Skip to content
Sign in

Post

Falcon Oil and Gas Ltd.

You’re reading lanman1’s reply in this thread.Jump to it

Treasurer3.8 rating from 15 members395 ptsRate

Transparency

From observations, since we now own only 33% of the play, regardless of the

recent amendment that the entire Mako will be shared in ownership and technical

information, does not improve the transparency to us lowly retail owners.

Personally i know absolutely nothing of the well logs or operational finding

that mol/exxon have drilled. We know they may spud a well in Jan (not a given),

until i see an nr verifying they avctually did it. I know absolutely nothing on

how many wells they want ready before they start testing?

Are they gonna use the new well plus a combination of our old wells, or are

they gonna say later.. well lets drill another new well besides the one in

Jan. before its worth while bringing in the test gear. The other thing.. yes

exxon is highly qualified and we are fortunate to have them as a partner,

but even they can have trouble on the Jan WELL , SUCH AS MOVEABLE

water etc. and this could delay the zsolnok testing even further.

These are just my opinions and observations, but i believe i have valid concerns.

It would be nice to have all the info and logs of exxons work to date.

Join the conversation about Falcon Oil and Gas Ltd.

Reply

Replies

  1. >From observations, since we now own only 33% of the play, regardless of therecent amendment that the entire Mako will be shared in ownership and technicalinformation, does not improve the transparency to us lowly retail owners.


    Just thought I'd mention that if and when the 'Mako Basin' is unitized, and the tract interests are announced, that these interests are not set in stone.


    "In many units, notably units created outside the United States, a mechanism exists to allow the parties to readjust their individual economic returns to the extent that it is later substantiated that their individual equity interest or ownership of the reservoir, on a percentage basis, increases or decreases. This mechanism to readjust the individual equity interests is called redetermination."


    Here is a real-world example, from Husky Energy:


    Terra Nova Oil Field


    The Terra Nova oil field is located approximately 350 kilometres southeast of St. John’s, Newfoundland and Labrador, 35
    kilometres southeast of the Hibernia oil field, in 91 to 100 metres of water. The Terra Nova oil field is divided into three distinct areas, known as the Graben, the East Flank and the Far East. Our current pooled interest in the Terra Nova field is 12.51%. This interest is subject to change, pending re-determination once the field has been further delineated.

    ---------

    Note: Falcon/Exxon and MOL have agreed to at least one re-determination

    ----------

    The Preliminary stage will first involve an Exchange of data between contract groups wishing to unitize. The essence is to evaluate the proportion of reserves lying in the respective contract areas. Even though there are confidentiality clauses as the basis of this agreement, this is to this author’s mind, a pitfall of the unitization scheme because companies will have to share seismic data through which they may be disclosing technical or patent secrets. There is often the stage of joint development of a Well so as to gather more information. The cost of the joint well is often borne by the party on whose own bloc the work is done.These processes can take a long time and parties will keep bringing data which that favour them or give them higher share of the reserve.

    The main problem with unitization is Redetermination because it is a process to cure the errors of tract participation when reserves were allocated on the basis of seismic data which has been proven wrong by actual development of the reservoir.

    A drafting technique has been introduced in many unitization agreements to avoid the dangers of endless redetermination by; (a) limiting the number of redetermination; (b) placing a vote range to initiate it (C) providing that existing
    participation cannot be re-adjusted except on extreme case and ;(d) imposing cost on the party requesting it frivolously.This notwithstanding, unitization costs money and time, and often ends in long litigation.

    -----

    It's also important to know that "Proportions of participation in unitization is more of a contest than a negotiation."

    I'm not sure how that will play out, since Exxon is on both sides of the equation.


















    1. Amongst those that have followed this stock closely the last couple of years I gather there is increasing consensus that if there is a suitable inducement put in the pot for full unitisation our BoD ought to consider it seriously.If nothing else it would be extend the glassnost and ententente cordiale that is said to have broken out in the last month between the three partners.My spy behind the curtains almost calls it menage a trois given the outbreak of very fulsome hugs and warm kisses.Would you believe even Doctor Szabo is participating.

