold portions of the following and any opinions on why we are not already in court would be appreciated......



        Press Release Source: Crystallex International Corporation

        Crystallex Files Rebuttal
        Monday May 12, 2008 10:58 am ET



        TORONTO, ONTARIO--(MARKET WIRE)--May 12, 2008 -- CRYSTALLEX INTERNATIONAL CORPORATION (Toronto:KRY.TO - News)(AMEX:KRY - News) today provided a further update on developments regarding the Las Cristinas gold project in Bolivar State, Venezuela. On April 30, 2008, the Company reported that a Director General in the Administrative Office of Permits at the Ministry of the Environment and Natural Resources of Venezuela ("MinAmb") had issued a communication to the Corporacion Venezolana de Guayana ("CVG"), the concession holder of the Las Cristinas concessions, that the Office of Permissions in the Ministry had denied the request of the CVG for the permit to affect the natural resources in Sifontes municipality of the State of Bolivar. Since being advised of the letter, Crystallex has had the opportunity to meet with Officials of both the Government of Venezuela and the CVG and has begun the process seeking the reversal of the Director General's communication in order to bring the Las Cristinas gold deposit into production.

        ADVERTISEMENT
        Today Crystallex filed the legal rebuttal to the position taken by the Director General of Permits in the Ministry of the Environment and Natural Resources. We anticipate that our partner the CVG will be filing their rebuttal in due course. The Ministry of the Environment and Natural Resources Director General who issued the letter has, under the administrative law of Venezuela, 15 business days to reply formally. If there is no reply, under law the answer is deemed to be negative. At that time, the Company has the legal right to appeal directly to the Minister of Environment and Natural Resources who also has a set time (90 business days) to issue a finding. If at that time the answer is negative, Crystallex has a number of legal avenues to pursue both in and out of Venezuela in order to protect its shareholders' rights.

        The communication from this Director General of the Ministry of the Environment and Natural Resources is in conflict with the Las Cristinas Environmental Impact Study approval, Construction Compliance Bond Request and Environmental Tax request issued by the Ministry of the Environment and Natural Resources. Both the posting of the Bond and payment of the requested Tax were satisfied in 2007 and Crystallex received receipt of acceptance. This communication appears to be in opposition to all mineral mining in the Imataca Region. In the opinion of Crystallex's management, the communication in question also leaves a number of current and historic projects standing contrary to the communication. In addition, Crystallex believes that the content of the letter contradicts Presidential Decrees, National Assembly Resolutions, Ministry of the Environment and Natural Resources Resolutions, and Ministry of Basic Industry and Mines ("MIBAM") Resolutions.

        Since the contents of the Director General's letter became public, local and indigenous communities, and Venezuelan Officials have voiced continued support for the development of the Las Cristinas project and other mining projects in the region. Crystallex has also become aware that the Venezuelan National Assembly intends to hold hearings regarding the Director General's letter and the status of the Las Cristinas project.

        The Company is continuing its efforts with the support of Venezuelan governmental agencies to advance the Las Cristinas project which will create significant employment, healthcare facilities and sustainable development for the surrounding communities.

        In an effort to clear up any misinformation regarding the Venezuelan permit process and timelines, the Company has outlined environmental permitting milestones:

        - April 2004 - Crystallex and the CVG submit a draft Environmental Impact Study for Las Cristinas to the Ministry of the Environment and Natural Resources for consideration. The Submission of the Environmental Impact Study in April of 2004 started the environmental permitting process which included extensive dialogue, questions, meetings, and hearings between Crystallex, the CVG and the Ministry of the Environment and Natural Resources.

        - August 2004 - Land Occupation Permit for Las Cristinas confirmed by the Ministry of Basic Industry and Mines.

        - March 2006 - Ministry of Basic Industry and Mines approves Las Cristinas Feasibility Study and development plans.

        - June 2007 - Ministry of the Environment and Natural Resources approves Las Cristinas Environmental Impact Study.

        - June 2007 - Ministry of the Environment and Natural Resources requests Construction Compliance Guarantee Bond and Environmental Taxes, the final steps before processing and issuing of the Las Cristinas Environmental Permit. Crystallex posts the Construction Compliance Guarantee Bond and pays the Environmental Taxes.

