Electric Metals (USA) Limited is a U.S.-domiciled critical minerals and advanced materials company whose principal asset is the North Star Manganese Project, comprising the Emily manganese deposit in Crow Wing County, Minnesota, and a planned U.S. Gulf Coast processing facility for high-purity manganese sulfate monohydrate (HPMSM) and electrolytic manganese metal (EMM).
Company facts
- Exchange
- TSX-V
- Symbol
- EML
- Secondary symbol
- EMUS
- Industry
- Metals & Minerals
- Website
- electricmetals.com
Company overview
Electric Metals (USA) Limited
US manganese developer advancing North Star project
PEA: US$1.39B after-tax NPV(10%).Emily Indicated: 6.2Mt at 19.3% Mn.Gulf Coast HPMSM plant planned.
Electric Metals (USA) Limited is developing the North Star Manganese Project in Minnesota, with a planned Gulf Coast processing facility for high-purity manganese products. A 2025 PEA reported an after-tax NPV(10%) of US$1.39 billion and initial capex of US$474.8 million. The company also holds non-core Nevada silver assets, which it is seeking to sell.
- US$1.39B
- PEA after-tax NPV
- US$475M
- PEA initial capex
- US$452M
- HPMSM capex
- 200.76M
- Shares out
North Star Manganese PEA and FEL-1 study complete.
U.S.-domiciled manganese developer
Electric Metals (USA) Limited
- Owns the North Star Manganese Project in Minnesota.
- Completed 2025 PEA and 2026 FEL-1 costing study.
- Holds non-core Nevada silver assets for sale.
The company is focused on developing a U.S. mine-to-chemicals manganese supply chain. It has no production revenue and is at the study stage.
Key assets
Projects
Minnesota
North Star Manganese Project
Manganese-iron deposit in Crow Wing County, Minnesota. Indicated resource: 6.234 Mt at 19.27% Mn, 22.41% Fe; Inferred: 4.915 Mt at 17.50% Mn, 20.44% Fe.
Planned
Gulf Coast Processing Facility
Planned chemical plant to process concentrate from Emily and produce HPMSM, with optional EMM circuit. FEL-1 installed cost: US$452M for 200,000 tpy HPMSM.
For sale
Nevada Silver Projects
Non-core silver-gold assets in Nye County, Nevada, held for sale. Corcoran has 33.5M oz AgEq Inferred resource.
Study economics and resources
Key project metrics
Numbers from the 2025 PEA and 2026 FEL-1 costing study.
US$1.39B
After-tax net present value at 10% discount for North Star PEA, effective August 15, 2025.
US$474.8M
Initial capital expenditure from the 2025 PEA.
US$452M
Total installed cost for 200,000 tpy HPMSM facility from FEL-1 study, September 2026.
US$98.6M
Installed cost estimate for 10,000 tpy EMM circuit, same FEL-1 study.
All figures in US dollars, as reported in company disclosures.
Recent developments
Timeline
- Oct 2026
- Nevada asset sale terminated. The agreement to sell the Nevada silver assets terminated after the buyer failed to make the second payment of US$1.1M; Electric Metals retained US$350,000.
Sep 2026
- FEL-1 costing study completed. The company reported a total installed cost of US$452M for a 200,000 tpy HPMSM facility, a 3% reduction from the PEA.
Aug 2026
- Multi-workstream program launched. The company announced initiatives to strengthen the economics of the US$1.39B North Star Manganese Project.
Jun 2026
- Ore sorting results released. A simulated assessment indicated drill core could be upgraded from 8.2% Mn to 17.5% Mn while recovering 92% of manganese.
Jan 2026
- Nevada sale agreement signed. The company entered a definitive agreement to sell its Nevada silver subsidiary, later amended on May 7, 2026.
Upcoming milestones
What's next
Next
- Pre-feasibility. The company will move into pre-feasibility, flowsheet optimization for battery-grade HPMSM, and permitting and siting for the mine and plant.Planned
Ongoing
- Ore sorting integration. The company intends to incorporate ore sorting results into ongoing engineering studies.Planned
Ongoing
- Nevada asset sales. The company is in discussions with prospective buyers for the Nevada silver assets.Planned
Things to know
- Nevada sale agreement terminated after buyer missed US$1.1M payment; company retained US$350K.
- FEL-1 did not reassess project economics; EMM requires independent analysis.
- Ore sorting results from simulations only; no physical trials conducted.
- Gulf Coast processing facility site not yet selected.
Who runs the company
- Brian C. Savage, Chief Executive Officer and Director
- Natasha Tsai, Chief Financial Officer
- Dr. Quinton Hennigh, Chairman
Unclaimed AGORACOM Hub. AGORACOM wrote this overview from the company’s public filings, news releases and website. The company is not an AGORACOM client and has not reviewed it. It is not investment advice.