      I thought I had heard that January 8 had been pencilled in for kick off or as you connosseurs call it spudding time for the F1 on the joint venture land.My friend in Hungary last week had no doubt at all much of the equipment did seem to be already assembled on the site and therefore if nothing has started yet it very soon will be.

      Will we get an announcement? I dont know.But if Exxon are reluctant in this instance they might soon change their mind if in one or two working days this BB or for that matter the Fool BB in the UK becomes full of of translated Hungarian newspaper articles and up to date local pictures.I know Exxon are shy and notionally are running this show but our Management will very quickly have to inform them they have little choice because the TSE might be minded very soon to order a halt in stock trading.

      Not much is happening in the O & G sector in the Rest of the World in 1Q 2009.Dont be too surprised therefore if the eyes of the Market will be focused on Exxon and their 3 wells in the Mako Trough.

      1. Good stuff Bouggie. I hope you also remembered to send a nice pm to Solyomtwo confirming just how appreciative this BB would be if he could set aside a little time in the next few days to read through the Hungarian press.

        1. I have no doubt that our dear Soly will deliver the goods if provided by the hungarian press. Good read boogie, the anticipation to exxon's work is keeping our toes twirling in excitement and I will expect the share price to be resistant at 0.40 from now on before its next resistance at 0.60 soon !!

          Many more boogie knights to come.......

      2. Just reviewing a few things from the past and came across this from last year



        "ExxonMobil announced plans to begin commercial evaluation of unconventional hydrocarbon potential covering 184 thousand acres and exploration activities on an additional 387 thousand acres in the Mako Trough in southeast Hungary."



        The 184,000 acres is the Falcon / Exxon / Mol area. The additional 387,000 acres is the Exxon / Mol area. They clearly made a distinction of the scope of work in these areas.

        Going by this statement, I'm assuming that the 2 wells in the Exxon/Mol area are exploration wells, and the F-1 well, which should be spudded soon, is an appraisal well.

        They will all most likely be tested in the spring, however the types of tests might differ. Being exploration wells, the objective is not to determine flow rates, but simply to determine if the gas actually exists at those locations.

        The difference between these types of wells is clearly explained in the Falcon / Exxon operating agreement. I can't find anywhere where the Foldeak-1 is referred to as an 'appraisal well', however, since it is within 1 km of the Mako-6, I can't imagine the need for another exploration well in that location.


        Appraisal Well means any well (other than an Exploration Well or a Development Well) whose purpose at the time of commencement of drilling such well is to appraise the extent or the volume of Hydrocarbon reserves contained in an existing Discovery.

        Exploration Well means any well the purpose of which at the time of the commencement of drilling is to explore for an accumulation of Hydrocarbons, which accumulation was at that time unproven by drilling.





      3. I thought I had heard that January 8 had been pencilled in for kick off or as you connosseurs call it spudding time for the F1 on the joint venture land.My friend in Hungary last week had no doubt at all much of the equipment did seem to be already assembled on the site and therefore if nothing has started yet it very soon will be.

        Well Bouggie, I have heard something too, but my calendar has January 12 pencilled in for spudding the Foldeak-1, either way work begins in the Falcon lands. Whether will there be an announcment? I'm sure hoping so, but then something may crop up in the papers ;)

  2. >Are they gonna use the new well plus a combination of our old wells, or are they gonna say later.. well lets drill another new well besides the one in Jan. before its worth while bringing in the test gear.



    Exxon is the operator, and will do whatever they think is best. It isn't their policy to be issuing updates on their day to day operations. Instead, four times a year they put out a report telling people how much money they made :)

    Their last report was in October, in which they stated:

    "Also in exploration we continue to progress our high potential unconventional natural gas opportunities in Europe and North America. In both the lower Saxony Basin in Germany and the Mako Trough in southeast Hungary we began drilling operations and will conduct production tests over the next several months."







    1. Thx for reply! So exxon will tell us how much money they made around

      Feb., and if all goes well , several months means we might get some test results,

      this fall. However the initial testing if things look good could leak out as early

      as around June.. but only in the form of a stock uptick. IMHO the stock is

      cheap today, and may move a bit more prior to June, as the prize is big!

