Skip to content
Sign in

Post

Electrovaya

You’re reading sustainablefutures’s reply in this thread.Jump to it

Prez3.9 rating from 78 members5.7K ptsRate

Top Material

   Not sure if this will post properly,this is a picture of Elmira M. and Raj in South Korea with executives from Top Material. One of the posts states "Electrovaya vice president Elmira M. visiting Top Material, having a deep discussion for our mutual bigger and better future and role in battery industry." Top Material is currently building a 3,000 ton/yr LFP production facility. I wouldn't be surprised to find the LFP production is for Electrovaya.  Also Takeuchi is planning to electrify their equipment, this presentation highlights their plans, particularly from page 21 on. Seems to be a lot going on and should move quickly now  IMO.  <html> <body> <!--StartFragment--><a href="https://www.takeuchi-mfg.co.jp/ir/upload_file/m004-m004_01/62_4Q_setsumei_scripts_English.pdf">TAKEUCHI MFG. CO., LTD. Financial Results Briefing for Fiscal Year Ended February 2024</a><!--EndFragment--> </body> </html>


Join the conversation about Electrovaya.

Reply

Replies