        - October 2007 - Ministry of the Environment and Natural Resources Officials testify to National Assembly that all requirements for Las Cristinas have been fulfilled and that the Environmental Permit will be issued.

        - April 2008 - CVG receives letter from a Director General in the Ministry of the Environment and Natural Resources questioning environmental aspects of project and indicating all mining activities in region are illegal.

        1. "Crystallex has a number of legal avenues to pursue both in and out of Venezuela in order to protect its shareholders' rights"

          cjr, To my knowledge, Crystallex has pursued only ONE legal avenue - the 6 months Notification limit for settling the dispute which expires May 27th/09.

          What are the other "number of legal avenues" that KRY can pursue? This will take more time, all the while KRY is burning cash! Can someone on this board enumerate these other alternative avenues other than Aritration?

      4. Not to get overly analytical but I don't think that your scenerio would be considered a "reverse takeover". RML is already publically traded and KRY is not simply a shell corp. with a TSX listing. It would simply be either a merger or an acquisition by one or the other.

    2. I just hope that KRY does not procratinate in Filing for Arbitration when the 6 months expires, and that the Vennies have been made aware of the consequences.



      1. I agree. Perhaps it is proper to not make the action definite now,

        but keeping a company hanging the way VZ has seems to me

        a violation, at least in spirit, of the contract.

    3. I spoke to Richard today. I have spoken with him in the past but not in a few months. He seemed much more guarded with his comments than he had in the past. As this matter leads to litigation on several fronts he will say even less. Unfortunately this is a be patient and pray situation.

      I truly hope Kry does file arbitration on the first possible date as I want a resolution. Further, if we get to this point Kry will need a fundraising which will cause further dilution. It appears only the executives and their trading partners are making money not the shareholders. I do not want to pay them without results anymore. I would rather go bankrupt.



      1. RM has reason to be guarded with his responses. The man is being pumped night and day by shareholders wanting information he either does not have or cannot give.....for whatever reason.

        I doubt anyone's making real money on this one Mayo.....maybe those with large blocks who swing trade a few pennies.

  2. Even Rusoro is fighting the bureaucratic process. I wonder when this will be announced and if it will be a large event to include the start of a wide range of gold mining projects?



    This is an excerpt from an article on 2-20:



    "since La Camorra is still in the hands of the National Mining Company
    (i.e. the Venezuelan government) pending its formal transference to
    the Venezuelan Guayana Corporation (CVG) gold-mining subsidiary CVG-
    Minerven and Rusoro Mining under the terms of the Russia-Venezuela
    consortium agreement signed last November"



    I asked RML when the formal transference was scheduled:



    It is a work in progress. It will take time bureaucratically at the Government level.



    1. makin, guys and gal, i know i've gone on about this before but does'nt anyone wonder about this?

      pending its formal transference to
      the Venezuelan Guayana Corporation (CVG) gold-mining subsidiary CVG-
      Minerven and Rusoro Mining under the terms of the Russia-Venezuela
      consortium agreement signed last November"

      rusoro is NOT a russian company.... the "Russia-Venezuela
      consortium"
      agreement to my knowledge was signed during the russian naval visit.....

      i cant seem to wrap my mind around this...check the filings for rusoro and let me know what you see about the agreement...theres some real shady business going on here and i'm not sure what it is....would'nt canada be concerned about a canadian company signing russia-venezuelan consortium agreements??

      1. CJR-- I would hope Canada would be concerned but so far not much has been open for them to do. Lets just hope they are there when we need them (with BIG sticks) OF

  3. Having the option of going to arbitration and will be going to arbitration really makes me nervous. I was hoping they would draw a line in the sand and stick to that date with no exceptions.

    1. IMO..."drawing a line in the sand" will be viewed by Chavez as a threat. We know what he thinks of threats. RM/KRY are playing it the best way they can.

      Pam

  4. Several things seem clear to me from RM's response. The problem is not with the contract. It is also clear that VZ is free to suggest altering the contract if they want, but they have not suggested any changes.

    I suspect that KRY doesn't know more than we do at this point, which is why the option of arbitration was put forward.

    I would like a more definitive statement on arbitration also. Still, the option remains alive for that course. I still favor immediate action if no permit is forthcoming by the end of the six months. At this point, I'm in all the way.