      But this will be a speculative move, although drilling to date by exxon has,

      or does not appear to have created any excitment, but then again the best

      part of the trough has always been centeres around the MAKO-6 or

      sweet area.

      1. >So exxon will tell us how much money they made around Feb., and if all goes well , several months means we might get some test results



        Don't hold your breath waiting for test results. Providence has a similar JV with Exxon in Ireland, and this is what their "results" look like

        "Whilst confidentiality conditions between the partners restrict Providence from commenting specifically on work programmes either in the past or future, the Company can confirm that it is very pleased with the status to date and views the future with optimism."

        I'm sure regardless of test results, Falcon will be pleased and optimistic :)

        What really counts is whether or not Exxon decides to proceed to phase 2 of the project, which according to the timeline in MOL's presentation, should be announced sometime in November.













        1. "What really counts is whether or not Exxon decides to proceed to phase 2 of the project, which according to the timeline in MOL's presentation, should be announced sometime in November."



          Sandy9: I'm optomistic, but the guys on this board better realize what you

          say above is all we may get. Some may expect some super flow report,

          which could exist, but we may not see it unless mab can convince them.

          They may want to keep it confidential.. dunno

          Anyway, we look forward to November!!

          Atb

          Sandy9 (Thx again!)



        2. What really counts is whether or not Exxon decides to proceed to phase 2 of the project, which according to the timeline in MOL's presentation, should be announced sometime in November.

          Lanman, yes, you hit the spot



          db

        3. "Don't hold your breath waiting for test results."

          BMO stated clearly in their September 12, 2008 research paper on page 4 "The second catalyst would be results from the latest well currently being drilled on the Mako Trough by ExxonMobil. As ExxonMobil highlighted Hungary in its most recent quarterly report, we would expect that any material event would be published. Results are expected by year-end 2008."

          I doubt anyone at Falcon speaks for Exxon - so I am assuming that the person doing the BMO research paper on Falcon has some communication with the good folks at Exxon.

          Just a thought.

          1. >I doubt anyone at Falcon speaks for Exxon - so I am assuming that the person doing the BMO research paper on Falcon has some communication with the good folks at Exxon.

            Well it all sounded plausible until you got to the last sentence :)

            "Results are expected by year-end 2008."

            Here's a typical Exxon response when asked about daily activities:

            Q: Anything further on the Orphan Basin offshore, north of Newfoundland?

            A: We have drilled the Great Barasway well there and we are evaluating that data and we will decide what the next prospect will be.



            Of course there is still lots of hope that we will get some results, I'm just saying that there is also the possibility that we won't. Falcon will be allowed to report on the F1 well if Exxon gives the OK.



            19.3 Public Announcements

            (A) Operator shall be responsible for the preparation and release of all public announcements and statements regarding this Agreement or the Joint Operations; provided that no public announcement or statement shall be issued or made unless, prior to its release, all the Parties have been furnished with a copy of such statement or announcement and the approval of at least two (2)
            Parties which are not Affiliates holding fifty percent (50%) or more of the Participating Interests has been obtained. Any such Notice shall be provided a minimum of seven (7) Days prior to its release. Where a public announcement or statement becomes necessary or desirable because of danger to or loss of life, damage to property or pollution as a result of activities arising under this
            Agreement, Operator is authorized to issue and make such announcement or statement without prior approval of the Parties, but shall promptly furnish all the Parties with a copy of such announcement or statement.

            (B) If a Party wishes to issue or make any public announcement or statement regarding this Agreement or the Joint Operations, it shall not do so unless mutually agreed, and such agreement shall not be unreasonably withheld; any dispute over whether consent is unreasonably withheld may be referred to arbitration under Article 18.2; and provided that, notwithstanding any failure to obtain such approval, no Party shall be prohibited from issuing or making any such public announcement or statement if it is necessary to do so in order to comply with the applicable laws, rules or regulations of any government, legal proceedings or stock exchange having jurisdiction over such Party or its Affiliates as set forth in Article 15.2.