
Engineer Gold Mines Ltd.
TSXV:EAU
Engineer Gold Mines Ltd. is a Vancouver-based mineral exploration company whose 100%-owned Engineer Gold Project covers 18,319 hectares in northwestern British Columbia, about 30 kilometres southwest of Atlin.
Company facts
- Exchange
- TSX-V
- Symbol
- EAU
- Industry
- Metals & Minerals
- Website
- engineergoldmines.com
Company overview
Engineer Gold Mines Ltd.
Exploring the past-producing Engineer Gold Project in BC
100%-owned Engineer Gold Project.Past-producing gold-silver mine.Exploration and permitting stage.
Engineer Gold Mines is a Vancouver-based mineral exploration company. Its 100%-owned Engineer Gold Project covers 18,319 hectares in northwestern BC, about 30 km southwest of Atlin, and includes the past-producing Engineer Gold Mine, TAG Property, and Wann River prospect. The company is in exploration and permitting, with no mining revenue; resource figures are historical estimates.
- 29.9M
- Shares issued
- C$566K
- Private placement
- 25k oz
- Historic gold
- 14,263t
- Historic production
TSXV: EAU | OTC: EGMLF | FRA: A3EEVJ
Vancouver-based mineral explorer
- 100%-owned Engineer Gold Project in northwestern BC.
- Covers 18,319 hectares, 30 km southwest of Atlin.
- Three target areas: Engineer Mine, TAG, Wann River.
Company is at exploration and permitting stage, with no mining revenue. Resource figures are historical estimates, not current mineral resources.
Past-producing
Engineer Gold Mine
Past-producing underground gold-silver mine; hosts historical inferred resource of 25,000 oz gold; subject of drilling and bulk-sample planning.
Gold-silver target
TAG Property
Gold-silver target 6 km north of Engineer Mine; 2026 infill sampling of historical drill core completed.
Orogenic gold target
Wann River prospect
Orogenic gold target 4 km south of Engineer Mine; mineralized corridor 800 m by 180 m identified.
Company figures and historical data
Key numbers
All figures as reported by the company.
C$566K
Gross proceeds from non-brokered private placement (tranches one and two combined), closed August 14, 2026.
29.9M
Shares issued as of August 14, 2026; 38.6M fully diluted including warrants and options.
25k oz
Historical inferred resource at Engineer Mine: 41,000 t at 19.0 g/t gold for 25,000 oz contained gold.
14,263t
Historical production from Engineer Mine, 1910-1952: 14,263 tonnes grading 39.4 g/t gold and 19.5 g/t silver.
Period and source as per company disclosures; historical figures are not current mineral resources.
- Nov 2026
- TAG infill sampling complete. Company completed 2026 infill drill core sampling at TAG: 538 samples totaling 685 metres from 20 holes.
Aug 2026
- Private placement closed. Closed second tranche (568,333 units at C$0.15 for C$85,250), bringing combined proceeds to C$566,405.
Aug 2026
- Camp rehabilitation began. Crews arrived to re-establish and rehabilitate two 20-person camps at Engineer Mine and TAG projects.
Jul 2026
- Phase I exploration underway. 2026 Phase I program began: soil and rock sampling at Engineer, soil geochemistry and core review at TAG.
Apr 2026
- Desktop review completed. Company completed desktop review of Engineer Gold Project and planned multi-phase diamond drill program starting summer 2026.
Mar 2026
- New CEO appointed. Spiros Kletas appointed President and CEO and joined the board of directors.
To be announced
- Phase II program fully permitted. Fully permitted for diamond drilling, excavator trenching and IP surveys in the Engineer Mine area; plans to be announced once finalized.Planned
2026
- Reactivation of bulk sample. Evaluate reactivation of permitted activities, including dewatering lower levels and a bulk sample of up to 10,000 tonnes, subject to regulatory approvals.Planned
2027
- TAG drill target modelling. Compiled TAG drilling data will be modelled to generate diamond drill targets for 2027, aimed at supporting a resource estimate; contingent on 2026 results.Planned
Key considerations
- Historical resource figures are not current mineral resources.
- Fully diluted: 38.6M shares, warrants and options.
- 2027 TAG sampling contingent on 2026 results.
Who runs the company
- Spiros Kletas, Director, President and CEO
- Dale Dobson, Chief Financial Officer
- Thomas Kennedy, Director
Unclaimed AGORACOM Hub. AGORACOM wrote this overview from the company’s public filings, news releases and website. The company is not an AGORACOM client and has not reviewed it. It is not investment advice.