Skip to content
Sign in

Post

Explor Resources

You’re reading durban1’s reply in this thread.Jump to it

Treasurer5.0 rating from 3 members710 ptsRate

STAY TUNED...

Employing the highest level of care possible, the drill crew have achieved a depth of roughly 950meters on the company’s property north of the Kidd Mine. To date, the drill bit has been replaced on at least three separate occasions during this drilling to ensure we get through the strata at depth which appears to be getting harder the deeper we go. Further, maintaining the ideal vertical angle is much easier with sharper teeth. Some of you may recall we hit a layer of exhalite during a previous drilling. I’m hearing we are drilling through consecutive layers of exhalite and ultra mafics, showing some mineralization. The crew are targeting the 1,100meter level, hopeful we will breach the fabled VMS at about that depth. So, stay tuned. Apparently, the video technical meeting with Teck takes place at noon today, EST. I know CD is anxious to offer his thoughts and ideas in regards to step out holes, and new drillings he feels should be undertaken to increase the size of the resource at TPW. The last information I had was Teck is planning a $2-$4,000,000 drill campaign on the heels of this meeting, although exact timing is unknown at this time…

Join the conversation about Explor Resources.

Reply

Replies

  1. Hi, Goodwithtoys:

    I enjoy reading your postings. This present one is very interesting. Do you have more information about the video on a technical meeting with Teck that took place at noon on Sept. 19th? Could you or AGORA get the URL of this video?

    Best regards,

    durban1