Skip to content
Sign in

Post

Electrovaya

Prez3.9 rating from 78 members5.7K ptsRate

Top Material

   Not sure if this will post properly,this is a picture of Elmira M. and Raj in South Korea with executives from Top Material. One of the posts states "Electrovaya vice president Elmira M. visiting Top Material, having a deep discussion for our mutual bigger and better future and role in battery industry." Top Material is currently building a 3,000 ton/yr LFP production facility. I wouldn't be surprised to find the LFP production is for Electrovaya.  Also Takeuchi is planning to electrify their equipment, this presentation highlights their plans, particularly from page 21 on. Seems to be a lot going on and should move quickly now  IMO.  <html> <body> <!--StartFragment--><a href="https://www.takeuchi-mfg.co.jp/ir/upload_file/m004-m004_01/62_4Q_setsumei_scripts_English.pdf">TAKEUCHI MFG. CO., LTD. Financial Results Briefing for Fiscal Year Ended February 2024</a><!--EndFragment--> </body> </html>


Join the conversation about Electrovaya.

Reply

Replies